Sec. 23-22. - Same—Location and placement.
(a) Prior to commencing excavation or boring, unless otherwise excepted by this chapter, a user shall verify the horizontal and vertical location of existing city and third-party facilities within three feet of the user's proposed construction. Prior to commencing excavation or boring, unless otherwise excepted by this chapter, a user shall verify only the horizontal location for facilities outside three feet of the user's proposed construction and which may be reasonably anticipated to be disturbed by the user's proposed construction. (b) Any facility constructed by a user shall maintain a minimum of six inches vertical separation when crossing any existing facility or as per the most recently adopted guiding documents. (c) Facilities constructed by the user shall be constructed at a minimum depth of 24 inches or as per the most recently adopted guiding documents, except the city engineer may require a lesser or greater depth if it is deemed necessary for the health, safety, or general welfare of the public. (d) All bores shall be a minimum of 24 inches below the street gutter or edge of pavement or as per the most recently adopted guiding documents. (e) All directional boring shall have a locator place bore marks and depths while the bore is in operation. Locator shall place a mark at each stem with a paint dot and shall mark the depth at least at every other stem. (f) Placement of all appurtenances shall be approved by the city engineer prior to placement. (g) All utilities, including electrical distribution facilities and communication, shall be installed underground along residential streets, unless otherwise approved by the city engineer. Temporary electrical service may be installed above ground adjacent to unplatted property along residential streets. However, these lines must be placed underground as adjacent property develops. Electrical and/or communication utility lines shall be installed underground in compliance with utility service regulations. Electrical utility service to non-residential properties from overhead distribution lines shall be place underground from the right-of-way to the point of service. Developers are encouraged to install all utilities underground on each property. Existing overhead facilities which follow existing routes, rights-of-way, and/or easements may remain and may be repaired, replaced, upgraded, or relocated along the same general route, while new overhead distribution feeders and major circuits may be constructed or extended. (h) If any facility is installed in a location that is not in accordance with the plans approved by the city engineer, the user shall remove the facility within ten days. If any facility is installed in a location that is not in accordance with the plans approved by the city engineer and impedes pedestrian or vehicular traffic or does not comply or otherwise renders the right-of-way non-compliant with applicable laws, including the Americans with Disabilities Act, then user shall remove the facility within three days.
(Ord. No. 2001-41, § 1, 10-2-01; Ord. No. 2017-715, § 1, 8-15-17; Ord. No. 2025-477, § 9, 6-17-25)
Ask a question about Waco law
Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.