For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Work in the Public Right-of-way and Public Easements

Boulder Revised Code tit. 8, ch. 5
in effect

Boulder Revised Code 1981 § 8-5-1 Legislative Intent.

Boulder Revised Code 1981 § 8-5-2 Definitions.

Boulder Revised Code 1981 § 8-5-3 Permit Required for Work in the Public Right-of-way and Public Easements.

Boulder Revised Code 1981 § 8-5-4 Permit Application.

Boulder Revised Code 1981 § 8-5-5 Permit Contents.

Boulder Revised Code 1981 § 8-5-6 Public Improvement Warranty.

Boulder Revised Code 1981 § 8-5-7 Inspections.

Boulder Revised Code 1981 § 8-5-8 Public Safety and Nuisance.

Boulder Revised Code 1981 § 8-5-9 Time of Completion.

Boulder Revised Code 1981 § 8-5-10 Temporary Traffic Control.

Boulder Revised Code 1981 § 8-5-11 Minimizing the Impacts of Work in the Rights-of-Way and Public Easements.

Boulder Revised Code 1981 § 8-5-12 Standards for Repairs and Restoration of Pavement or Sidewalks.

Boulder Revised Code 1981 § 8-5-13 Construction and Restoration Standards for Newly Constructed or Overlayed Streets.

Boulder Revised Code 1981 § 8-5-14 Relocation of Facilities.

Boulder Revised Code 1981 § 8-5-15 Joint Location of Utilities Required.

Boulder Revised Code 1981 § 8-5-16 Emergency Procedures.

Boulder Revised Code 1981 § 8-5-17 Work in the Public Right-of-Way or Public Easement Exempt from Required Permit.

Boulder Revised Code 1981 § 8-5-18 Revocation of Permits.

Source: City of Boulder, Colorado, Revised Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/co/boulder/codes/municipal_code?nodeId=TIT8PAOPSPSTPUWA_CH5WOPURI-WPUEAFetched: 11/14/2026