§ 37.01.038: Excavation under supervision of city engineer.

(a) No trench shall be opened in any ROW for laying pipes, conduits, or ducts more than four hundred (400) feet in advance of the pipe, conduit, or ducts being placed in the trench, other than with the prior written approval of the city engineer. (b) A permit holder, utility, or ROW user shall perform boring operations in a manner that does not weaken or impair the ROW. (c) Streets assigned to a PCI of eighty-six (86) or above by the pavement management system are deemed to be in good condition and are subject to the same review procedures as excavation of new streets. (d) If at any point, the permit holder excavates or damages fifty (50) percent of a driving lane the permit holder shall replace the full width of the driving lane the length of the affected area. (e) If the existing pavement is PCC, the concrete shall be cut first with a saw to a minimum depth of half the thickness of the concrete, which shall also cut the reinforcing steel. The concrete can then be broken out with an air chisel or pavement breaker. No more than six (6) inches of PCC shall be broken back beneath the saw cut. (f) The permit holder, utility, or ROW user shall not enter upon private property without authorization from the property owner. The permit holders, utilities, or ROW users shall determine the boundary between public ROW and private property. (g) All transmission and distribution structures, lines, equipment and facilities erected by a permit holder, utility, or ROW user within the city shall be so located as to cause no interference with the proper use of the public ROW, and to cause no interference with the rights and reasonable convenience of any affected property owners. (h) All excavation work shall be performed during business hours of 7:00 a.m. to 5:00 p.m. Monday through Thursday, and 7:00 a.m. to 2:00 p.m. on Friday, unless written approval is granted by the city engineer, or in the case of an emergency. (i) All underground main line utilities shall be laid with the top of the pipe a minimum of two (2) feet below the surface of the ground. (j) All excavation work shall comply with Occupational Safety and Health Administration standards and requirements.

( Ordinance 2021-O0171 adopted 12/14/2021 ; Ordinance 2022-O0139 adopted 9/27/2022 )

Ask a question about Lubbock law

Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.