For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-515 — Technical regulations

Code of Ordinances, City of Grand Prairie, Texas (Supp. No. 117, Update 1: codified through Ordinance No. 1857-2026, adopted April 27, 2026) · Grand Prairie City Code § 13-515

Corpus is an independent public-information project, not the official City of Grand Prairie website. Stable reference: corpuslaw.us/code/91089a48-640e-460f-9089-710e44f5b6be

Sec. 13-515. - Technical regulations.

(a) On-site requirements. (1) Blowout prevention. In all cases, blowout prevention equipment shall be used on all wells being drilled, worked over or in which tubing is being changed. Protection shall be provided to prevent blowout during gas operations as required by and in conformance with the requirements of the commission and the recommendations of the American Petroleum Institute. The operator must equip all drilling wells with adequate blowout preventers, flow lines and valves commensurate with the working pressures involved as required by the commission. (2) Bradenhead gauge. A bradenhead gauge must be installed at the wellhead prior to first sales. (3) Cathodic protection. Within one hundred eighty (180) days of its completion date, each gas well shall be equipped with a cathodic protection system to protect the production casing from external corrosion. The inspector may approve an alternative method of protecting the production casing from external corrosion. (4) Chemical and materials storage. All chemicals and/or regulated materials shall be stored in such a manner as to prevent, contain, and facilitate rapid remediation and cleanup of any accidental spill, leak, or discharge of a hazardous material. Operator shall have all material safety data sheets (MSDSs) for all hazardous materials on-site. All applicable federal and state regulatory requirements for the proper labeling of containers shall be followed. Appropriate pollution prevention actions shall be required and include, but are not limited to, chemical and materials elevated and raised from the ground (e.g., wooden pallets), bulk storage, installation and maintenance of secondary containment systems, and protection from stormwater and weather elements. (5) Closed-loop drilling fluid systems. Closed-loop drilling fluid systems shall be used instead of lined reserve pits. (6) Compliance. Operator shall comply at all times with all applicable federal, state and city requirements. (7) Discharge. No person shall place, deposit, discharge, or cause or permit to be placed, deposited or discharged, any oil, naphtha, petroleum, asphalt, tar, hydrocarbon substances, hazardous waste, hazardous materials, regulated materials, or any refuse including wastewater or brine from any gas operation or the contents of any container used in connection with any gas operation in, into, or upon any public right-of-way, alleys, streets, lots, storm drain, ditch or sewer, sanitary drain or any body of water or any private property in the city. In the event of a suspected release of any chemicals to the environment, the operator must provide at the request of the inspector, a detailed description of the chemical, including, but not limited to, a list of the source chemicals and their specific material safety data sheets, the composition of the chemical by percentage, the composition of any chemicals listed as proprietary on material safety data sheets and copies of any laboratory data that identifies the composition of the chemical. The inspector shall be sole determining individual as to whether a suspected release of chemicals to the environment has occurred. An operator or an operator's subcontractors who fail to provide this information shall be considered to be in violation of this article. (8) Drilling fluids. Low toxicity glycols, synthetic hydrocarbons, polymers, and esters shall be substituted for conventional oil-based drilling fluids. (9) Drill stem testing. All open hole formation or drill stem testing shall be done during daylight hours. Drill stem tests may be conducted only if the well effluent during the test is produced through an adequate gas separator to storage tanks and the effluent remaining in the drill pipe at the time the tool is closed is flushed to the surface by circulating drilling fluid down the annulus and up the drill pipe. (10) Drilling fluid storage pit. No drilling fluid storage pits shall be located within the city or its ETJ. (11) Dust, vibration, odors. All drilling and production operations, and vehicular traffic related thereto, shall be conducted in such a manner as to minimize, so far as practicable, dust, vibration, or noxious/nuisance odors, and shall be in accordance with the best accepted practices incident to drilling for the production of gas and other hydrocarbon substances in urban areas, as well as all pertinent codes and ordinances of the City of Grand Prairie regulating dust, vibration and odors. All equipment used shall be so constructed and operated so that, vibrations, dust, odor or other harmful or annoying substances or effect will be minimized by the operations carried on at any drilling or production site or from anything incident thereto, to the injury or annoyance of persons living or working in the vicinity; nor shall the site or structures thereon be permitted to become dilapidated, unsightly or unsafe. Proven technological improvements in industry standards of drilling and production in this area shall be adopted as they become available if capable of reducing factors of dust, vibration and odor. A written dust abatement plan shall be submitted with the drilling application. This plan shall detail the best management practices the operator will utilize to prevent the creation of any dust nuisances, including the frequency and information on any planned soil amendments. The dust control plan for wells with pad site boundaries less than one thousand (1,000) feet from protected uses or data campuses shall contain dust mitigation measures that at a minimum provide for the use of a dust control/soil stabilization agent on all nonpaved surfaces. This agent shall be reapplied according to manufacturer recommendations, but no less frequently than annually. Daily watering or equivalent best management practices approved by the city's environmental services director shall be used as necessary. After review of the plan, the city's environmental services director may mandate additional practices the operator shall take to prevent the creation of any dust nuisances. (12) Electric lines. All electric lines to production facilities shall