§ 23-18 — Construction permits
Code of Ordinances of the City of Waco, Texas (Supp. No. 88: codified through Ordinance No. 2026-250, enacted April 21, 2026) · Waco City Code § 23-18
Corpus is an independent public-information project, not the official City of Waco website. Stable reference: corpuslaw.us/code/220d8cc6-353e-496b-b9fa-5fb743e37035
Sec. 23-18. - Construction permits.
(a) No person shall perform any construction of facilities in the right-of-way without first obtaining a construction permit except as otherwise provided by this chapter. The permit shall be in the name of the person who owns or will subsequently own the facilities to be constructed. The permit application shall be completed and signed by the person as permittee. (b) A permit under this section shall not be required when providing primary service as defined by this chapter unless providing such primary service requires construction of a length of more than two feet within the right-of-way. (c) Construction considered an emergency, as that term is defined by this chapter, relating to existing facilities may be undertaken without first obtaining a permit from the city. However, a user shall notify the city engineer's office as promptly as possible after beginning the emergency construction, but in any event in writing no later than the next city-business day, of any emergency construction, and shall also provide within two business days a reasonably detailed description of the construction performed in the right-of-way, and shall further provide within 90 days from the date any facilities are reconstructed or relocated and an updated map of any facilities that were affected by such emergency construction, but if the facilities are merely repaired in place, no updated map shall be required. In the event of inclement weather or natural disaster, only one general notification will be required. (d) A general permit as defined herein may be issued by the city engineer, but a permittee shall otherwise comply with subsection (e) of this section in the issuance of a general permit. (e) An applicant for a permit shall provide the city engineer the following information prior to the permit being issued, and such information shall be incorporated by reference into the permit: (1) To whom the permit is issued; (2) A description of the location of construction and facilities; (3) A description of the route of all facilities to be constructed on or about the designated right-of-way; (4) Location of all right-of-way easements which the permittee plans to use; (5) Location of existing city and third-party facilities as required by section 23-22; (6) Description of plans, which may be submitted as a form statement, to restore existing facilities pursuant to this chapter, and other right-of-way construction, and such plans shall comply with the most recently adopted guiding documents; (7) Drawings of any bores, trenches, hand holes, manholes, switch gear, transformers, pedestals, poles, and the such-like, including any applicable depths and heights; (8) Typicals of manholes and hand holes that the permittee plans to use or access; (9) The construction methods and materials to be employed by the permittee for the protection of existing facilities within, above, beneath, or adjacent to the right-of-way, all of which methods and materials are subject to approval by the city engineer; (10) Estimated dates and times that construction is scheduled to be performed; (11) The base material to be used pursuant to section 23-20 of this chapter; (12) Restoration of property pursuant to section 23-32 of this chapter; (13) Three sets of construction plans which shall be on a scale not to exceed one inch equaling 100 feet unless otherwise approved by the city engineer, and the plans shall include the dimensions from the proposed facility to permanent reference points; (14) Detailed description of what the permittee proposes to construct, including but not limited to, if applicable, pipe sizes, the number of interducts, and valves; (15) A complete legend of drawings submitted by the permittee, which may be provided by reference to previously submitted documents, but if symbols are used, the permittee shall provide the city with an accurate guide to the meaning of any symbols used; (16) A written statement that proof of insurance, bond, or other financial information required under this chapter is current and on file with the city; and, (17) A traffic control plan acceptable to the city engineer. (f) In addition to the information required in (e) above, an applicant for a permit to install and construct network nodes or new node support poles in the right-of-way shall provide to the city engineer the following: (1) Information reasonably related to the provider's use of the right-of-way under this chapter to ensure compliance with this chapter; (2) A certificate that the network node complies with applicable regulations of the Federal Communications Commission; (3) Certification that the proposed network node will be placed into active commercial service by or for a network provider not later than the 60th day after the date the construction and final testing of the network node is completed; and (4) Any information required by the city engineer that directly relates to the requirements of the most recently adopted guiding documents. (g) Submittal of application and review process. (1) Except as provided in (h) below: a. An application for a construction permit shall be submitted to the city engineer at