§ 37.01.041 — Field utility coordination
Code of Ordinances of the City of Lubbock, Texas (Lubbock Code of Ordinances, Charter and Unified Development Code current through Ordinance 2026-O0123 adopted September 22, 2026 (eCode360 publication LU6396, scraped 2026-11-17)) · Lubbock Code of Ordinances § 37.01.041
Corpus is an independent public-information project, not the official City of Lubbock website. Stable reference: corpuslaw.us/code/7b9b6246-4585-4be8-af1b-8d89a38a32e0
§ 37.01.041: Field utility coordination.
(a) The permit holder, utility, or ROW user shall notify the engineering inspector as identified on ROW permit at each of the following times during a project: (1) Twenty-four (24) hours before starting a permitted project or installing traffic control; (2) Two (2) hours before beginning the initial backfill; (3) Two (2) hours before beginning the paving of the street or alley; and (4) When the work under any permit hereunder is completed, the permit holder shall contact the city utility locater/ROW inspector for project close out inspection. (b) Prior to making a request for locates and actual excavation, the permit holder, utility, or ROW user shall mark the site of the proposed excavation with white lining and/or flags, in accordance with the one-call system. The markings shall be placed a distance of not less than five (5) feet in all directions from the outside boundary of the site to be excavated. (c) Permit holder shall only submit locate requests that can be completed in fifteen (15) days and shall not exceed one (1) linear mile. (d) Compliance with the latest Texas Utilities Code is required at all times. (e) The use of markers, stakes, poles, barricades or other devices shall be used in such a way to avoid damage to adjoining property. The use of nonpermanent or biodegradable markers is required. (f) All barricades, plates, traffic directional equipment, and all other traffic-control devices shall be clearly marked by the owner of said items with owner information as described in section 37.01.033(2) of this article. (g) If work is being performed that will block any lanes of traffic in a street or deny access to an alley or driveway and the work site will be left unattended for any length of time, the permit holder, utility, or ROW user shall place a sign at each end of the work site with the name and contact information of the permit holder, utility, or ROW user performing the work. Such signs must conform to the latest TMUTCD standards. (h) In any paved or unpaved area, all existing water, sewer, electric, and gas mains and service lines shall be physically located prior to boring by way of potholing with a hydro excavation method. Sewer lines can be exempted if elevation and alignment can be determined by existing manholes.
( Ordinance 2021-O0171 adopted 12/14/2021 ; Ordinance 2022-O0139 adopted 9/27/2022 )
Ask a question about Lubbock law
Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.