SECTION 8.06 — THOROUGHFARE SCREENING
Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § SECTION 8.06
Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/02806a23-1cd6-4158-85c7-a86971af0a93
SECTION 8.06: THOROUGHFARE SCREENING.
(a) Required Screening. Screening is required for all single-family detached, two-family, and townhome lots and subdivisions as follows: (1) Back of Lots. The rear of all lots that back to a Type D or higher class Thoroughfare; (2) Side of Lots. The side of all lots that side to a Type D or higher class Thoroughfare, unless a lot sides to a median-divided entry street into a subdivision; and (3) Between Streets/Alleys. Between any street and an adjoining parallel alley. (b) Screening Plan. (1) Preliminary Screening Plan. A Preliminary Screening Plan shall be submitted for review and approval with the Preliminary Plat. (2) Final Screening Plan. A Final Screening Plan, including entry features and showing all elevations and materials, shall be submitted with the Construction Plans. The Screening Plan shall be reviewed and considered for approval by the Director of Development Services prior to approval of the Construction Plans, and prior to scheduling a Pre-Construction Meeting (refer to Section 5.02). (3) Engineering Standards. Screening walls and fences shall be designed in accordance with the City's Engineering Standards. Structural elements shall be sealed by a licensed professional engineer and approved by the City. (4) Timing of Installation and Inspection. Upon installation of the required screening, the developer shall contact the City's Landscape Architect and the Director of Engineering Services to request final inspections of screening elements. All required screening shall be installed prior to City issuance of a Letter of Final Acceptance (see Section 5.05) unless delayed in accordance with subsection (b)(5). (5) Surety Provided for Delay. The developer may delay the installation of screening by providing surety to guarantee the installation of required screening. Such surety shall be in an amount and format that is approved by the Director of Development Services and by the Director of Engineering Services. Required screening shall be installed within six (6) months following the date of issuance of the Letter of Final Acceptance (refer to Section 5.05). (c) Landscape Plan. (1) Landscape Plan. A Landscape Plan for landscaping that will be installed for the development, including landscaping for common and amenity areas, entryways and thoroughfare screening, shall be submitted with the Construction Plans and shall be approved by the Director of Development Services prior to approval of the Construction Plans and prior to scheduling a Pre-Construction Meeting (refer to Section 5.02). (2) Standards. Landscape materials and installation shall be in accordance with Landscape Requirements in the Zoning Ordinance. (3) Timing of Installation and Inspection. Upon installation of all landscaping, including that required for thoroughfare screening, the developer shall request a final inspection of landscaping elements by the Director of Development Services. All required landscaping shall be installed prior to the City's issuance of a Letter of Final Acceptance (see Section 5.05) and Certificates of Occupancy for homes, excluding model homes which may be released early. (4) Surety Provided for Delay. The developer may delay the installation of landscaping by providing surety to guarantee the installation of required landscaping. Such surety shall be in an amount and format that is approved by the Director of Development Services and by the Director of Engineering Services. Required landscaping shall be installed within six (6) months following the date of issuance of the Letter of Final Acceptance (refer to Section 5.05). (d) Screening & Landscaping Options. Screening required by subsection (a) shall be installed by the developer in accordance with the approved Screening and Landscaping Plan(s), as applicable. The design of such screening shall conform with one of the options shown in Table 8.06-1 and Diagrams 8.06-1, 8.06-2(a), 8.06-2(b), 8.06-2(c), 8.06-3, 8.06-4(a) and 8.06-4(b), Section 12. (1) Landscape Edge. All landscape edges provided for required screening shall be located within a private "non-buildable" lot (shown on the Preliminary and Final Plats) that is dedicated to, owned by, and maintained by the subdivision's Homeowners' Association (HOA). Required landscape edges shall be exclusive of all required street and right-turn rights-of-way, drainage easements, and utility easements. (2) Screening Walls & Fences. All required screening walls and fences shall be: a. Located entirely within the required landscape edge (except for at cul-de-sac bulbs, Option 4, where the required ornamental fence shall be located entirely upon the cul-de-sac lots abutting the adjacent street); b. Subject to the approval of the Director of Development Services; c. Of the minimum (and maximum) heights as shown in Table 8.06-1, Section 12; d. Maintained by the HOA (or by the private lot owners if the HOA is dissolved in the future); e. The minimum height of required walls and fences shall be measured from the nearest alley edge, rear lot property line (where no alley exists), or street-side sidewalk grade, whichever is higher. The maximum height of columns, including capstones, shall be nine feet (9'); f. Any area between alley paving and a screening wall or fence shall be paved with concrete unless otherwise approved by the Director of Engineering Services; and g. A minimum five-foot (5') wide wall maintenance easement, dedicated to the HOA, shall be provided on all lots abutting the required screening along the full length of the required screening wall or fence, unless separated by an alley. Such easement shall be shown on the Preliminary and Final Plats. (3) Trees and Shrub Screens. All required screening trees and shrubs shall be planted within the landscape edge (except