least 15 city-business days before the commencement of the proposed construction unless: 1. The construction is for primary service and state law or federal law requires construction time be less than 15 city-business days; or 2. The city engineer agrees to a request by the user for a modified submission date. b. Applications for construction permits shall be promptly processed and approved or disapproved by the city engineer but in any event no later than ten city-business days after receiving all the permit information required under this chapter, except that, if subsection 23-18(g)(1)a.1. shall apply, a construction permit shall be processed as soon as reasonably practical. (h) Review process for a permit for a network node, network pole, or transport facility. (1) The city shall process each permit application on a nondiscriminatory basis. (2) Not later than the 30th day after the date the city engineer receives an application for a permit for a network node or node support pole, or the 10th day after the date the city engineer receives an application for a permit for a transport facility, the city engineer shall determine whether the application is complete and notify the applicant of that determination. If the city engineer determines that the application is not complete, the city engineer shall specifically identify the missing information. (3) The city engineer shall approve an application that does not require zoning or land use approval as provided in Chapter 284 of the Texas Local Government Code unless the application or the corresponding work to be performed under the permit does not comply with the city's applicable codes or other municipal rules, regulations, or other law that is consistent with Chapter 284 of the Texas Local Government Code (4) The city engineer must approve or deny an application for a node support pole not later than the 150th day after the date the city engineer receives the complete application. The city engineer must approve or deny an application for a network node not later than the 60th day after the date the city engineer receives the complete application. The city engineer must approve or deny an application for a transport facility not later than the 21st day after the date the city engineer receives a complete application. An application for a permit for a node support pole, network node, or transport facility shall be deemed approved if the application is not approved or denied on or before the applicable date for approval or denial prescribed by this subsection. (5) If the city engineer denies a complete application, the city engineer must document the basis for the denial, including the specific applicable code provisions or other city rules, regulations, or other law on which the denial was based. The city engineer shall send the documentation by electronic mail to the applicant on or before the date the city engineer denies the application. (6) Not later than the 30th day after the date the city engineer denies the application, the applicant may cure the deficiencies identified in the denial documentation and resubmit the application without paying an additional application fee, other than a fee for actual costs incurred by the city engineer. Notwithstanding subsection (4), the city engineer shall approve or deny the revised completed application after a denial not later than the 90th day after the date the city engineer receives the completed revised application. The city engineer's review of the revised application is limited to the deficiencies cited in the denial documentation. (i) Time of installation required for network provider. (1) A network provider shall begin the installation for which a permit is granted not later than six months after final approval and shall diligently pursue the installation to completion. (2) Notwithstanding subsection (1) above, the city may place a longer time limit on completion or grant reasonable extensions of time as requested by the network provider. (j) All construction in the right-of-way shall be in accordance with the construction permit for the facilities. The city engineer shall be provided access to the right-of-way construction and to such further information as the city engineer may reasonably require in order to ensure compliance with the permit or this chapter. (k) A copy of the construction permit and approved engineering plans shall be maintained at the construction site and made available for inspection by the city engineer at all times when construction is occurring. (l) All construction authorized by permit shall be completed in the time specified in the construction permit. If the construction cannot be completed in the specified time period, a user may request an extension of time from the city engineer, who shall not unreasonably deny such extension. A user may continue work that has been approved by the permit during the time the request for an extension is pending, so long as the request is made prior to the expiration of the permit. (m) A copy of any permit or approval issued by federal or state authorities for work in federal or state right-of-way located in the city shall be provided by the user to the city engineer upon request. (n) The city engineer may request a pre-construction meeting with the permittee or the user.
(Ord. No. 2001-41, § 1, 10-2-01; Ord. No. 2013-069, § 1, 2-5-13; Ord. No. 2017-715, § 1, 8-15-17; Ord. No. 2025-477, § 9, 6-17-25)
Ask a question about Waco law
Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.