For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

SECTION 8.01 — GENERAL POLICIES

Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § SECTION 8.01

Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/23301068-4f98-494d-a81f-5f4d1fdc6d06

SECTION 8.01: GENERAL POLICIES.

(a) Conformance to Plans. (1) Public Improvements. Proposed public improvements serving new development shall conform to and be properly related to the public facilities elements of the Comprehensive Plan, other adopted master plans for public facilities and services, and applicable capital improvements plans, and shall at a minimum meet the service levels specified in such plans. (2) All Plats within the City and its ETJ, and corresponding Construction Plans, shall provide for thoroughfares as shown in the Comprehensive Plan. The alignment and right-of-way width of all proposed thoroughfares shall be in general conformance with the Comprehensive Plan. Minor adjustments to thoroughfare alignments may be allowed without amending the Comprehensive Plan if the Director of Development Services believes the new alignment meets the spirit and intent of the Comprehensive Plan and will not compromise public safety or traffic efficiency. The design and construction of all proposed thoroughfares shall be in conformance with the City's Engineering Standards, and shall be subject to approval by the Director of Engineering Services. Such approvals shall be required prior to any Plat approval. Comprehensive Plan Amendment. If a significantly different roadway alignment or type (from what is shown on the Comprehensive Plan) is proposed, then the Comprehensive Plan shall be amended prior to any Plat approval. Submission of a Traffic Impact Analysis (TIA) of the proposed amendment by the developer may be required if the Director of Development Services and the Director of Engineering Services determine that such an analysis is necessary to fully assess the impact of the proposal upon the City's overall thoroughfare network. (3) Water and Wastewater Plans. The design and construction of the water system and wastewater system to serve the development shall be in conformance with the City's master plans for water and wastewater facilities, and with the Engineering Standards, and shall be subject to approval by the Director of Engineering Services prior to approval of the Construction Plans and the Final Plat. (4) Storm Drainage Standards. The design and construction of the storm drainage system to serve the development shall be in conformance with but not limited to the City's master plans for stormwater drainage, with the City's Storm Drainage Ordinance, and with the Engineering Standards, and shall be subject to approval by the Director of Engineering Services prior to approval of the Construction Plans and the Final Plat. (b) Adequate Public Facilities. (1) Adequate Services for Areas Proposed for Development. Land proposed for development in the City and in the City's ETJ shall be served adequately by essential public facilities and services, including but not limited to water distribution, wastewater collection and treatment, roadways, pedestrian circulation, storm drainage conveyance, and park and recreational facilities. Land shall not be approved for platting or development until adequate public facilities necessary to serve the development exist or provisions have been made for the facilities, whether the facilities are to be located within the property being developed or offsite. a. Street Access. A Plat will not be approved unless all of the proposed lots have safe and reliable street access for daily use and emergency purposes. i. A Plat will not be approved unless all of the proposed lots have direct access to an improved public street (or a public street that will be improved during construction of the proposed development) to the City's minimum design and paving standards, or to an approved public way that is connected to an improved public street. ii. Except for lots which are provided access from an approved cul-de-sac, all lots within a development shall have at least two (2) means of access or approach. Where development phasing or constraints of the land prevent the provision of a second, separate means of access, the City may accept a temporary street connection provided that a second permanent access point can be reasonably anticipated with future development of adjacent properties. iii. For properties situated adjacent to an existing or planned median-divided thoroughfare, at least one (1) of the required access points shall occur at, or through access easement connection to, a median opening. (See Diagram 8.01-1) b. Water. A Plat will not be approved unless all of the proposed lots are connected to a public water system which is capable of providing adequate water for health and emergency purposes. i. Except for lots along an approved cul-de-sac, all lots shall be provided service connections from a looped water main providing water flow from two (2) directions or sources. ii. Water service shall be sufficient to meet the fire flow requirements of the proposed development, except where a suitable alternative means of fire protection is approved by the Fire Chief. iii. The City may require the phasing of development and/or improvements to the water system to ensure adequate fire protection. c. Wastewater. A Plat will not be approved unless all of the proposed