be located in a manner compatible to those already installed in the surrounding area or subdivision. (13) Electric motors. Only electric prime movers or motors shall be permitted for the purpose of pumping wells. No electric power shall be generated on location. All electrical installations and equipment shall conform to the city ordinances and the appropriate national codes. (14) Emergency response plan. Prior to the commencement of any gas or other hydrocarbons production activities, operator shall submit to the inspector an emergency response plan establishing written procedures to minimize any hazard resulting from drilling, completion or producing of gas wells. Said plan shall use existing guidelines established by the commission, the state environmental regulatory agency, department of transportation and/or the U.S. Environmental Protection Agency. If a gas well is determined by the commission to be producing hydrogen sulfide gas (H 2 S), the operator shall immediately cease operation of that well or facility and immediately contact the city's environmental services department. (15) Equipment painted. All production equipment on the site shall be painted and maintained at all times, including pumping units, storage tanks, buildings and structures. (16) Fire prevention; sources of ignition. Firefighting apparatus and supplies as approved by the fire department and required by any applicable federal, state, or local law shall be provided by the operator, at the operator's cost, and shall be maintained on the drilling site at all times during drilling and production operations. The operator shall be responsible for the maintenance and upkeep of such equipment. Each well shall be equipped with an automated valve that closes the well in the event of an abnormal change in operating pressure. All well heads shall contain an emergency shut off valve to the well distribution line. (17) Flowback operations. a. Flowback operations to recover fluids used during fracture stimulation shall be performed during daytime hours only unless the city and the gas well inspector approves such operations during non-daytime hours. b. At no time shall the well be allowed to flow or vent directly to the atmosphere without first directing the flow through separation equipment or into a portable tank. (18) Fracture operations. a. All formation fracture stimulation operations shall be conducted during daytime hours. b. At no time shall the well be allowed to flow or vent directly to the atmosphere without first directing the flow through separation equipment or into a portable tank. c. All fracturing operations shall comply with the noise abatement study. d. If fracture tanks are utilized for the fracturing operation, such tanks may not be stacked on-site. (19) Fracture ponds. a. An operator may request to construct a fracture pond if the distance to the nearest protected use is greater than five hundred (500) feet. A fracture pond design plan shall be submitted with the drilling application. This plan shall include an engineering design component and a landscape/fencing design component. Approval may be granted if the following criteria are met: 1. Ponds are encouraged to be incorporated, installed and fenced within the perimeter of the gas well pad site. Above ground surface ponds shall only be allowed if immediately adjacent to the pad site and if landscaped and fenced in compliance with the standards for pad sites. Ponds not immediately adjacent to the gas well site shall only be constructed below the existing ground surface and must be greater than five hundred (500) feet from a protected use. 2. The pond shall be designed to permanently hold sufficient water to prevent the creation of any nuisance/vector problems. A vector control plan shall be submitted with the gas drilling permit application. The operator shall be responsible for implementing all tasks within the approved vector control plan. The presence of mosquito larvae within the fracture pond shall be a violation of this article. As permitted by state law, the pond design shall be in compliance with the City of Grand Prairie's Uniform Development Code article 14 "Drainage". The application shall include a detail grading plan prepared by a civil engineer licensed in the State of Texas. The pond design shall include measures, such as shallow safety ledges, to prevent drowning accidents. The pond's size shall be designed based on the water supply to minimize the pond's footprint. 3. No artificial liners shall be permitted. 4. A chain link fence, a minimum of six (6) feet in height with a nine (9) gauge, two-inch mesh, with all exposed components of said fence and mesh being coated with polypropylene or vinyl in a black color, shall enclose all completed fracture ponds that are located outside of the gas well pad site boundary. The location of said fence shall be depicted on the site plan drawing included with the gas well permit submittal documents. Ponds that are located within the city limits shall be totally enclosed by an irrigated forty-foot landscape buffer. Said fence gate shall remain locked unless operator personnel are present. 5. The pond will not conflict with the aesthetics of any surrounding developments. 6. Ponds shall be maintained in a manner utilizing best management practices to ensure the integrity of the pond. "Best management practices" shall mean structural, nonstructural and managerial techniques that are recognized to be the most effective and practical means to control water storage in open pits in an urban or rural setting. 7. All existing ponds within the city limits shall be brought into compliance with the fencing and landscaping requirements as contained herein by January 1, 2012. b. Upon annexation, any existing fracture ponds in violation of this article shall be either be brought into compliance with this article or removed and the sites restored to the previous conditions. Compliance or removal shall be completed within one (1) year of annexation. An operator may apply for a one-time, six-month administrative extension from the city's environmental services director. The pad site operator shall be responsible for any costs associated with the restoration project. c. No oil and gas waste byproducts or salt water shall be allowed into any fracture pond. d. For gas drilling permit applications received after January 18, 2011 all fracture ponds shall be required to be removed five (5) years from the date of permit issuance. An operator may apply for a one-time, two-year administrative extension from the city's environmental