For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.05.003 — Administration

Code of Ordinances of the City of San Angelo, Texas (Codified through Ordinance No. 2025-103, enacted November 4, 2025. (Supp. No. 10)) · San Angelo Code of Ordinances § 12.05.003

Corpus is an independent public-information project, not the official City of San Angelo website. Stable reference: corpuslaw.us/code/a9e72402-8ad2-4376-a880-dad8899fb42f

Sec. 12.05.003 - Administration

(a) Duties of city officials. The city engineer, or his designated agent, is hereby appointed the floodplain administrator to administer and implement the provisions of this section and other appropriate sections of 44 CFR (National Flood Insurance Program regulations) pertaining to floodplain management. The duties of the city engineer shall include, but not be limited to: (1) Review and approve or disapprove all floodplain development permits to determine that the permit requirements of this article have been met; (2) Maintain for public inspection all records pertaining to the provisions of this article, including floodproofing certifications; (3) Notify, in riverine situations, adjacent communities and the state commission on environmental quality prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency; (4) Make interpretations, where needed, as to the exact location of the boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions); (5) Inspect sites to determine compliance with the erosion control guidelines; (6) Review permit applications to determine whether proposed building sites, including the placement of manufactured homes will be reasonably safe from flooding; (7) Review permits for proposed development to see what permits have been obtained from those federal, state, or local governmental agencies (including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C 1334) from which prior approval is required; (8) Assure that the flood-carrying capacity within the altered or relocated portion of any watercourse is maintained; (9) When base flood elevation data has not been provided in accordance with this article, the city engineer shall obtain, review and reasonably utilize any base flood elevation data and floodway data available from a federal, state, or other source, in order to administer the provisions of this article; (10) When a regulatory floodway has not been designated, the city engineer must require that no new construction, substantial improvements, or other developments (including fill) shall be permitted within zones A1-30 and AE on the community's FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community; (11) Under the provisions of 44 CFR chapter 1, section 65.12, of the National Flood Insurance Program regulations, the city engineer may approve certain development in zones A1-30, AE, and AH on the community's FIRM which increases the water surface elevation of the base flood by more than one foot, provided that an application and approval for a conditional FIRM revision is made and received from FEMA. (b) Responsibilities of property owners. (1) The owner or developer of a property to be developed shall be responsible for managing all storm drainage flowing through or abutting such property. This responsibility also includes drainage directed to that property by future development as well as the drainage naturally flowing through the property by reason of topography. The owner, builder or developer of a property shall be responsible for any concentrated flows, silt, and soils that discharge from his property. It is the intent of this article that provisions be made for managing stormwater discharges and preventing erosion and sedimentation problems. (2) Where the improvement or construction of a storm drainage facility is required along a property line common to two or more owners, the owner hereafter proposing the development of the property shall be responsible for obtaining the necessary city permits, making the improvements required by this article and the stormwater design manual at the time of development and acquiring or dedicating the necessary rights-of-way or easements to accommodate the improvements. (3) Where an applicant proposes development or use of only a portion of the property, provisions for storm drainage and erosion control shall only be required in that portion of the property proposed for immediate development, except as construction or improvements of a drainage facility or erosion controls outside that designated portion of the property are deemed essential to the development of that designated portion. (4) The owner or developer of a property must insure that all necessary local, state and federal permits have been obtained. (c) Plat review and approval process. (1) The city has several approval processes and permits in place which relate to stormwater drainage and floodplains. These processes and permits include but are not limited to: (A) Platting process. In accordance with the city's subdivision regulations, a construction plan and profile sheets for all public improvements, including drainage facilities, shall be submitted as part of the final platting process. Requirements for preliminary and final plat submission are outlined in the stormwater design manual of the city. (B) Dedication of drainage easement. Public drainage systems designed to convey the design storm runoff shall be contained within a drainage easement or a floodplain/floodway easement or property dedicated to the public, except for allowances specifically identified in this article and the stormwater design manual. (C) Floodplain development permit (areas of special flood hazard). All developers, owners or builders shall obtain a floodplain development permit before beginning any projects in floodplain areas, including but not limited to: constructing new buildings and infrastructure, filling land, altering