lots are served by an approved means of wastewater collection and treatment. i. The projected wastewater discharge of a proposed development shall not exceed the proposed capacity of the wastewater system. ii. The City may require the phasing of development and/or improvements to the sanitary sewer system so as to maintain adequate wastewater capacity. d. Storm Drainage. Increased stormwater runoff attributable to new development shall not cause impacts to adjoining, upstream or downstream properties. Impacts are defined as an increase in runoff between pre and post development. Where the projected runoff from a new development exceeds runoff from pre development conditions, the City may require the phasing of development, the use of control methods such as retention or detention, obtaining off-site drainage easements, and/or the construction of off-site drainage improvements as means of mitigation. (2) Property Owner's Responsibilities. The property owner shall be responsible for, but not limited to, the following: a. Dedication and Construction of Improvements. The property owner shall dedicate all rights-of-way and easements for, and shall construct and extend, all necessary on-site and off-site public improvements for water distribution, wastewater collection and treatment, streets, storm drainage conveyance, and other improvements that are necessary to adequately serve each phase of a proposed development at service levels that are consistent with the City's applicable master facilities plans and construction design standards. b. Abutting Substandard Streets. Where a substandard street abuts or traverses a proposed development, the City may require the property owner to dedicate additional right-of-way and to improve the street to the City's current design and construction standards as set forth in the Engineering Standards, and in the Comprehensive Plan. Such requirements to improve the substandard street to the City's current standards shall only be imposed following careful review of factors including, but not limited to: i. The impact of the new development on the street; ii. The timing of the development in relation to need for the street; and iii. The likelihood that adjoining property will develop in a timely manner. In the case of frontage or service roads for state or federally designated highways, the entire abutting right-of-way shall be dedicated and improved to that agency's applicable construction design standards if such improvement is approved by the agency. (Also refer to Section 8.04 of this Ordinance, and the City's Impact Fee Ordinance.) c. Facilities Impact Studies. The City may require that a developer prepare a comprehensive Traffic Impact Analysis (TIA), flood or drainage study or downstream assessment, or other facilities impact study(ies) in order to assist the City in determining whether a proposed development will be supported with adequate levels of public facilities and services concurrent with the demand for the facilities created by the development. The study(ies) shall identify, at a minimum: i. The adequacy and capacities of existing facilities; ii. The nature and extent of any current deficiencies; and iii. The public improvements that will be needed to meet adequate levels of service assuming development at the intensity proposed in the application. The study(ies) shall be subject to approval by the Director of Engineering Services prior to approval of the Preliminary Plat and the Construction Plans. The City also may require, at the time of approval of a subsequent application (e.g., Final Plat), an update of a facilities impact study(ies) approved in connection with a prior application (e.g., Preliminary Plat). d. Future Extension of Public Facilities. The property owner shall make provisions for future expansion of the public facilities as needed to serve future developments, subject to the City's oversize participation policies, if applicable; e. Operations and Maintenance of the Public Facilities. The property owner shall provide for all operations and maintenance of the public facilities, or shall provide proof that a separate entity will be responsible for the operations and maintenance of the facilities; f. Fiscal Security. The property owner shall provide all fiscal security required for the construction of the public facilities; g. Approvals from Utility Providers. The property owner shall obtain all necessary approvals from the applicable utility providers other than the City, and shall submit written verification of such approvals to the City with the Construction Plans; and h. Compliance with Utility Providers. The property owner shall comply with all requirements of the utility providers, including the City and applicable drainage districts. (3) Rough Proportionality; Fair Share. There is a direct correlation between the increased demand on public facilities and systems that is created by a new development, and the City's requirements to dedicate rights-of-way and easements and to construct a fair and proportional share of public improvements that are necessary to offset such impacts such that new development does not negatively affect the City as a whole. The City desires that a new development project contribute its fair and proportional share of such costs.

( Ordinance 19-08-70 adopted 8/20/2019 )

Ask a question about Frisco law

Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.