services director. The environmental services director shall be authorized to require such measures as necessary to minimize the impact of the fracture pond upon neighboring properties as a condition of the approval of the administrative extension. Any additional extension requests or the appeal of a denial of an administrative extension shall require city council approval in accordance with section 13-510. Extension requests, whether administrative or requiring city council approval, shall be requested in writing at least six (6) months prior to any expiration date. The pad site operator shall be responsible for the cost to remove the fracture pond and restore the site to match surrounding ground surface to establish a minimum of eighty (80) per cent vegetation. (20) Freshwater wells. a. It shall be unlawful to drill any well, the center of which, at the surface of the ground, is located within the wellhead protection zone surrounding any City of Grand Prairie municipal well. b. The operator of a gas well shall provide the city's environmental services director with a "pre-drilling" and "post-drilling" water analysis from any freshwater well within seven hundred and fifty (750) feet of the gas well pad site boundary line. This sampling shall meet the following requirements: 1. Water sampling must be collected and analyzed in accordance with established federal sampling and laboratory protocol. All laboratories must be Texas Commission on Environmental Quality or U.S. Environmental Protection Agency certified laboratories. Pre-approval by the city's environmental services director of all sampling methods, preservation techniques, analytical methods and contract laboratories is required. This information is required to be submitted at the time of permit application for review. 2. At a minimum, the following parameters shall be tested for: Methane, chloride, sodium, barium, strontium, total dissolved solids, total suspended solids, pH, volatiles and semi-volatiles. Other parameters may be required at the discretion of the environmental services director. 3. Post-drilling sampling shall be required no less than sixty (60) days following the completion of fracturing operations and no longer than ninety (90) days following completion of fracturing operations. 4. This freshwater well sampling requirement may be waived if a well is determined by the city's environmental services director to be abandoned or the freshwater well owner waives the right to have the well sampled. 5. If at a later date, the city's environmental services director believes that evidence exists that indicates a freshwater well may have been negatively impacted by any drilling operations, the city's environmental services director may require the operator to conduct such sampling and analysis as necessary to determine the source of any problems or contamination. If the city's environmental services director determines that there is reasonable suspicion that drilling operations have negatively impacted the quality or quantity of water from a freshwater well, the operator shall provide an approved temporary source of water to the freshwater well owner while an investigation is conducted. If the investigation reveals that drilling operations are responsible for a negative impact on the quality or quantity of water from a freshwater well, the operator shall be required to provide a permanent approved source of water to the freshwater well owner. A negative impact shall include, but shall not be limited to, a reduction in flow from the well, changes to water quality that result in exceedances of any standards established for drinking water by the federal or state environmental agencies, changes in color, smell or other aesthetic items that renders the water unpalatable for human consumption or contact, and any changes that render the water unsuitable for irrigation or livestock purposes. 6. All sampling and analysis costs shall be responsibility of the operator. If the city incurs any costs associated with the investigation of a freshwater well complaint, the operator shall be required to reimburse the city within thirty (30) days of receiving an invoice. c. It shall be unlawful for any drilling activities to have a negative impact as defined in subsection (a)(20)b.5 of this section. (21) Freshwater usage. Any connection to a freshwater source, including but not limited to, the city public drinking water system, private wells, other surface and/or groundwater sources, shall comply with all applicable cross connection control requirements. (22) Grass, weeds, trash. All drill and operation sites shall be kept clear of high grass, weeds, and combustible trash. (23) Hazardous plan. Hazardous materials management plan shall be on file with the fire marshal and the inspector. The hazardous materials plan shall be kept current with any additions, modifications, and/or amendments concerning all construction related activities, oil and natural gas operations, and oil and gas production. Updated plans shall be submitted within two (2) business days of any modifications. (24) Lights. No person shall permit any lights located on any drill or operation site to be directed in such a manner so that they shine directly on public roads, adjacent property or property in the general vicinity of the operation site. To the extent practicable, and taking into account safety considerations, site lighting shall be directed downward and internally so as to avoid glare on public roads and adjacent dwellings and buildings within three hundred (300) feet. (25) Landfarming. Landfarming shall be prohibited within the city limits of Grand Prairie. Additionally, landfarming shall be prohibited within any area of the ETJ that is within the watershed of Joe Pool Lake. This prohibition shall supersede any permit or authorization from the commission or any other state or federal agency. (26) Muffling exhaust. Exhaust from any internal combustion engine, stationary or mounted on wheels, used in connection with the drilling of any well or for use on any production equipment shall not be discharged into the open air unless it is equipped with an exhaust muffler or mufflers, or an exhaust muffler box constructed of noncombustible materials sufficient to suppress noise and prevent the escape of obnoxious gases, fumes, or ignited carbon or soot. (27) Private roads for gas well drill sites. Prior to the commencement of any drilling operations, all private roads used for access to the drill site boundary to include fracture ponds and the operation site itself shall be a minimum of ten (10) feet wide, have an overhead clearance of fourteen (14) feet and shall be surfaced and maintained to prevent dust and mud and as required below. The point of connection of a private road to a city, county, or state street/highway shall be required to be processed through city's building inspection as a gas well approach and driveway permit. The city's transportation planner may assist the applicant with securing access agreements with other required governmental entities. The gas well approach and driveway shall be located, designed, and surfaced with reinforced concrete. The gas well approach and driveway, including the mud shaker, shall be constructed prior to the initiation of any other on-site construction activities. All private roads shall be designed to prevent the creation of a dust or mud nuisance. The city engineer or his designee will review the plans for general compliance as designed and sealed by a civil engineer registered in the State of Texas. The gas well approach and driveway shall be designed and constructed as per the "Typical Gas Well Approach and Driveway Detail and Specifications" and are to be constructed of reinforced concrete as specified. All private roads are required to be constructed of reinforced concrete within one thousand (1,000) feet of the public road providing access to the limits of the pad site. In those instances where one thousand (1,000) feet of private road will not reach the pad site other dustless road options, such as four-inch minimum (Type B or D) H.M.A.C. placed over six-inch minimum TxDOT Flexbase (NCTCOG Spec. Item #301.5) or eight-inch thick minimum TxDOT Flexbase with dust control agent may be considered for the portion of the road greater than one thousand (1,000) feet from the public road with this consideration to be reviewed on a case by case basis. Any consideration for alternative dustless road material for options only over the said one thousand-foot limit, will be considered as part of the permit review and decisions may be appealed to the city manager who has the final decision making authority. (28) Reduced emission completion. After fracturing or refracturing, operators shall employ appropriate equipment and processes as soon as practicable to minimize natural gas and associated vapor releases to the environment. All salable gas shall be directed to the sales line as soon as practicable or shut in and conserved. All wells that have a sales pipeline shall be required to employ reduced emission completion techniques and methods. If authorized by the city, flaring may be used in some instances as a temporary alternative to venting. In such a case, open flames shall not be located closer than three hundred (300) feet from any building not used in operations on the drill site and such open flame shall be screened in such a way as to minimize nuisance and detrimental effects to surrounding properties. (29) Salt water wells. No salt water disposal wells shall be located within the City of Grand Prairie or its ETJ. Produced water or other wastewater collection/transportation pipelines are prohibited without city council approval. Individual or centralized wastewater treatment facilities are prohibited without city council approval. (30) Security. a. The operator must keep a watchman or security personnel on-site during the drilling, fracturing, or reworking of a well when other workmen are not on the premises. b. An operator shall be required to employ an off-duty certified peace officer to direct traffic at the entrance to the pad site during all times of high truck traffic accessing the site, including, but not limited to pad site construction, fracture pond construction, drilling, fracturing, flowback, and any rework activity that requires a rig. The off-duty certified peace officer shall be directed to ensure that all traffic entering and exiting the pad site are utilizing the approved transportation route. A written record shall be maintained of any violators and shall be available on-site for inspection by city staff. (31) Signs. a. A sign shall be immediately and prominently displayed at the gate on the temporary and permanent site fencing erected pursuant to section 13-516 of this article. Such sign shall be durable material, maintained in good condition and, unless otherwise required by the commission, shall have a surface area of not less than two (2) square feet, nor more than four (4) square feet and shall be lettered with the following: 1. Well name and number; 2. Name of operator; 3. The emergency 911 number; 4. Telephone numbers of two (2) persons responsible for the well who may be contacted in case of emergency; and 5. The address of the well. b. Permanent weatherproof signs reading "DANGER NO SMOKING ALLOWED" shall be posted immediately upon completion of the well site fencing at the entrance of each well site and tank battery or in any other location approved or designated by the fire chief of the city. Sign lettering shall be four (4) inches in height and shall be red on a white background or white on a red background. Each sign shall include the emergency notification numbers of the fire department and the operator, well and lease designations required by the commission. c. All wellheads and tank batteries must have signs as required by the commission. d. A sign shall be placed at the exit to the site that reads "ALL TRUCK TRAFFIC IS REQUIRED TO FOLLOW THE APPROVED TRANSPORTATION ROUTE. VIOLATORS SUBJECT TO $2,000 FINE. TODOS LOS CAMIONES ESTAN OBLIGADOS A SEGUIR LAS RUTAS DE TRANSPORTE APROBADAS. LOS INFRACTORES ESTAN SUJETOS A MULTAS DE $2,000." The sign lettering, size, and background shall meet city specifications. A directional arrow shall be placed immediately below the above sign and shall indicate the proper direction of travel for exiting truck traffic. The sign shall be placed in a position viewable by exiting truck traffic and shall not be placed on city right-of-way. The sign and the proposed sign location shall be reviewed and approved by the city during the application review process. (32) Storage of equipment. On-site storage is prohibited on the operation site. No equipment shall be stored on the drilling or production operation site, unless it is necessary to the everyday operation of the well. Lumber, pipes, tubing and casing shall not be left on the operation site except when drilling or well servicing operations are being conducted on the site. No vehicle or item of machinery shall be parked or stored on any street, right-of-way or in any driveway, alley or upon any operation site which constitutes