§ 31-613 — UTILITIES AND EASEMENTS

Code of Ordinances of the City of Suffolk, Virginia (Codified through Ordinance No. 26-O-074, enacted June 17, 2026 (Supp. No. 55)) · Suffolk Unified Development Ordinance § 31-613

Corpus is an independent public-information project, not the official City of Suffolk website. Stable reference: corpuslaw.us/code/e4a054fa-1104-4ff5-bf00-bca185ddac80

SEC. 31-613. - UTILITIES AND EASEMENTS.

(a) PURPOSE. This Section implements the mandatory requirements of Section 15.2-2241.6 and other requirements of the Code of Virginia and the City Code relating to the provision of necessary utilities. (b) WATER SYSTEM. All subdivisions and developments requiring site plan approval shall comply with Chapter 90 of the Suffolk City Code, as amended. (c) SEWER SYSTEM. All subdivisions and developments requiring site plan approval shall comply with Chapter 90 of the Suffolk City Code, as amended. (d) CABLE, GAS AND ELECTRIC FACILITIES. The applicant shall convey, in appropriate cases, common or shared easements to franchised cable television operators furnishing cable television and public service corporations furnishing cable television, gas, telephone and electric service to the proposed subdivision. Such easements, the location of which shall be adequate for use by public service corporations and franchised cable television operators which may be expected to occupy them, may be conveyed by reference on the final plat to a declaration of the terms and conditions of such common easements and recorded in the land records of the City. (e) INSPECTION. Except as otherwise provided by Section 31-717(d)(5) for model homes, no zoning or building permits shall be issued for the construction of any structure until water and sewer system improvements have been installed, inspected and approved by the City. (f) INSTALLATION. This Section shall not apply to minor subdivisions. (1) All utilities including, but not limited to, wires, cables, pipes, conduits and appurtenant equipment for electric, telephone, gas, cable television or similar services shall be placed underground except, however, the following shall be permitted above ground: A. Electric transmission lines and facilities in excess of fifty (50) kilovolts. B. Equipment, including electric distribution transformers, switch gear, meter pedestals, telephone pedestals, streetlighting poles or standards, radio antennae, traffic control devices, and associated equipment which is, in conformance with accepted utility practices, normally installed above ground. C. Meters, service connections and similar equipment normally attached to the outside wall of a customer's premises. D. Temporary above ground facilities required in conjunction with an authorized construction project. (2) Existing utilities located above ground in proposed subdivisions may be maintained, repaired or upgraded to maintain current levels of service. (3) Whenever any existing above ground utilities internal to a major subdivision require relocation for any reason they shall be placed underground. (g) PRIVATE SEWAGE DISPOSAL. (1) Where permitted by this Ordinance, private sewage disposal systems, normally including an individual septic tank, drainfield and reserve drainfield for each lot, shall be approved by the local health official. Such approval shall include the satisfactory evaluation of such lot in accordance with applicable state health department requirements. (2) A major subdivision plat or a Subsection of a major subdivision plat submitted for review shall show the location of the proposed on-site sewage systems or, in the alternative, shall be accompanied by a letter from the Health Department stating that soils on the site are acceptable for the development of an on-site sewage system. All studies and soil profiles submitted must be in accordance with the Commonwealth of Virginia sewage handling and disposal regulations. (3) Where private sewage disposal systems are permitted, the affected subdivision plat shall be provided with the following notation: A. Where septic tanks are to be installed, there must be an approval on an individual lot basis by the local health department at the time an application is made for a septic tank permit. Approval of this plat by the City of Suffolk does not assure that the individual parcels are suitable for septic tank systems. (h) EASEMENTS. (1) Easements for installation and maintenance shall be provided across lots or overlapping or adjoining rear or side lot lines. The width of such easements shall be a minimum of twenty (20) feet. (2) All drainage easements referenced on any minor or major subdivision plat shall be dedicated to the City or the Virginia Department of Transportation for acceptance of maintenance responsibilities. Appropriate notation or reference of such dedication must be provided on the plat. (3) There shall be a minimum five-foot (5′) easement provided along the rear and side property lines at all lots for the installation and maintenance of utilities. (i) POWER LINE EASEMENTS. No land area which is encumbered by any covenant, easement or interest which would permit the establishment of power distribution facilities, including high power transmission lines, ground transformer stations and natural gas, petroleum or other transmission pipelines, but not ordinary transmission lines located in the public right-of-way or easements which total less than twenty-five (25) feet in width, shall be considered in the computation of minimum lot area or minimum district size. (j) LIMITATIONS IN MAJOR UNDERGROUND UTILITY EASEMENTS. (1) No land area which is encumbered by any major underground