For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9.17 — Razing of Buildings

Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Code of General Ordinances § 9.17

Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/f5231a6f-29db-4b6d-8a8d-7fac94ec3d03

9.17. - Razing of Buildings.

A. Permit. No Person shall raze any Building within the City without first obtaining a Raze Permit from the Department. 1. Application. The owner of the Building to be razed shall sign the Application For Raze Permit. In the alternative, an agent for the owner may sign the Application for Raze Permit upon providing written authorization verifying permission of the owner to apply for the Raze Permit. The Code Official may require additional information and other State or local Permits as required by law, rule or regulation. 2. Fees. Raze Permit fees shall be established by the City of Kenosha Common Council. 3. Performance and Payment Bond. Any application for a Raze Permit to engage in the razing of Buildings within the boundaries of the City shall be accompanied by a Performance and Payment Bond, approved by the City Attorney as to form, in the amount of the actual cost of the Work. The bond shall guarantee that all Work is performed in accordance with this Code and other State and local laws, rules and regulations, and hold the City harmless from any costs and expenses arising from the Work and secure timely performance of the Work. The City may reasonably require a bond of a greater amount, on a case-by-case basis, where deemed necessary, to protect the City. In extraordinary circumstances, the Common Council may allow for an alternate form of security in an amount deemed reasonably necessary and sufficient. 4. Comprehensive Liability Insurance. An applicant for a Raze Permit shall provide proof of comprehensive liability insurance in the amount of one million dollars ($1,000,000.00) per occurrence and per person and fifty thousand dollars ($50,000.00) property damage. 5. Disconnection of Utilities. The Permittee shall be responsible for the disconnections of utilities necessary for the razing, and shall provide evidence that necessary disconnections have been accomplished. B. Permit Conditions. All Raze Permits shall be subject to the following conditions: 1. Permit Term. The razing of a Building shall be completed within thirty (30) days after the date the Raze Permit was issued. The Code Official may at his/her discretion extend the Permit term for cause. "Cause" shall mean the inability of the Permittee to act due to circumstances beyond Permittee's reasonable control upon the exercise of due diligence. 2. Inspection of Work. Work done under a Raze Permit is subject to inspection by the Code Official who shall have the authority to order corrective Work. Failure to follow the orders of the Code Official, or to complete the raze in accordance with this Code, shall give the Code Official authority to seek restitution from the required bond. 3. Foundation of Razed Building. Unless otherwise approved by the Code Official, whenever a Building has been razed, the foundation, if any, shall be removed and filled in with clean fill material approved by the City Engineer with the top two (2) feet of fill material being dirt or sand. No combustible material may be used for the fill material. 4. Driveway Approaches, Driveway Aprons, Sidewalks and Slabs. Remaining Driveway Approaches shall be removed and replaced with curbs and gutters; damaged public sidewalks shall be replaced; and Driveway Aprons, remaining slabs and private sidewalks shall be removed from the site prior to final approval. Permits for replacing curbs and gutters, Driveway Approaches and public sidewalks shall be obtained from the Department of Public Works. 5. Site Grading. Whenever a Building has been razed, the site shall be graded with a minimum of three (3) inches of topsoil, with seed and mulch or sod applied to cover the entire disturbed area. 6. Disposal of Debris. The Permittee shall dispose of all Building debris in a licensed landfill, except for salvaged materials. At any time, the Permittee shall provide to the Code Official receipts and/or an itemized list of debris disposed of by dumping or salvage. 7. Site Safety and Security. The Permittee shall, during the razing process, maintain the razing site in a safe and secure condition, and the Permittee shall promptly report any personal injury and property damage to the Code Official. The Code Official may require additional safety and security methods, including fencing and gating, as deemed necessary to protect the site and restrict access to the public. C. Exemption. After consideration of the factors in this Subsection C., the City Engineer or his or her designee, which designee is a licensed engineer, may grant an exception for any property for which the City will be taking title to the removal and/or filling provisions of paragraph B.3 and/or the removal and replacement provision of paragraph B.4 and/or the grading or seeding provisions of paragraph B.5. In the exercise of discretion in granting an exception, the City Engineer or his or her designee, shall consider the following factors: 1. Type of contamination that may be on the property or the larger, integrated site associated with the Building to be razed; 2. Suspected level of contamination on the property based on best evidence available; 3. Possible vectors of migrations from the property; 4. Any known migration of contamination from the property; 5. Reasonableness of other means of remediation or containment; 6. Any communication from the state or federal government suggesting the necessity or adequacy of maintaining the foundation, or portion thereof, for environmental protection. D. Exemption. 1. Residential Remodeling. This Section shall not be construed to apply to contractors or homeowners doing demolition Work on part of a Building which is necessary in the course of Building Construction Work being conducted under a Building Permit. 2. Accessory Buildings and Detached Garages. This Section shall not apply to demolition of Accessory Buildings or detached garages not greater than five hundred (500) square feet. E. Raze Order Costs. The cost of razing or securing a Building subject to a raze order together with a one hundred dollar ($100.00) administrative fee shall be assessed as a special charge against the real estate upon which the Building is located, shall accrue interest at the rate established in Section 2.10 of the Code of General Ordinances, and shall be a lien against the real property until paid in full. The administrative fee is to cover the administrative costs of assessing the special charge against the real property.

Ask a question about Kenosha law

Corpus searches the Kenosha sections it holds and shows the ones that match, with their citations. Free, no sign-in.