a fire hazard or an obstruction to or interference with fighting or controlling fires except that equipment which is necessary for drilling or production operations on the site. The fire department shall be the entity that determines whether equipment on the site shall constitute a fire hazard. No refinery, processing, treating, dehydrating or absorption plant of any kind shall be constructed, established or maintained on the premises. This shall not be deemed to exclude a conventional gas separator or dehydrator. (33) Storage tanks. All tanks and permanent structures shall conform to the American Petroleum Institute (A.P.I.) specifications unless other specifications are approved by the fire chief. All storage tanks shall be equipped with a secondary containment system including lining with an impervious material. The secondary containment system shall be a minimum of three (3) feet in height and one and one-half (1½) times the contents of the largest tank in accordance with the fire code, and buried at least one (1) foot below the surface. Drip pots shall be provided at the pump out connection to contain the liquids from the storage tank. All tanks shall be set back pursuant to the standards of the commission and the National Fire Protection Association, but in all cases, shall be at least twenty-five (25) feet from any public right-of-way or property line. Each storage tank shall be equipped with a level control device that will automatically activate a valve to close the well in the event of excess liquid accumulation in the tank. No meters, storage tanks, separation facilities, other above ground facilities, well heads, or flow lines, shall be placed in the 100-year floodplain, without the prior consent of the engineering division pursuant to subsection 13-504(i), "Gas well permit required" of this article. No such structures are permitted in the floodway. Tanks must be at least three hundred (300) feet from any other combustible structure. (34) Stormwater regulations. The operator shall comply with all federal, state, and local stormwater quality regulations, including any notice of intent (NOI) and notice of termination (NOT) requirements. (35) Surface casing. Surface casing shall be run and set in full compliance with the applicable rules and regulations of the commission. (36) Tank battery facilities. Tank battery facilities shall be equipped with a remote foam line and a lightning arrestor system. (37) Transportation route. All vehicle truck routes must be approved by the city prior to permit issuance. The transportation director shall have the authority to require an alternate route to minimize the impact to surrounding uses. All truck traffic shall be required to follow the approved transportation route. (38) Valves. Each well must have a shutoff valve to terminate the well's production. The fire department shall have access to the well site to enable it to close the shut-off the valve in an emergency. (39) Waste disposal. Unless otherwise directed by the commission, all tanks used for storage shall conform to the following: a. Operator must use portable closed steel storage tanks for storing liquid hydrocarbons. Tanks must meet the American Petroleum Institute standards. All tanks must have a vent line, flame arrester and pressure relief valve. All tanks must be enclosed by a fence applicable to the issued permit classification. No tank battery shall be within one hundred (100) feet from any building used, or designed and intended to be used, for human occupancy, or from other combustible structures. b. Drilling mud, cuttings, liquid hydrocarbons, and all other field waste derived or resulting from or connected with the drilling, reworking or deepening of any well shall be discharged into an aboveground self-contained tank system. All disposals must be in accordance with the rules of the commission and any other appropriate local, state, or federal agency. c. Unless otherwise directed by the commission, waste materials shall be removed from the site and transported to an off-site disposal facility not less often than every thirty (30) days. Water stored in on-site tanks shall be removed as necessary. d. All waste shall be disposed of in such a manner as to comply with the air and water pollution control regulations of the state, this article and any other applicable ordinance of the city. (40) Work hours. For all permits, work hours for site development (other than drilling and flowback operations), truck deliveries of equipment and materials associated with drilling and/or production, well servicing, site preparation and other related work conducted on the well site shall be limited to daytime except in cases of fires, blowouts, explosions and any other emergencies. (41) Air quality. a. No person shall cause or allow a discharge and/or emission to the atmosphere. b. Failure to maintain all equipment as to prevent excessive emissions is a violation of this article. c. The operator must comply with the approved leak detection and compliance plan, report to the environmental services department within fifteen (15) minutes of identification of a leak, and repair leaks in the time specified by the inspector. d. The environmental services director shall be authorized to require the utilization of a third party expert as chosen by the city to conduct testing of airborne emissions resulting from any padsite activities in order to ensure compliance with state and federal regulations and/or in response to health concerns. Based on the recommendation of the expert, emission control equipment may be required. (42) Cellars. All cellars must be completely filled in prior to first sales. (b) Well setbacks. It shall be unlawful to drill any well, the center of which, at the surface of the ground, is located: (1) Within twenty-five (25) feet from any outer boundary line; (2) Within twenty-five (25) feet from any storage tank, or source of ignition; (3) Within seventy-five (75) feet of any public street, road, highway or future street, right-of-way line; (4) Within three hundred (300) feet from any building used, or designed and intended to be used, for human occupancy unless a larger setback is required by the gas well permit; (5) Within one hundred (100) feet of any building accessory to, but not necessary to the operation of the well; (6) Within two hundred (200) feet to any freshwater well owned by an individual who has signed a mineral lease for the property containing the freshwater well. The measurement shall be in a direct line from the closest well bore to the freshwater well bore; (7) Within