§ 12.05.005 — Runoff calculations and limitations
Code of Ordinances of the City of San Angelo, Texas (Codified through Ordinance No. 2025-103, enacted November 4, 2025. (Supp. No. 10)) · San Angelo Code of Ordinances § 12.05.005
Corpus is an independent public-information project, not the official City of San Angelo website. Stable reference: corpuslaw.us/code/77f891d2-2d6d-4e03-bf67-16b4af066117
Sec. 12.05.005 - Runoff calculations and limitations
(a) Generally. (1) The selection of an appropriate method for calculating runoff depends upon the size of the drainage area contributing runoff at a most downstream point of a project. The rational method is acceptable for situations in which the drainage area is generally less than 200 acres. A unit hydrograph method is required for situations with larger drainage areas. These methods are described in chapters 4 and 5 the stormwater design manual. (2) Runoff calculations for property within the city limits and ETJ of the city shall be completed that assess the upstream drainage areas that flow onto or through the proposed development for fully developed watershed conditions in accordance with the city's latest land use projections. Portions of the watershed which lie outside the city limits and ETJ of the city shall be analyzed and accommodated based on existing land use conditions. (b) Downstream impact assessment. The downstream impacts of proposed development must be carefully evaluated to show that design criteria established in this article and the stormwater design manual are met. The purpose of the downstream assessment is to protect downstream properties from increased flooding, to protect downstream channels from increased erosion potential due to upstream development, and to protect public health and safety. The assessment shall extend from each outfall of a proposed development to a major stream (FEMA-defined floodplain), to a stormwater facility identified by the city as having fully developed flow capacity or to a point designated by the city engineer, whichever is the nearest point downstream. Runoff computations shall be based upon fully developed watershed conditions in accordance with the city's latest land use projections. Portions of the watershed which lie within the city limits and ETJ of the city shall be analyzed and accommodated as if fully developed. Portions of the watershed which lie outside the city's limits and ETJ shall be analyzed for existing conditions. (c) Limitation of runoff. Calculations using the following runoff limitation options shall be performed for the proposed development to demonstrate downstream adequacy in accordance with the design criteria in this article and the stormwater design manual: (1) If the necessary future capacities of the affected drainage systems within the downstream impact area are shown to adequately convey the fully developed two-year and 100-year design flows from the watershed that meet the design criteria specified in the stormwater design manual, no limitation of development runoff is required. (2) If the downstream analysis demonstrates conditions that exceed the design criteria established in this article and the stormwater design manual within the downstream impact area, the developer shall conduct one or more of the following: (A) Identify the required upsizing of any affected downstream structures and any needed drainage easement within the downstream impact area to handle the fully developed watershed conditions within the requirements of the stormwater design manual. Determine the capacity of those downstream facilities to convey: (i) Existing watershed conditions; (ii) Existing watershed conditions with the proposed development; and (iii) Fully developed watershed conditions. The city may, at its discretion, participate in construction of facilities that correct existing drainage inadequacies and/or convey the fully developed watershed conditions, other than for the proposed development, if adequate funds or other funding agreements are available. Funding options are discussed in section 12.05.010 of this article; (B) Limit discharge to existing pre-development conditions or less; (C) Acquire suitable drainage easement on the city's behalf to contain the increased runoff to meet the design criteria in this article and the stormwater design manual; or (D) Participate in a regional facility that accommodates fully developed watershed conditions as mutually agreed upon with the city. Funding options are identified in section 12.05.010 of this article. (d) Drainage improvements required for development. (1) Developments for which this article applies shall provide for any new drainage facilities, the improvement of any existing drainage facilities, channel improvements or grading, driveway adjustments, culvert improvements or any other improvement, drainage facility, or work which is necessary to provide for the stormwater drainage requirements specified in the stormwater design manual. (2) The developer is required to dedicate drainage easements across the site that will accommodate fully developed watershed conditions. The developer is only required to construct that portion of the drainage system across the site that will convey existing off-site flows and the flows from the proposed site development. Upsizing or phasing the construction of the drainage systems to accommodate fully developed watershed conditions shall be coordinated with the city. Funding for the increased sizing of these facilities shall be in accordance with section 12.05.010 (funding) of this article. (3) The developer shall construct drainage improvements that convey stormwater runoff through the proposed development to the site outfall locations in accordance with the design criteria in this article and the stormwater design manual.
(1996 Code, sec. 12.405; Ordinance adopted 11-16-10)
Ask a question about San Angelo law
Corpus searches the San Angelo sections it holds and shows the ones that match, with their citations. Free, no sign-in.