§ 31-611 — STORMWATER RUNOFF
Code of Ordinances of the City of Suffolk, Virginia (Codified through Ordinance No. 26-O-074, enacted June 17, 2026 (Supp. No. 55)) · Suffolk Unified Development Ordinance § 31-611
Corpus is an independent public-information project, not the official City of Suffolk website. Stable reference: corpuslaw.us/code/37634d47-340a-452a-b460-e77288299a2a
SEC. 31-611. - STORMWATER RUNOFF.
(a) PURPOSE. This Section is adopted for the purpose of: (1) Ensuring that new subdivisions, site plans and other developments have adequate capacity to accommodate the design storm; and (2) Providing standards for the Adequacy of Public Facilities Standards relating to stormwater management. Section 31-601 of this Ordinance; and (3) Ensuring that stormwater management systems have sufficient pollutant removal capacities; and (4) Providing uniform criteria consistent with regional approaches to stormwater management, as set forth in the Virginia Stormwater Management Handbook, prepared by the Virginia Department of Conservation and Recreation or its successors; the Virginia Stormwater Management BMP Clearinghouse; the City of Suffolk Public Facilities Manual [hereinafter the "PFM"]; and Chapter 35 of the City Code of Suffolk; and (5) Providing criteria consistent with approaches utilized throughout the Hampton Roads region in order to ensure predictability and fairness in the application of stormwater management standards; and (6) Emphasizing the preservation of existing vegetation as an alternative to structural approaches to stormwater management in order to promote efficiency, reduce development costs, and to enhance water quality; and (7) Encouraging stormwater management practices which take into consideration local conditions such as high water tables and unsuitable soils, which limit the effectiveness of infiltration devices and require the more extensive uses of vegetative preservation and vegetative management; and (8) Ensuring that best management practices ("BMPs") are suitable for the development site, and that adequate measures are incorporated for the long-term maintenance for BMPs or vegetative practices; and (9) Implementing the mandatory provisions of Code of Virginia, § 15.2-2241.3. [image omitted; see the official code] (b) GENERALLY. (1) The design and operation of all stormwater management facilities shall comply with the Virginia Stormwater Management Handbook, the Virginia Stormwater Management BMP Clearinghouse, the PFM, Chapter 35 of the Code of the City of Suffolk as well as with all applicable provisions of the Virginia Stormwater Management Regulations which apply to land development or land development practices, 4 VAC 50-60-10 to 4 VAC 50-60-1240, or its successor provision, as the same may be amended or renumbered from time to time are hereby incorporated by reference and made a part of this Ordinance. A. The Director is hereby designated the plan-approving authority for stormwater management plans. The Director shall refer all stormwater management plans to the Department of Public Works for review and recommendation. B. Stormwater management plans for land development shall be submitted and approved prior to any application for a final plat or final site plan is submitted. If no final subdivision plat or final site plat is required, the stormwater management plan shall be submitted with an application for development approval. The Director shall review and approve the stormwater management plan in accordance with 4 VAC 50-60-108, or its successor provision, as the same may be amended or renumbered from time to time. No final plat or final site plan shall be accepted unless accompanied by an approved stormwater management plan. No other application for development approval shall be approved unless and until the stormwater management plan is approved. Any request for an exception pursuant to 4 VAC 50-60-122 or its successor provision, as the same may be amended or renumbered from time to time, shall be submitted to and processed by the Director. (2) The design and operation of all stormwater management facilities shall comply with all provisions of Chapter 35 of the City Code of Suffolk, the PFM, and the Virginia Stormwater Management Handbook, and the Virginia Stormwater Management BMP Clearinghouse, which apply to land development or land development practices, which documents are hereby incorporated by reference and made a part of this Ordinance. (c) STORMWATER FACILITY DESIGN. For purposes of Section 31-601 of this Ordinance, the following standards shall apply: (1) The design and operation of all stormwater management facilities shall comply with the Virginia Stormwater Management Handbook, the PFM, and Chapter 35 of the Code of the City of Suffolk. (2) Maintenance. Maintenance of all stormwater management facilities shall be as set forth in 4 VAC 50-60-112, or its successor provision, as the same may be amended or renumbered from time to time and as specified in the applicable BMP Maintenance Agreement. The schedule of inspections shall be as referenced in the PFM and Chapter 35 of the City Code of Suffolk. (d) OBSTRUCTION OF DRAINAGE CHANNELS PROHIBITED. No fences or structures shall be constructed across an open drainage channel that will reduce or restrict the flow of water. The Director may require any water course or stormwater management facility to be located within a dedicated drainage easement that provides sufficient width for maintenance. (1) BORROW PITS. No planned BMP shall be used as a commercial