§ 37.01.042 — Backfilling and compaction
Code of Ordinances of the City of Lubbock, Texas (Lubbock Code of Ordinances, Charter and Unified Development Code current through Ordinance 2026-O0123 adopted September 22, 2026 (eCode360 publication LU6396, scraped 2026-11-17)) · Lubbock Code of Ordinances § 37.01.042
Corpus is an independent public-information project, not the official City of Lubbock website. Stable reference: corpuslaw.us/code/289bc65c-33f2-4d2e-a94d-bff8da180ff4
§ 37.01.042: Backfilling and compaction.
(a) Final backfill shall follow timelines established in this article. (b) Requirements in this section shall apply to all parts of the excavation including, but not limited to, benching and sloping done in the course of the excavation. (c) Details related to trench excavation, backfill, compaction and pavement restoration are described in the minimum design standards and specifications. (d) Paving shall be repaired in accordance with this article and the minimum design standards and specifications. (e) The back fill material shall be clean, native material free of organic and deleterious material and rocks larger than two (2) inches. Backfill and compaction shall begin no later than twenty-four (24) hours after the installation or repair of facilities. (f) Backfill in roadways shall be compacted to a relative compaction not less than 95% modified standard proctor +/-2% moisture the depth of the excavation. (g) City engineer may require third party testing for trenches greater than six (6) feet in depth in roadways to confirm backfill meets required density at no cost to the city. (h) Temporary backfill not meeting subsection (f) above will not be permitted. (i) Water jetting, sand jetting, or rock/gravel backfill will not be permitted. (j) Native material used as backfill shall be mechanically compacted by means of equipment mounted rollers, vibrating rollers, whacker packers, or other method approved by city engineer. (k) When possible all open excavations shall be backfilled and traffic controls removed prior to any extended holiday weekend. (l) Any excavation too small in size too compact by approved method shall be filled using flowfill. (m) Backfill not meeting 95% modified standard proctor, must be removed the full depth of the excavation and re-compacted to meet the compaction requirements. (n) All excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period, or at any other time where water cannot be prevented from entering the trench, will be considered temporary and shall be removed as soon as weather permits. All disturbed base material or any base that has been undermined shall be removed and discarded.
( Ordinance 2021-O0171 adopted 12/14/2021 )
Ask a question about Lubbock law
Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.