five hundred (500) feet to any freshwater well owned by an individual who has not signed a mineral lease for the property containing the freshwater well. The measurement shall be in a direct line from the closest well bore to the freshwater well bore; (8) Within seventy-five (75) feet of the pad site boundary line; or (9) Within one hundred (100) feet of any type of surface water conveyance, including, but not limited to creeks, streams, lakes, ponds, drainage ditches, or other constructed stormwater conveyance systems. The distance shall be calculated from the well bore, in a straight line, without regard to intervening structures or objects, to the closest exterior point of any object listed in subsections (b)(1) through (b)(9) above. (c) Well head easement. For all drilling operations, a well head easement shall be submitted by the operator for approval by the city with the permit application. The easement shall be filed and recorded with the appropriate agency of the county government in which the well is located prior to the commencement of drilling operations subject to the following provisions: (1) Such easement shall have a radius of three hundred (300) feet as calculated from the well bore, in a straight line, without regard to intervening structures or objects. (2) Such easement may be filed as a separate instrument dedication, or be dedicated on a land subdivision plat approved by the city. (3) No future residential lots shall be platted within the well head easement until the well is abandoned pursuant to the provisions of this article, and the drill site easement has been vacated by the city. (4) No vertical residential or nonresidential structures of any type, except those required for the gas drilling and production operation may be constructed within such easement. Only hard surface paving (flat-work) and site landscaping shall be permitted. City staff may approve amended easement language that permits certain accessory uses and structures, such as communication, recreational, athletic and agricultural facilities with use restrictions, to be placed inside the well head easement. Such amendments and use restrictions shall be approved as a part of the permit application review process. (5) Where a public street or highway right-of-way is located within and adjoins the perimeter boundary of the well head easement, such right-of-way shall be credited toward the area and distance required for the establishment of such easement, so that said right-of-way area shall be excluded from the easement. For the purpose of enforcing this provision, nonresidential land uses shall be defined by article 4 of the Grand Prairie Unified Development Code for well sites situated inside the city limits; or by the Comprehensive Plan Future Land Use Map of the City of Grand Prairie, as amended, for well sites situated within the city's extraterritorial jurisdiction. (6) The written authorization(s) from all affected property owners shall be recorded on the easement instrument for easements that traverse more than one (1) property ownership boundary. Or, absent the necessary and required authorizations from adjoining property owners, such easement shall encompass the land area located inside the fenced boundary of the gas well drilling pad site as established by the permit application. (7) When considering amendments to the three hundred-foot well head easement requirement, city staff shall review concept plans, plats, long-range land use plans and similar documents addressing future development proposed around the well head site to ensure that the safety and welfare of future residents is not compromised. The amended easement area shall be depicted on the site plan drawing, or on an attaching sheet, included with the gas well permit application. Alternative easement configurations denied by staff may be appeal to the city council. (8) Within fifteen (15) days of the filing and recordation of the well head easement, the operator, at operator's expense, shall erect at least four (4) warning signs, measuring no less than ten (10) inches by fourteen (14) inches in size, mounted a minimum of five (5) feet above ground surface on a two and three-eighths-inch galvanized steel post or equal. Said warning signs shall be placed upon the perimeter boundary of the well head easement at conspicuous locations nearest any right-of-way, street, roadway, public thoroughfare, or residential zoning district or subdivision. Said signs shall contain the following information: a. With a minimum one-inch high letters contain: "GAS WELL HEAD EASEMENT BOUNDARY" b. With a minimum one-half-inch high letters contain operator's emergency phone number: "IN CASE OF EMERGENCY CALL (###) ###-####." (9) A "landscape and no-build easement," as permitted by subsection 13-516(a)(2)d. of this article, may be dedicated and recorded in lieu of the "well head easement" described herein. Such substitution of easements shall only be permitted for those pads sites developed under the "vegetative concealment" (Option 2) screening requirements specified in section 13-516 of this article. (d) Noise restrictions. (1) a. No well shall be drilled, redrilled, or any equipment operated at any location in such a manner so as to create any noise which causes the exterior noise level when measured at the nearest protected use receiver's/receptor's property line or one hundred (100) feet from the nearest protected use structure (as measured to the closest exterior point of the building), whichever is closer to the receiver/receptor, that exceeds the ambient noise level by more than five (5) decibels during daytime hours and more than three (3) decibels during nighttime hours. Fracing operations may not exceed the ambient noise level by more than ten (10) decibels. Flowback operations may not exceed the ambient noise level by more than five (5) decibels during daytime hours or more than three (3) decibels during nighttime hours. b. An operator shall not drill or redrill a well or operate any equipment in such a manner so as to create pure tones where one-third octave band sound pressure level in the band with the tone exceeds the arithmetic average of the sound pressure levels of two (2) contiguous one-third octave bands by five (5) dB for center frequencies of five hundred (500) hertz and above, and by eight (8) dB for center frequencies between one hundred sixty (160) and four hundred (400) hertz, and by fifteen (15) dB for center frequencies less than or equal to one hundred twenty-five (125) hertz. c. An operator shall not drill or redrill a well or operate