Borrow Pit unless and until a conditional use permit has been obtained pursuant to Article IX of Chapter 34 of the City Code; provided, however, that if a BMP is designated as part of a preliminary plat and engineering plans, including those for the BMP, have been approved, no additional conditional use permit shall be required. (e) PRO RATA POLICY. (1) APPLICABILITY. A. A developer or subdivider of land shall share the cost of providing reasonable and necessary drainage facilities, located outside the property limits of the land owned or controlled by the developer or subdivider but necessitated or required, at least in part, by the construction or improvement of the subdivision or development. All residential development and redevelopment projects classified as a major subdivision in accordance with Section 31-506 of the Unified Development Ordinance, and all commercial development and redevelopment projects are required to provide payment of the pro rata share assessment prior to subdivision, site plan, plat recordation or development plan approval. B. The City has established a Stormwater Master Plan which divides the City into major watersheds as designated by the City of Suffolk Department of Public Works. The Stormwater Master Plan defines the ultimate drainage outfall or receiving water body and identifies Stormwater Capital Improvement Projects necessary for ultimate development in accordance with the adopted Comprehensive Plan or current zoning approved by City Council. C. Each pro rata payment received shall be expended only for necessary engineering and related studies and the construction of those facilities identified in the established Stormwater Capital Improvement Program; however, in lieu of such payment the governing body may provide for the posting of a personal, corporate or property bond, cash escrow or other method of performance guarantee satisfactory to it conditioned on payment at commencement of such studies or construction. The payments received shall be kept in a separate account for each of the individual major watershed programs until such time as they are expended for the improvement program. All bonds, payments, cash escrows or other performance guarantees hereunder shall be released and used, with any interest earned, as a tax credit on the real estate taxes on the property if construction of the facilities identified in the established drainage program is not commenced within twelve years from the date of the posting of the bond, payment, cash escrow or other performance guarantee. D. Payment of a pro rata share does not relieve the developer from implementing stormwater improvements to meet water quality and quantity requirements in accordance with the adopted Stormwater Ordinance. E. Pro rata share reduction will not be allowed for normal on-site BMP requirements. Normal on-site BMP requirements constitute those activities as defined in the adopted Stormwater Ordinance or its associated references and the Unified Development Ordinance. F. Full waiver of the pro rata share assessments shall be provided to projects owned by the City of Suffolk. G. Any violation of any provisions of this ordinance may be restrained by injunction without the necessity of showing that an adequate remedy at law does not exist. (2) PRO RATA SHARE CALCULATION. With the established Stormwater Capital Improvement Program, a pro rata share of the total cost of the programmed improvements shall be determined as follows: A. The Department of Public Works or its assign shall determine the estimated increase in volume and velocity of stormwater runoff, expressed as an increase in impervious area, for each watershed when fully developed in accordance with the adopted Comprehensive Plan or changes in zoning approved by the City Council, whichever produces the greatest impervious area. B. The total cost of the Stormwater Capital Improvement Program projects for each respective watershed divided by the increase in impervious area for that watershed shall be computed by the Department of Public Works or its assign to determine the pro rata share rate for that watershed. C. The developer or subdivider of land shall determine the increase in impervious area for their proposed development. If the development is located within more than one major watershed, then the developer or subdivider of land shall determine the increase in impervious area for each portion of the development that is located within each watershed. A proposed development or redevelopment site should be divided into drainage areas conforming to the major watershed boundaries established by the City. The total site area within each major watershed must be included in the computation whether it is controlled by a storm drain, detention/retention facility, best management practice, or sheet flow design. D. The developer or subdivider of land shall provide the computations showing the increase in impervious area for the proposed development to the Department of Public Works as part of subdivision plan, site plan, and development plan submittal requirements. The Department of Public Works will compute the developer's pro rata share assessment by multiplying the respective watershed pro rata share rate by the development's increase in impervious area.
(Ord. No. 09-O-055, Exh. A, 11-18-2009; Ord. No. 13-O-057, 6-19-2013; Ord. No. 14-O-072, 6-18-2014)
Ask a question about Suffolk law
Corpus searches the Suffolk sections it holds and shows the ones that match, with their citations. Free, no sign-in.