Sec. 12.05.006 - Design of local drainage systems
(a) Design storm frequencies. The calculations of runoff quantities that must be accommodated in drainage facilities, as well as the design flood levels for various drainage structures, are located in subsection (e) of this section and in the stormwater design manual. (b) Storm drain design standards. Stormwater design standards are found in the stormwater design manual. This includes but is not limited to channel, street and alley capacity; placement of inlets and manholes; and standard methods and formulas for calculation of flow and depth. (c) Lot-to-lot drainage. Existing drainage between developed lots are the responsibility of the affected property owners. Future developments are required to drain surface runoff in accordance with the building code adopted by the city from no more than one residential lot across one other residential lot and then drain into public right-of-way, easement, or drainage system. (d) Drainage easements. All stormwater conveyance systems (streets, storm drains, ditches, swales, detention basins, channels, etc.) to be dedicated to and accepted by the city shall be located in the right-of-way or in a drainage easement dedicated to and accepted by the city at the time of final recording of a plat. (e) Design criteria. (1) The storm frequencies for fully developed watershed conditions shown in the following tables shall be used in storm drainage designs in the city. All drainage features, except for levees and streets as shown, shall be designed to keep the two-year and 100-year floods within the prescribed drainage easements or ROW (right-of-way). Facility | Minor Storm (2-Year) | Major Storm (100-Year) Street(s) and alleys | Maximum water depth of six inches above gutter flowline or edge of pavement, within ROW | Maximum water depth of eight inches above gutter flowline or edge of pavement, contained within ROW and easement. Alternative A: Building FFE must be 18 inches above highest adjacent gutterline to the property. Maximum water depth of 12 inches above gutter flowline or edge of pavement. Alternative B: Sealed engineering plan showing adequate conveyance of drainage in ROW and/or easements. Minimum of six inches of FFE freeboard for structures. Maximum water depth of 12 inches above gutter flowline or edge of pavement. Enclosed pipe system | Conveyance in the pipe with maximum HGL of six inches above gutter flowline | Maximum overflow of 12 inches above gutter flowline. Channels and creek improvements | Maintain non-erosive conditions | Water surface elevation within easement with one foot freeboard. Culverts | U.S. headwater no more than top of pavement or curb at the low point of the crossing | Water surface elevation within easement and no more than 12 inches above the gutter flowline at the low point. Bridges | U.S. headwater at least one foot below low chord elevation | U.S. headwater below low chord elevation. Detention pond and sump areas | Low flow outlet structure | Water surface elevation within easement with one foot freeboard. Levees: Protecting 1—5 homes | Maintain non-erosive conditions | Water surface elevation within easement with one foot freeboard. Protecting 5—20 homes | Maintain non-erosive conditions | Water surface elevation within easement with three feet freeboard. Protecting >20 homes | Maintain non-erosive conditions | Standard project flood within easement. (2) Velocity limitations are listed in the table below: Facility | Maximum Velocity of Design Discharge Storm drains: Inlet laterals (shorter than 30 feet) | No limit Inlet laterals (longer than 30 feet) | 20 fps Trunk lines | 20 fps Last 20 [feet] diameter of length upstream of an outfall | six fps or 120 percent of receiving stream*, whichever is greater Open channels: Grass lined earthen | six fps Rock (native) | ten fps Gabion lined | 12.0 fps Reinforced concrete lining | 20.0 fps Rock riprap (placed rock) | Use U.S. Army Corps of Engineers guidelines Prefabricated lining products | Use 90 percent of manufacturer's recommended velocity limits Surface drainage: Streets and alleys | 12 fps at a six-inch depth within the street
(1996 Code, sec. 12.406; Ordinance adopted 11-16-10)
Ask a question about San Angelo law
Corpus searches the San Angelo sections it holds and shows the ones that match, with their citations. Free, no sign-in.