any equipment in such a manner so as to create low-frequency outdoor noise levels that exceed the following decibel levels: 16 hertz octave band | 65 dB 32 hertz octave band | 65 dB 64 hertz octave hand | 65 dB (2) The operator shall be responsible for establishing and reporting to the city the predrilling ambient noise level prior to the issuance of a gas well permit. A seventy-two-hour noise study shall be utilized to establish ambient noise levels. The seventy-two-hour time span shall include at least one (1), twenty-four-hour reading during either a Saturday or Sunday. The timeframe for this study shall be designed to avoid the influence of wind interference on the study. The determination as to whether subsequent studies are needed to reevaluate ambient noise conditions shall be at the sole discretion of the city's environmental services director. The applicant shall submit a proposed ambient noise level study plan to the city's environmental services director for approval prior to conducting the study. The proposed plan shall contain a proposed testing schedule and other details as required by the city's environmental services director. (3) At any time in a measurement period, no noise may exceed the maximum sound level standard plus twenty (20) dB(A). The time period of monitoring will be continuous over a minimum of fifteen (15) minutes and will use the A-weighting network reported in decibel units. Data shall be recorded and reported as Leq which shall mean an average measure of continuous noise that has the equivalent acoustic energy of the fluctuating signal over the same period. (4) All noise readings recorded shall be collected in accordance with the requirements contained in the City's Code of Ordinances chapter 13, article XIII, Noise Restrictions. (5) All workover operations shall be restricted to daytime hours. "Workover operations" shall mean work performed in a well after its completion in an effort to secure production where there has been none, restore production that has ceased or increase production. (6) All gas drilling permit applications must include a detailed noise abatement study, conducted by a qualified noise consultant/engineer approved in advance by the city's environmental services director. This study shall include: a. A description of the proposed facility/operation. b. A determination of the ambient noise level utilizing a noise survey of a minimum of seventy-two (72) hours and shall include at least one (1), twenty-four-hour reading during either a Saturday or Sunday. c. An analysis of any significant sources of noise, including noise that will be generated during the drilling, fracturing, flowback, and operational phases of the drill site. This analysis must include a comparison of the potential noise generation with the applicable noise standards. d. An analysis of any abatement measures necessary to bring the proposed facility into compliance with the city's noise standards. If the analysis indicates that abatement measures are required to meet the standards, then the applicant must submit a detailed plan that describes the specific measures that will be utilized. This shall include product information and a location diagram. All soundproofing shall comply with accepted industry standards. The abatement measures shall be installed prior to the commencement of any drilling activities. e. A description of any continuous noise monitoring program if required by subsection (d)(7) of this section. f. A description of any noise abatement measures if required by subsection (d)(7) of this section. This shall include product information and a location diagram. (7) If the proposed gas well is within one thousand (1,000) feet of any protected use, the operator must comply with these additional noise abatement measures: a. Exterior noise levels, including pure tone and low frequency data, shall be continuously monitored to ensure compliance. This data shall also include an audio recording to help identify the source of sound level "spikes" throughout the logging period. The continuous noise monitoring equipment shall be capable of wireless transmission of real-time noise and audio data. Access to this real-time data shall be made available to the city's environmental services director and the inspector. The cost of all such monitoring shall be borne by the operator. The noise readings shall also be submitted to the inspector on a weekly basis in an electronic format or other format specified by the inspector. The weekly report shall contain all noise data including pure tone and low frequency readings. The report shall state whether the pad site is in compliance with the noise requirements. If the report states that the pad site is not in compliance with the noise standards, then the report shall state the measures that are being taken to return the pad site to compliance and the timeframes for implementing these remedial measures. b. At a minimum, the operator shall install noise reduction blankets on the pad site boundaries facing any protected uses within one thousand (1,000) feet. The height of boundary blankets shall at a minimum be thirty (30) feet. The height may be increased at the discretion of the environmental services director in response to topographic necessity. In addition to the boundary barriers, the operator must, at a minimum, install additional noise reduction blankets to mitigate noise generated from the rig substructure, the rig floor area, brake drum housings, mud pumps, diesel motors, and generators. The blankets shall be constructed of a fire-retardant material approved by the fire department. The boundary noise reduction blankets for class 1 well sites shall be required to meet a standard of STC 30 or greater. Blankets that meet an equivalent national standard will be considered on a case-by-case basis by the environmental services director. Additionally, any exhaust from an internal combustion engine or compressor, stationary or mounted on wheels, must be controlled through the utilization of a "hospital" grade muffler or equivalent control device. The noise abatement study required in subsection (d)(6) above shall include a site plan showing the location of the boundary noise reduction blankets and a rig layout diagram detailing the location of all other noise reduction blankets, "hospital" grade mufflers, and any other noise reduction equipment. All noise abatement measures including, but not limited to, noise walls and blankets, must be maintained in good repair at all times. c. During nighttime operations, the operation of vehicle audible