§ 12.05.008 — Floodplain guidelines

Code of Ordinances of the City of San Angelo, Texas (Codified through Ordinance No. 2025-103, enacted November 4, 2025. (Supp. No. 10)) · San Angelo Code of Ordinances § 12.05.008

Corpus is an independent public-information project, not the official City of San Angelo website. Stable reference: corpuslaw.us/code/598d42b8-fbf5-4ec1-8a40-f7ed55325d60

Sec. 12.05.008 - Floodplain guidelines

(a) General standards. In all areas of special flood hazards, the following provisions are required for all new construction and substantial improvements: (1) All new construction or substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy; (2) All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damage; (3) All new construction or substantial improvements shall be constructed with materials resistant to flood damage; (4) All new construction or substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; (5) All new construction or substantial improvements shall be constructed with materials resistant to flood damage; (6) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharge from the systems into the floodwaters; and (7) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (b) Specific standards. In all areas of special flood hazards, where base flood elevation data has been provided, the following provisions are required: (1) Residential construction. New construction and substantial improvement of any residential structure shall have the lowest floor (including basement) elevated to a minimum of two feet above the base flood elevation, one foot above the fully developed 100-year flood elevation, or one foot above the 500-year flood elevation, whichever is more restrictive. A registered professional engineer, architect, or land surveyor shall submit a certification to the floodplain administrator that the standard of this subsection is satisfied. (2) Nonresidential construction. New construction and substantial improvements of any commercial, industrial, or other nonresidential structure shall either have the lowest floor (including basement) elevated to at a minimum of two feet above the base flood elevation, one foot above the fully developed 100-year flood elevation, one foot above the 500-year flood elevation, whichever is more restrictive, or, together with attendant utility and sanitary facilities, be designed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy. A registered professional engineer or architect shall develop and/or review structural design, specifications, and plans for the construction, and shall certify that the design and methods of construction are in accordance with accepted standards of practice as outlined in this subsection. A record of such certification which includes the specific elevation (in relation to mean sea level) to which such structures are floodproofed shall be maintained by the floodplain administrator. (3) Enclosures. New construction and substantial improvements with fully enclosed areas below the lowest floor that are usable solely for parking of vehicles, building access or storage in an area other than a basement and which are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a licensed professional engineer or architect or meet or exceed the following minimum criteria: (A) A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. (B) The bottom of all openings shall be not higher than one foot above grade. (C) Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters. (4) Manufactured homes. (A) All manufactured homes to be placed within zone A shall be installed using methods and practices which minimize flood damage. For the purpose of this requirement, manufactured homes must be elevated and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable state and local anchoring requirements for resisting wind forces. (B) Manufactured homes that are placed or substantially improved within zones A1-30, AH, and AE on the community's FIRM on sites that must be: (i) Outside of a manufactured home park or subdivision; (ii) In a new manufactured home park or subdivision; (iii) In an expansion to an existing manufactured home park or subdivision; or (iv) In an existing manufactured home park or subdivision on which a manufactured home has incurred "substantial damage" as a result of a flood; [must] be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated to one foot above the base flood elevation and be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. (C) Require that manufactured homes to be placed or substantially improved on sites in an existing manufactured home park or subdivision within zones A1-30, AH and AE on the community's FIRM that are not subject to provisions in this article be elevated so that either: (i) The lowest floor of the manufactured home is at or above the base flood elevation; or (ii) The manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than 36 inches in height above grade and be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. (5) Recreational vehicles. Require that recreational vehicles placed on sites within zones A1-30, AH, and AE on the community's FIRM either: (A) Be on the site for fewer than 180 consecutive days; (B) Be full licensed and ready for highway use; or (C) Meet the permit requirements of this article and the elevation and anchoring requirements for manufactured homes. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick-disconnect type utilities and security devices, and has no permanently attached additions. (c) Standards for subdivision proposals. (1) All proposals for the development of subdivisions, including manufactured home parks and subdivisions, shall meet floodplain development permit requirements of this article. (2) Base flood elevation data shall be generated for subdivision proposals and other proposed development, including manufactured home parks and subdivisions, which is greater than 50 lots or five acres, whichever is lesser, if not otherwise provided pursuant to this article. (3) All subdivision proposals, including manufactured home parks and subdivisions, shall have adequate drainage provided to reduce exposure to flood hazards. (4) All subdivision proposals, including manufactured home parks and subdivisions, shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize or eliminate flood damage. (d) Standards for areas of shallow flooding (AO/AH zones). Located within the areas of special flood hazard are areas designated as shallow flooding. These areas have special flood hazard associated with base flood depths of 1 to 3 feet where a clearly defined channel does not exist and where the path of flooding is unpredictable and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. The following provisions apply: (1) All new construction and substantial improvements of residential structures shall have the lowest floor (including basement) elevated above the highest adjacent grade at least as high as the depth number specified in feet on the community's FIRM (at least two feet if no depth number is specified). (2) All new construction and substantial improvements of nonresidential structures shall: (A) Have the lowest floor (including basement) elevated above the highest adjacent grade at least as high as the depth number specified in feet on the community's FIRM (at least two feet if no depth number is specified); or (B) Together with attendant utility and sanitary facilities be designed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads of effects of buoyancy. (3) A registered professional engineer or architect shall submit a certification to the floodplain administrator that the standards of this section are satisfied. (4) Within zone AH or AO, adequate drainage paths around structures on slopes, to guide floodwaters around and away from proposed structures, are required. (e) Floodways. Located within areas of special flood hazard are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of floodwaters, which carry debris, potential projectiles and erosion potential, the following provisions shall apply: (1) Encroachments are prohibited, including fill, new construction, substantial improvements and other development, within the adopted regulatory floodway, unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice by a licensed professional engineer or architect that the proposed encroachment would not result in any increase in flood levels within the community during the occurrence of the base flood discharge. (2) All new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of this article. (3) Under the provisions of 44 CFR chapter 1, section 65.12, of the National Flood Insurance Regulations, encroachments within the adopted regulatory floodway that would result in an increase in base flood elevations may be permitted, provided that an application and approval for a conditional FIRM and floodway revision to FEMA is made and received. (f) Verification of floodplain alterations. (1) Certified minimum proposed finished floor elevations. Prior to final acceptance by the city of utilities, streets or other public construction for projects involving floodplain alterations or adjacent to defined floodplains, creeks, channels and drainageways, a certified statement shall be prepared by a registered public surveyor or licensed professional engineer, showing that all lot elevations, as developed within the subject project, meet or exceed the required minimum finished floor elevations shown on the floodplain development permit. This certification shall be filed with the city engineer. (2) Certified elevations of constructed finished floor. In addition, at any time in the future when a building permit is desired for existing platted property which is subject to flooding or carries a specified or recorded minimum finished flood elevation, a registered public surveyor or a licensed professional engineer shall prepare a certified statement that sites are built to the design elevations. The certified survey data showing the property to be at or above the specified elevation shall be furnished to the city engineer for approval. A certificate of compliance with the provisions of this article, pertaining to specified finished floor elevations, shall be required. (3) Issuance of building permits. The applicants shall furnish, at their expense, to the city engineer the above certifications and any other certified engineering and surveying information requested by the city engineer to confirm that the required minimum floor and pad elevations have been achieved. Building permits will not be issued until: (A) A letter of map revision or amendment has been issued by FEMA; and/or (B) Lots and/or sites are certified by a registered public surveyor or a licensed professional engineer that they are elevated from the floodplain according to FEMA-approved revisions to the floodplain and the requirements of this article.

(1996 Code, sec. 12.408; Ordinance adopted 11-16-10)