for as provided for cul-de-sac bulbs, Option 4). All trees and other landscape materials required for screening shall be of evergreen drought-tolerant species selected from the City's Approved Plant List in the Zoning Ordinance, and shall be subject to approval by the Director of Development Services. Minimum tree size shall be at least three caliper inches (3"), and a single species of tree shall not exceed forty-five percent (45%) of the plantings for all screening options. All trees shall be planted a minimum of four feet (4') from easements, curbs, utility lines, screening walls, fences, sidewalks and alleys, as determined by the Director of Development Services. a. Solid Shrub Screens. For solid shrub screens, evergreen shrubs from the City's Approved Plant List (in the Zoning Ordinance) shall be used that are low-maintenance, drought-tolerant, and insect- and disease-resistant. Shrubs shall be spaced such that they will provide a solid minimum six-foot (6') tall screen upon planting. (4) Cul-De-Sac Bulbs. For all cul-de-sac bulbs that abut, or "open", onto an adjacent street (Option 4), the following additional screening standards shall apply: a. All required trees and other landscape materials shall be located within the side yards of the cul-de-sac lots abutting the adjacent street unless a landscape edge, dedicated to and maintained by the HOA, is provided. b. Trees required for screening do not count toward the number of trees required for residential lots in the Zoning Ordinance. c. A minimum ten foot (10') separation, or the required landscape edge width, whichever is greater, shall be provided between the right-of-way for the cul-de-sac and the right-of-way for the adjacent street. A sidewalk shall be provided to connect the sidewalk along the adjacent street to the sidewalk along the cul-de-sac within a twenty foot (20') pedestrian access easement. (5) Berms. Berms may be used in conjunction with any screening option, subject to approval by the Director of Engineering Services and Director of Development Services. Berms shall be placed within the landscape edge on private property (i.e., not within public right-of-way), shall not exceed a three-to-one (3:1) slope, and shall be designed such that they do not hinder maintenance, storm drainage, accessibility or visibility. Topographic information for berms shall be shown on the Landscape Plan and on the Grading and Drainage Plans for the development. (e) Wall Elevations & Living Screens. (1) If the top-of-wall elevation for a required screening wall is less than six feet (6'), as measured in accordance with subsection (d)(2)e, a solid, irrigated living screen shall be used in combination with the screening wall to provide the necessary screening at the appropriate height from grade. (2) An irrigated living screen consisting of large trees and additional large evergreen shrubs that are appropriate for screening purposes (selected from the City's Approved Plant List in the Zoning Ordinance) shall be planted within the landscape edge where the height deficiency occurs. (3) The species, sizes, spacing and arrangement of all trees and shrubs that are required for screening shall be subject to the discretion and approval of the City's Landscape Architect and the Director of Development Services. All plant materials used for living screens shall be insect- and disease-resistant, and shall be plant species that are well freeze-hardy, low maintenance, well-adapted to the north central Texas area, and drought-tolerant such that they are self-sustaining with minimal irrigation and care. (4) When an irrigated living screen is utilized, the Landscape Plan (subsection (c)) shall demonstrate adequate visual screening at the heights required and within required time frames, and such living screen shall be subject to the approval of the Director of Development Services. (5) Tree and living screen requirements on sites with topography changes are subject to the approval of the City's Landscape Architect and the Director of Development Services. (f) Irrigation Requirements. An automatic, underground irrigation system shall provide one hundred percent (100%) coverage for all living screens and plantings, and shall conform with the following: (1) Line Placement. Irrigation lines shall be placed a minimum of two and one-half (2-1/2) feet from the sidewalk. Reduction of this requirement is subject to review and approval by the Director of Development Services. The main irrigation lines, section lines and zone valves for irrigation systems shall be placed outside of required right-of-way corner clips. (2) Type of Irrigation. Trees and shrubs shall be irrigated by deep-watering bubbler irrigation lines only on a separate line or zone (for targeted irrigation during periods of drought). Other landscaping may be irrigated per the irrigation standards in the Zoning Ordinance. Separate valves shall be provided to turn off all or some irrigation lines/zones during periods of drought, water conservation or freezing weather temperatures. (3) Detectors. Evapotranspiration (ET) controllers are required on all irrigation systems. (4) Water Meter. The developer is responsible for installing irrigation water meter(s). The Director of Engineering Services shall approve all water meter sizes and placement. All water meters shall be easily accessible from the street. (g) HOA Responsibilities. All developments that have thoroughfare screening, entry features or common amenity areas shall be required to have a mandatory HOA to own and maintain such features (see Section 8.11). If an HOA fails to maintain any required screening device, the Director of Public Works and/or the Director of Development Services, at their discretion, shall have the authority to cause the removal and/or replacement of such required screening at the expense of the HOA.
( Ordinance 19-08-70 adopted 8/20/2019 )
Ask a question about Frisco law
Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.