back-up alarms shall be prohibited or replaced with approved nonauditory signaling systems, such as spotters or flagmen. Deliveries of pipe, casing and heavy loads shall be limited to daytime hours, except for emergency situations. The Derrick Man and driller shall communicate by walkie-talkie or other nondisruptive means only when the Derrick Man is in the derrick. Horns may not be used to signal for connection or to summon crew (except that a horn may be used for emergency purposes only). The operator shall conduct on-site meetings to inform all personnel of nighttime operations noise control requirements. (8) The noise requirements contained within this article are hereby declared to be necessary to protect the public health of the community, and are applicable to all current gas drilling permits and any new gas drilling permits. (9) Timeframe for boundary noise reduction blankets. a. If at any time, drilling, well completion, or fracturing operations cease for a period of greater than ninety (90) days, the applicant shall be required to immediately remove any noise walls and any supporting structures. The environmental services director may grant a one-time, thirty-day extension per well. Additionally, the environmental services director may waive this requirement for pad sites that have sufficient natural/vegetative/ topographical screening that prevent the view of the boundary noise reduction blankets from city streets or from protected uses. b. To facilitate enforcement of this provision, all applicants with pad sites that have boundary noise reduction blankets shall be required to provide written notice by letter or email. This notice, required within forty-eighty (48) hours of the termination of drilling, well completion, or fracturing operations, shall be directed to the environmental services director or his/her designee. (e) Lift compressors. Lift compressors are restricted to gas drilling pad sites and must be at least seven hundred (700) feet from the nearest protected use, unless a lesser distance is authorized by the city council (subsection 13-510(f)(10), and shall have secondary containment as required by subsection 13-515(a)(33). Additional requirements for lift compressors are as follows: (1) A lift compressor shall be considered temporary if the installation is for less than ninety (90) days and shall be allowed five (5) dBA over ambient during the day and three (3) dBA over ambient at night. Temporary sound walls shall be required for noise abatement on temporary lift compressors. (2) Permanent lift compressors shall be enclosed within an acoustical structure composed of permanent material constructed of metal, masonry or other structurally sound material as approved by the environmental services director that significantly screens the equipment, is painted in a noncontrasting soft earth-tone color to match the nearby surroundings as nearly as possible and meets applicable building and fire codes. The structure shall be architecturally compatible with surrounds building structures and the structure's facade shall be approved by the city's chief planner. (3) Any exhaust from an internal combustion engine or compressor, stationary or mounted on wheels, must be controlled through the utilization of a "hospital" grade muffler or equivalent control device. This device must be sufficient to suppress noise and vibration and prevent the escape of noxious gases, fumes, or ignited carbon or soot. (4) The operation of permanent lift compression equipment shall not create any noise that causes the exterior noise level to exceed the predevelopment ambient noise levels as measured at the nearest protected use receiver's/receptor's property line or one hundred (100) feet from the nearest protected use structure (as measured to the closest exterior point of the building), whichever is closer to the receiver/receptor. The operator shall be responsible for establishing and reporting to the city the predevelopment ambient noise level prior to the issuance of the building permit for the compression structure. The ambient noise level shall be determined as required by subsection (d)(2) of this section. (f) Line compressors. This subsection shall apply to line compressors restricted to gas drilling pad sites. All other types of line compressors shall be required to comply with the City's Unified Development Code. Line compressors on gas drilling pad sites must be at least seven hundred (700) feet from the nearest protected use, unless a lesser distance is authorized by the city council (subsection 13-510(f)(10)), and shall have secondary containment as required by subsection 13-515(a)(33). Additional requirements for line compressors are as follows: (1) Line compressors shall be enclosed within an acoustical structure composed of permanent material constructed of metal, masonry or other structurally sound material as approved by the environmental services director that significantly screens the equipment, is painted in a noncontrasting soft earth-tone color to match the nearby surroundings as nearly as possible and meets applicable building and fire codes. The structure shall be architecturally compatible with surrounds building structures and the structure's facade shall be approved by the city's chief planner. (2) Any exhaust from an internal combustion engine or compressor, stationary or mounted on wheels, must be controlled through the utilization of a "hospital" grade muffler or equivalent control device. This device must be sufficient to suppress noise and vibration and prevent the escape of noxious gases, fumes, or ignited carbon or soot. (3) The operation of line compression equipment shall not create any noise that causes the exterior noise level to exceed the predevelopment ambient noise levels as measured at the nearest protected use receiver's/receptor's property line or one hundred (100) feet from the nearest protected use structure (as measured to the closest exterior point of the building), whichever is closer to the receiver/receptor. The operator shall be responsible for establishing and reporting to the city the predevelopment ambient noise level prior to the issuance of the building permit for the compression structure. The ambient noise level shall be determined as required by subsection (d)(2) of this section.

(Ord. No. 9154-2011, § 1, 1-18-11; Ord. No. 9649-2013, § 2, 11-19-13; Ord. No. 11675-2025, § 5, 3-18-25)

Ask a question about Grand Prairie law

Corpus searches the Grand Prairie sections it holds and shows the ones that match, with their citations. Free, no sign-in.