Sec. 18-228. - Masonry construction—Generally.

(a) All masonry walls above grade shall be of the type as specified in Wis. Admin. Code, Ind. §§ 53.03 through 53.07, inclusive. (b) All masonry shall be laid up in mortar made of masonry cement of Portland cement with hydrated lime, combined with clean, well graded mason sand and potable water, proportioned by volume and thoroughly mixed to a workable consistency. (1) All masonry foundations in contact with the earth on one or two sides, cavity walls and load bearing walls above grade shall be laid with type M mortar. To prepare type M mortar, use one part masonry cement and one part Portland cement (type I or III) with 4½ to six parts mason sand; or 2½ parts Portland cement (type I or III) and one-half part hydrated lime with seven to nine parts mason sand. (2) All masonry veneer and non-load bearing walls above grade shall be laid with type N mortar. To prepare type N mortar, use one part masonry cement with 2¼ to three parts mason sand; or one part Portland cement (type I or III) and one part hydrated lime with 4½ to six parts of mason sand. (c) All masonry shall be protected against freezing for not less than 48 hours after installation and shall not be constructed below 28 degrees Fahrenheit on rising temperatures or below 36 degrees Fahrenheit on falling temperatures without temporary heated enclosures or without heating materials or other approved precautions necessary to prevent freezing. No frozen materials shall be used nor shall frozen materials be built upon. In warm weather, all clay or shale units of high absorption characteristics shall be thoroughly wetted before laying in the wall. All other masonry units, except gypsum units, laid in other than lime mortar, shall be wetted before laying in the wall if the absorption resulting from partial immersion in one-eighth inch of water for one minute is less than one percent. All masonry construction shall be adequately braced and supported to ensure its stability during construction.

(Code 1973, §§ 30.23.010, 30.24.010, 30.28.010)