SECTION 8.03 — DRAINAGE AND ENVIRONMENTAL STANDARDS

Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § SECTION 8.03

Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/d6184e34-6b79-4ec0-a5fc-c2a47d554666

SECTION 8.03: DRAINAGE AND ENVIRONMENTAL STANDARDS.

(a) Drainage and Stormwater Management Policies. (1) Easements. Drainage easements shall be dedicated for public drainage features in accordance with requirements of this ordinance. Drainage easements and features shall be included as a portion of buildable (habitable structure) lot(s) and not as a lot by itself unless specifically authorized by the Director of Engineering Services. If a large development related feature is authorized on a separate lot, a homeowner's association is required. Storm drainage easements shall be located along side property lines, and such easements shall be contained fully on one lot or tract, and shall not be split across the property line between two (2) lots or tracts. (2) Stormwater Quality. Designs for new development shall manage stormwater in a manner that protects water quality by addressing the development's potential to cause erosion, pollution, siltation, and sedimentation in the MS4 and natural Major Creeks. The goal is to maintain after development, to the maximum extent practicable, the predevelopment characteristics in the Major Creek, which ultimately receives stormwater runoff from the development. It is the developer's responsibility to ensure that designs for new development meet the stormwater management requirements in the General Permit for Stormwater Discharges from Construction Activities issued by the TCEQ and its successor agencies. This permit includes the requirement for measures that will be installed during construction to control pollutants in stormwater discharges after construction operations have been completed. (3) Stormwater Runoff. Stormwater runoff shall be calculated anticipating a fully developed watershed. The Comprehensive Plan, existing land use, and zoning maps shall be used to determine fully developed conditions. The Director of Engineering Services reserves the right to review the determination of fully developed conditions and may require revisions. (4) Minimum Finish Floor Elevations. The Director of Engineering Services may require minimum finish floor elevations (MFF) to provide flood protection on certain lots contained within the subdivision. The MFFs shall be shown on the plat. These elevations shall incorporate the most current floodplain management criteria or other criteria as necessary to avoid damages. The minimum finish floor elevation shall be two feet above the fully developed 100-year water surface elevation where the MFF is associated with a natural Major Creek or open channel. When the MFF is necessitated by situations other than a natural Major Creek or open channel, the MFF shall be set by the developer's engineer and agreed upon by the City. The following note or an amended version appropriate to the specific plat shall be added to any plat upon which the Director of Engineering Services requires the establishment of minimum finish floor elevations: "The City reserves the right to require minimum finish floor elevations on any lot contained within this addition. The minimum elevations shown are based on the most current information available at the time the plat is filed and are subject to change." (5) Off-site Drainage. a. When any proposed development requires off-site grading where stormwater runoff has been collected or concentrated, it shall not be permitted to drain onto adjacent property except in existing Major Creeks, channels, storm sewers or streets unless one of the following is provided: i. Notarized Letter of Permission. The letter shall state that the permission shall bind the owner of the affected property and be a covenant running with the land. It shall also refer to the plans for the improvements creating the need for the permission. The letter shall be filed with the applicable County. ii. Drainage Easement. A drainage easement shall be dedicated for Major Creeks, ditches, or drainage channels and shall be of a width sufficient to comply with the criteria outlined in the Engineering Standards. b. In the event the developer cannot obtain a notarized Letter of Permission or a drainage easement, the developer shall provide the City with documentation of all efforts, including evidence of a reasonable offer made to the affected property owner, and one of the following: i. Written Request for Assistance. The City may pursue acquisition of these easements through negotiations. If the negotiations are unsuccessful, the request may, at the developer's option, be submitted