waterways, substantially improving existing structures located in flood hazard areas or channelizing, impounding, realigning, deepening or other altering of a natural drainageway. Construction or renovation projects cannot begin until the city issues the floodplain development permit. Building permits cannot be issued before a floodplain development permit is issued. (2) Approval or denial of a floodplain development permit by the city engineer shall be based on the provisions of this article and the following relevant factors: (A) The danger to life and property due to flooding or erosion damage; (B) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; (C) The danger that materials may be swept onto other lands to the injury of others; (D) The compatibility of the proposed use with existing and anticipated development; (E) The safety of access to the property in times of flood for ordinary and emergency vehicles; (F) The cost of providing governmental services during and after flood conditions, including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical, and water systems; (G) The expected heights, velocity, duration, rate of rise and sediment transportation of the floodwaters and the effects of wave action, if applicable, expected at the site; (H) The necessity to the facility of a waterfront location, where applicable; (I) The availability of an alternative location, not subject to flooding or erosion damage, for the proposed use; (J) The relationship of the proposed use to the comprehensive plan for that area. (d) Deviations from permit terms. (1) Permits may be revoked by the city engineer if, upon periodic inspection, it is determined that the work is not progressing in accordance with specifications of the approved plan and permit or if it is determined that erosion from a building or construction site is not being controlled in a satisfactory manner. (2) Field changes to drainage system plans can be made upon the approval of the city engineer. Record drawings of the drainage system shall be submitted to the city engineer at the completion of the project. (e) Plan requirements. (1) Application materials and plan requirements for drainage systems or floodplain alterations are listed below. All engineering plans for storm drainage and floodplain alteration projects shall be sealed by a professional engineer who is licensed in the state and experienced in civil engineering work. The total cost for preparing the engineering plans and implementing the plans shall be borne by the applicant. (A) Storm drainage plans. As part of the development process, storm drainage reports and plans shall be prepared. These reports and plans shall include drainage facilities for both off-site and on-site drainage, so that the proper transition between the two can be maintained. Criteria for on-site development shall also apply to off-site improvements. The construction of all improvements shall be in accordance with the current specifications and regulations adopted by the city. Storm drainage plans shall be prepared in accordance with section 2.13 of the stormwater design manual. (B) Application materials for floodplain development permits. Owners or builders who are planning to renovate existing structures or construct new structures shall apply for a building permit in accordance with this article. If it is determined during the permit review that the proposed project is located in an area of special flood hazard, then the building permit applicant shall also be required to apply for a floodplain development permit through the city engineer and submit for review copies of the appropriate design materials. (2) For projects involving an existing structure located in areas of special flood hazard: (A) Plan and profile plans to scale, showing all existing and proposed topography, including lowest finished floor elevations (including basements) and all relevant hydrologic and hydraulic information. See section 2.13 of the stormwater design manual for preliminary and final plan submittal requirements. (B) A cost estimate of the proposed improvements or a copy of the contract amount for making the improvements, if city cost participation is requested. (C) Plans, sealed by a licensed professional engineer in the state, of any proposed flood prevention techniques and elevation in relation to mean sea level for structures. (D) A certificate from a licensed professional engineer or architect, stating that the proposed flood prevention techniques used on structures meet the requirements of this article. (3) For all subdivisions and new construction in a special flood hazard area: (A) An engineering report with the following recommended format, as applicable: (i) Project description: Description of the hydrologic and hydraulic analyses used, including the method or source used to determine historic rainfall and stream data, soils reports used to determine erosive velocity values and discharges and water surface elevations for both the 2-year and the 100-year storm event. (ii) Vicinity map. (iii) Table of values for existing and proposed water surface elevations and velocities. (iv) Documentation that the principle of equal conveyance has been achieved. Engineering calculations for existing and proposed conditions for both the 2-year and 100-year storm event discharges. (B) Engineering drawings consisting of the following recommended elements, as applicable: (i) Water surface profile, including channel flow line, existing and proposed water surface elevations and location and number designation of cross-sections. (ii) Plans as specified in section 2.13 of the stormwater design manual for preliminary and final plan submittals.

(1996 Code, sec. 12.403; Ordinance adopted 11-16-10)

Ask a question about San Angelo law

Corpus searches the San Angelo sections it holds and shows the ones that match, with their citations. Free, no sign-in.