§ 9.08 — Enforcement Procedure
Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Code of General Ordinances § 9.08
Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/1ce4c0d4-1438-49df-8e48-b917409da970
9.08. - Enforcement Procedure.
A. Inspections. No structural portion of any part of any Building, and no reinforcing steel, or structural framework of wood, steel, iron, concrete, nor any electrical, plumbing, heating, ventilating or air conditioning installations shall be concealed without first obtaining proper inspection and approval. B. Required Inspections. Required inspections are as follows: 1. Sewer and water connection(s). 2. Footings, after being formed and prior to pouring. 3. Foundation, prior to backfilling. 4. Post foundation survey. 5. Erosion control, prior to proceeding with framing. 6. Interior sewer. 7. Basement floor, prior to pouring. 8. Plumbing rough-in. 9. HVAC rough-in. 10. Electrical service and rough-in. 11. Carpentry rough-in. 12. All framing of structures. 13. Insulation. 14. Roofing (other than shingle replacement). 15. Final plumbing. 16. Final HVAC. 17. Final electric. 18. Final erosion control. 19. Final carpentry. 20. Occupancy. C. Other Inspections. In addition to the inspections listed in Section 9.08.B., the Code Official is authorized to make or require any other inspections to enforce any other State and City codes, laws, rules and regulations under the jurisdiction of the Department. D. Inspection Requests. It shall be the duty of the Permittee or their duly authorized agent to notify the Code Official when Work is ready for inspection. It shall be the duty of the Permittee to provide access to and means for inspection of the Work for any inspections required by this Code. E. Approval Required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Code Official. The Code Official, upon making the requested inspection, shall either indicate the portion of Work which is satisfactory as completed, or shall notify the Permittee or agent of the Permittee where the Work fails to comply. Any Work which does not comply shall be corrected and shall not be covered or concealed until authorized by the Code Official. F. Stop Work Order. 1. Authority. Whenever the Code Official finds any Work being performed in a manner contrary to the provisions of this Code, the Code Official is authorized to issue a Stop Work Order. 2. Issuance. The Stop Work Order shall be posted on the Premises where the violation exists, and the owner, owner's agent or contractor doing the Work shall be informed. Upon issuance of the Stop Work Order, the cited Work shall cease immediately. The Stop Work Order shall indicate the reason for the Stop Work Order, and the conditions under which the Work will be permitted to resume. 3. Unlawful Continuance. Any Person who shall continue any Work after having been served with a Stop Work Order, except Work that is allowed to correct a violation, shall be subject to the penalties as provided by this Code. G. Unsafe Conditions. Any Permittee shall be responsible to maintain the Work Site in a manner so as to be considered safe. The Code Official shall determine any additional safety measures which are to be taken, such as, but not limited to, fencing or other acceptable measures.
Ask a question about Kenosha law
Corpus searches the Kenosha sections it holds and shows the ones that match, with their citations. Free, no sign-in.