to City Council for consideration of acquisition through eminent domain. Any expenses, including attorney's fees, incurred by the City to acquire or attempt to acquire an easement shall be paid by the developer. ii. Notarized Letter. With the concurrence of the Director of Engineering Services, the developer may execute a notarized letter stating the developer shall save and hold harmless the City from any and all claims or suits for damage arising from storm water runoff. The letter shall be in a form approved by the City Attorney. (b) Preliminary Stormwater Management Plan. (1) A preliminary storm water management plan (SWMP) shall be prepared for all developments in accordance with the requirements set forth in the City's Development Application Handbook. The purpose of the SWMP is to identify permanent water quality feature opportunities for the development. (2) The preliminary SWMP shall be prepared in coordination with the preliminary drainage plan on all projects where both are required. The preliminary SWMP and the preliminary drainage plan may be shown on the same sheet. When a preliminary drainage plan is not required, the preliminary SWMP shall indicate the existing drainage patterns and runoff coefficients and the proposed changes to these items. (3) The preliminary SWMP must comply with the standards and criteria outlined in this ordinance, the Engineering Standards, and the Erosion Siltation Control Ordinance. The plan may satisfy the storm water management portion of the Storm Water Pollution Prevention Plan (SWPPP) that is required for construction activities; however, the SWMP is not a substitution for the SWPPP. The City's review of the preliminary SWMP does not constitute acceptance of the final SWMP or the final development plans. (4) The developer shall provide a preliminary SWMP for the area proposed for development. For amended plats or plats with a previously accepted preliminary SWMP, the accepted preliminary SWMP shall be enforced unless a revised preliminary SWMP is required. (5) Three (3) paper copies of the preliminary SWMP plan shall be submitted with the submittal of a preliminary plat, replat, or minor plat for review and acceptance. The plan shall be labeled as "Preliminary." Upon acceptance of the plan, the plan shall be signed, sealed, and dated by the engineer, or shall contain a statement showing the engineer's name and license number and affirming the plan was prepared under the direction of the engineer and that the plan is preliminary. (c) Preliminary Drainage Plan. (1) This plan shall show the watershed affecting the development and how the runoff from the fully-developed watershed will be conveyed to, through, and from the development. It must comply with the standards outlined in this Ordinance and the drainage design criteria found in the Engineering Standards. The preliminary drainage plan is a guide for the detailed drainage design. The review of the preliminary drainage plan does not constitute final drainage plan approval or authorize a waiver to this Subdivision Ordinance. (2) For any property involved in the development process, a preliminary drainage plan shall be provided, at the developer's expense, for the area proposed for development. For property with a previously accepted preliminary drainage plan, the accepted preliminary drainage plan may be submitted and enforced unless a revised preliminary drainage plan is required by the City due to lot reconfiguration or other conditions created by the new plat. The Director of Engineering Services may waive the requirement for a preliminary drainage plan if the submitted plat is not anticipated to cause any significant change in runoff characteristics from a previously accepted drainage study or for single residential properties where no drainage problems are anticipated. If the applicant requests a waiver in writing, a copy of any previous drainage plan shall be provided. (3) Three (3) paper copies of the preliminary drainage plan shall be submitted with the submittal of a preliminary plat, replat, or minor plat for review and acceptance. The plan shall be labeled as "Preliminary." The plan shall be stamped by and dated by the engineer. (d) Floodplain Development Requirements. (1) All development proposed adjacent to or within the 100-year floodplain shall be in accordance with the City's Flood Hazard Prevention Ordinance and this Ordinance. (e) Major Creeks. (1) 100-Year Floodplain Restrictions. For the health, safety and welfare of the City's residents and for the conservation of water, storm drainage and sanitary sewer facilities, the City prohibits development of any portion of a property that lies within the 100-year floodplain