Sec. 23-27. - Backfill.
(a) Backfill shall be constructed pursuant to the most recently adopted guiding documents. A user shall notify the city engineer at least two hours prior to beginning backfill operations. Failure to so notify may result in suspension of construction and removal of any unauthorized installed backfill. (b) Densities may be taken to ensure compliance with standard backfill requirements. At least five days prior to the commencement of the backfill operations, a user shall submit to the city engineer a sample of the backfill material to be used by the user at the construction site. (c) In excavations 18 inches or less in width, or where for any reason compaction cannot be achieved with gravel backfill, flowable concrete shall be used in place of gravel backfill. Flowable fill shall conform to the most recently adopted guiding documents.
(Ord. No. 2001-41, § 1, 10-2-01; Ord. No. 2013-069, § 1, 2-5-13; Ord. No. 2025-477, § 9, 6-17-25)
Ask a question about Waco law
Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.