Sec. 13-518. - Plugged and abandoned wells.
(a) Surface requirements for plugged and abandoned well. Whenever abandonment occurs pursuant to the requirements of the commission, the operator so abandoning shall be responsible for the restoration of the well site to its original condition as nearly as practicable, in conformity with the regulations of this article. (b) Abandonment shall be approved by the inspector after restoration of the drill site has been accomplished in conformity with the following requirements at the discretion of the inspector: (1) All appurtenant equipment thereto shall be removed from drill site; (2) All tanks, towers, and other surface installations shall be removed from the drill site; (3) All concrete foundations, piping (surface and subsurface flow lines), wood, guy anchors and other foreign materials regardless of depth, shall be removed from the site, unless otherwise directed by the commission; (4) All holes and depressions shall be filled with clean, compactable soil: a. Abandoned holes, depressions and private access drives used during the operation of the gas well that are constructed on or within public or private parks, landscaped common areas within a residential subdivision, landscaped residential areas or yards, or similar type areas with a maintained ground cover surface shall also be re-sodded with equal or better quality ground covering material similar to that evident on adjoining maintained ground-covered areas. (5) Whether the gas gathering pipeline shall be abandoned in place or removed during abandonment shall be determined by the gas well operator and the gas gathering pipeline operator in accordance with commission standards and other applicable law. In addition, the city shall be consulted and assist in the determination when the gas gathering pipeline is in a city right-of-way; (6) All waste, refuse or waste material shall be removed from the pad site; (7) A permanent abandonment marker pipe, with the well identity and location permanently inscribed, shall be welded to the casing and shall be at least four (4) inches in diameter with a length of four (4) feet visible above the ground level; (8) After all equipment and waste material has been removed from the site, the operator must notify the city and schedule the final post-production inspection. The purpose of the post-production inspection is to evaluate impacts at or above the surface of the ground which may need to be addressed to ensure the health and safety the public and future occupants. All fees incurred by the city as a result of such post-production inspections shall be paid by the operator; and (9) During abandonment, operator shall comply with all applicable sections in this article. (c) Abandoned well requirement. The operator shall furnish the following to the environmental services department: (1) A copy of the W-3A "Notice of Intention to Plug and Abandon" and "W-3 Plugging Record" forms on the same date these forms are submitted to the Texas Railroad Commission; and (2) A notice of intention to abandon under the provisions of this section and stating the date such work will be commenced. Abandonment may be commenced on or subsequent to the date so stated, provided that notice has been received by the environmental services department. (d) Abandonment requirements prior to new construction. All abandoned or deserted wells or drill sites shall meet the most current abandonment requirements of the commission prior to the issuance of any building permit for development of the property. No structure shall be built over an abandoned well. (e) No structures shall be built over an abandoned well. A five-foot no-build easement around the center of the plugged and abandoned well bore shall be required and recorded in the applicable county deed records on all residential zoned lots. (f) Surface reclamation plan requirements. (1) Each operator must submit as part of the gas well abandonment, a surface reclamation plan that must include information outlined in this subsection (d), in the degree of detail necessary to demonstrate that full site reclamation can be accomplished. (2) The reclamation plan must include: a. Measures to be taken to restore property to allow use under the city comprehensive plan; b. The control of surface water drainage and of water accumulation and measures to be taken during the reclamation process to provide for the protection of the quantity and quality of surface and ground water systems; c. Remediation of impacted surface and ground water; d. Backfilling, soil stabilization, compacting, grading and appropriate re-vegetation; e. Soil reconstructions, replacement and stabilization; f. Configuration of the reshaped topography; g. Waste disposal; h. A plan for re-vegetation of affected lands; i. Road reclamation; and j. Other practices necessary to ensure all disturbed areas will be reclaimed.
(Ord. No. 9154-2011, § 1, 1-18-11; Ord. No. 10933-2020, § 3, 11-17-20)
Ask a question about Grand Prairie law
Corpus searches the Grand Prairie sections it holds and shows the ones that match, with their citations. Free, no sign-in.