utility easement and which is located outside of a public right-of-way shall be obstructed, restricted or impeded in any manner by any new structure, building, plantings, stockpiling of material or use except for the following when approved by the Director. Such approval may include the imposition by the Director of conditions necessary to maintain the structural integrity of the transmission pipeline. A. Transmission pipelines and appurtenant structures and facilities, to include temporary structures used in conjunction with the maintenance and/or repair of the underground utility lines. B. Aboveground utility crossings and underground crossings of franchised cable television lines and crossings of underground utilities including, but not limited to, storm drains, water and sanitary sewer lines, liquid petroleum lines, gas lines, electric and telephone cables. C. Erosion and sediment controls. (i) Temporary equipment crossings provided transmission pipelines are adequately protected from any adverse impacts caused by such crossing. (ii) Crossings of railroad tracks, private streets, driveways, trails, sidewalks and public rights-of-way provided such facilities will not adversely impact the structural integrity of transmission pipelines. (iii) Trails as shown on the adopted Comprehensive Plan provided such trails will not adversely impact the structural integrity of transmission pipelines. (iv) Recreational facilities limited to open play areas and athletic fields not containing any permanent structures other than fencing, back stops, benches, bleachers, scoreboards and other similar accessory structures, provided that under no circumstances shall mechanical equipment of any type be permitted to be used in the installation or removal of such structures and further provided such facilities shall not adversely impact the structural integrity of transmission pipelines. (v) Off-street surface parking facilities, provided that such facilities will not adversely impact the structural integrity of transmission pipelines. (vi) Gardens or landscaping with low growing plants or ornamental type shrubbery, with no vegetation having a maximum expected height of more than four (4) feet, provided that under no circumstances shall mechanical equipment of any type be permitted to be used in the planting or removal of such vegetation. In addition, any vegetation required by this Ordinance shall be planted and maintained in such a manner that will not obstruct, restrict or impede any major underground utility easement. (vii) Accessory structures such as playground equipment, children's playhouses, doghouses, fences, storage structures and other similar structures which do not require approval of a Building Permit, provided that under no circumstances shall mechanical equipment of any type be permitted to be used in the installation or removal of such structures. (2) This Section shall not be construed to restrict measures necessary to identify the location of a transmission pipeline facility as required by the City or to restrict an operator or agent of a transmission pipeline facility from providing maintenance or emergency service to the underground facilities. (3) No soil shall be removed from or added to any lot in any zoning district except in accordance with one of the following provisions: A. Sod and soil may be removed from or added to any lot to a depth of not more than eighteen (18) inches but only in an area not exceeding 2,500 square feet; provided, however, that this provision shall not apply to the temporary storage of top soil by nurseries, and further provided that any sod and soil removal or addition within a major underground utility easement shall only be permitted in accordance with Subsection (1) above. In a floodplain, sod and soil may be removed in accordance with this paragraph, however, the addition of sod and soil shall only be permitted in accordance with the provisions of Subsection (1) above, or B. Notwithstanding the above, no building shall be erected, no filling or cutting, change in contours or establishment of any use or activity shall be permitted within a major underground utility easement except as may be approved by the Director in accordance with Subsection (1) above. (4) Any person who submits a site plan or subdivision plat application which proposes land disturbing activities within fifty (50) feet of or within a major underground utility easement located on the property shall send a written notice containing the information required by this paragraph, and a copy of such plan application to the owner of the major underground utility easement. Such notice shall include: (1) a legal description of the property subject to the application; (2) the location, ownership and purpose of the easement; and (3) such plan and notice shall be sent by certified mail, return receipt requested, postmarked no later than five (5) day after the initial submission of the plan to the Director, to the owner's current registered agent on file with the State Corporation Commission. A copy of the notice and plan with the corresponding postmarked white receipt shall be submitted to the Director and no plan subject to this paragraph shall be approved within forty-five (45) days following the postmark date on the white receipt for the certified mailing. (5) No building Permit shall be issued for the erection of any building or structure within any major underground utility easement except in conformance with Subsection (1), above.

Ask a question about Suffolk law

Corpus searches the Suffolk sections it holds and shows the ones that match, with their citations. Free, no sign-in.