of any Major Creek. Major Creeks shall be protected from destruction or damage resulting from clearing, grading, and dumping of earth, waste or other foreign materials. Clearing, grading, excavation or filling of any area within the 100-year floodplain or within any Major Creek shall be prohibited unless authorized in writing by the City. (2) Major Creek Restrictions. All Major Creeks (See Diagram 8.03-1, Section 12) shall be maintained in an open natural condition. Each Major Creek is subject to the following requirements for all types of development: a. The 100-year floodplain and Erosion Hazard Setback shall be dedicated on the Final Plat to the City as a single lot or may be owned and maintained by an HOA, pursuant to Section 8.11 of this Ordinance. At no time shall any portion of the 100-year floodplain exist or be within any single-family or two-family residential lot. Erosion Hazard Setback requirements are located in the Engineering Standards. b. The Commission may waive any of these dedication requirements for a Replat that was originally platted prior to the adoption of this requirement (i.e., the adoption date of the City's Major Creek Ordinance No. 99-09-25, which was on September 21, 1999). (3) Access. Access shall be dedicated for maintenance purposes as required by the Director of Engineering Services (See Diagrams 8.03-2 and 8.03-3, Section 12). (4) Retaining Wall(s). A retaining wall(s) may be allowed between a house and the Major Creek as approved by the Director of Engineering Services. (5) Adjacent Street(s) Widths. The size of streets adjacent to a Major Creek shall have a minimum right-of-way width of fifty feet (50'). The City shall participate in fifty percent (50%) of the paving costs when the City determines that a Type D thoroughfare, sixty feet (60') of right-of-way width, is necessary for traffic safety, public access, and/or public on-street parking. (6) Adjacent Street(s) Types (see Diagram 8.03-3, Section 12). a. Phases. Street requirements shall be reviewed per development phase. b. Parallel Streets. A minimum 60% of the linear frontage of the Major Creek shall be adjacent to a parallel street. c. Cul-de-sac Streets. No more than one cul-de-sacs in a row. Cul-de-sacs shall comply with the following criteria (See Diagram 8.03-4, Section 12): i. A minimum 50% of an adjacent cul-de-sac bulb shall be open to the Major Creek and no residential lot shall encroach within the area between this line and the Major Creek. ii. An entry monument(s) or feature(s) as well as landscaping shall be provided at the end of the cul-de-sac and a pathway of a minimum 12 feet in width shall be provided to the Major Creek as approved by the Director of Development Services. (7) Fences. Fences adjacent to a Major Creek shall comply with the following criteria (See Diagram 8.03-5, Section 12): a. Have a maximum fifty percent (50%) opacity; b. Have a height of six (6) feet to eight (8) feet as measured from grade at that location; c. Ornamental metal fences, with either masonry columns or a masonry base of a maximum three (3) feet in height shall be located along the rear and side of the lots, are subject to City review and approval by the Director of Development Services; and d. The lot owner is responsible for the maintenance of the fence. (8) Exceptions for Planned Development. For properties which have an approved Concept Plan that is part of a Planned Development Ordinance adopted prior to the effective date of the Major Creek Ordinance (Ordinance No. 99-09-25), subsection (e)(6) shall not apply; provided, however, said properties are subject to the following conditions: a. Any lot that backs to the 100-year floodplain shall have a minimum rear yard setback of twenty-five feet (25'); b. Any lot that sides to the 100-year floodplain shall have a minimum side yard setback of fifteen feet (15'). c. Alternating cul-de-sacs and looped streets shall be provided at intervals not to exceed twelve hundred feet (1,200') for access to the 100-year floodplain; and d. The 100-year floodplain shall be available to public access from the end of a cul-de-sac. (9) Additional Studies. At the request of the City, the property owner shall submit additional studies, including but not limited to the following, as deemed appropriate and necessary by the City, as part of the Preliminary Plat submittal requirements. These studies shall be considered during review and approval of the Preliminary Plat. a. Wetland Delineation Study; b. Habitat Study; c. Vegetative Study; d. Erosion Hazard Setback Study; e. Storm Drainage Study; f. Riparian (i.e., Tributary) Study; g. Flood Study; and h. Downstream Assessment Study.

( Ordinance 19-08-70 adopted 8/20/2019 )