§ 37.01.035: Construction schedule.

(a) The permit holder shall notify the city ROW coordinator forty-eight (48) hours before any work begins within the ROW. Contractor shall not place equipment, or traffic controls on ROW on a Friday, or the day before any city-recognized holiday. (b) Work performed pursuant to a ROW permit must commence within fourteen (14) calendar days of the date of the permit, unless the city engineer approves a later date. (c) If required by the permit, the permit holder shall submit a written construction schedule to the city engineer two (2) business days before commencing any work in or about the public ROW. The permit holder may be required to submit weekly schedules as directed by the city engineer. (d) Material and equipment may be stored at the excavation site only if they will be used within five (5) days. (e) At any time construction is stopped or a contractor is unable to continue work for more than three (3) days the contractor must make the site safe for use by the public and remove all traffic controls. The contractor shall not reoccupy the construction site with traffic controls, material, or equipment until the facility can be repaired or installed within twenty-four (24) hours of reoccupying the jobsite. (f) Backfill shall begin no later than twenty-four (24) hours after installation of facility or repair of utility. Backfill shall be completed within three (3) calendar days or covered with materials of sufficient strength and construction (H-20 load rated steel plate(s)) to permit vehicular traffic to pass over such excavation(s). Plates shall be installed and maintained in a way which will prevent the plates from bouncing and shifting. Plates must be flush with the roadway, or have the edges beveled from the top of the plate to the roadway, or be ramped to the elevation of the adjacent pavement. Temporary ramps shall be constructed of asphalt and shall have a gradual slope when necessary. (g) No adjacent parallel roadways or alleys shall be under construction simultaneously without approval by city engineer. (h) Once a project begins, work must continue on a daily basis, except for weekends, and holidays. (i) No excavation shall begin on projects deemed medium or large unless installation or repair of the facility commences within twenty-four (24) hours from the time excavation starts. (j) Permitted excavation deemed small shall be backfilled within five (5) days of excavation. (k) Concrete and asphalt (HMAC) pavement shall be restored in accordance with the latest City of Lubbock Engineering Minimum Design Standards and Specifications. Placement of pavement shall begin no later than five (5) calendar days after the completion of backfill and flow fill cap.

( Ordinance 2021-O0171 adopted 12/14/2021 )