For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.32.200 — Nondomestic wastewater discharge permit

Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Municipal Code § 13.32.200

Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/8edea464-10e1-4cd5-b217-15aa22f3f6ab

§ 13.32.200: Nondomestic wastewater discharge permit.

A. The public works director shall be responsible for implementing the applicable pretreatment standard, either federal or local limits, whichever one is more stringent at the time. The public works director shall enforce the standards on industrial users and nondomestic wastewater dischargers through individual permits. B. Each industrial user or nondomestic wastewater discharger shall complete and submit a nondomestic wastewater survey questionnaire and permit application for review by the public works director. The survey and application data shall include the following information: 1. User's name, address and telephone number; 2. Standard Industrial Classification (SIC) number; 3. Products and production rates, or services rendered; 4. Number of employees, business hours; 5. Flow rate, time and duration of discharge; 6. Wastewater constituents and characteristics; 7. Site plans, floor plans, mechanical and plumbing plans and details to show all sewer laterals, sumps, cleanouts, floor drains and all tanks including their sizes, locations and contents; 8. Pretreatment system design and specifications including flow diagrams, alarms, backup system and operation and maintenance program; 9. Description of activities, facilities, plant processes, and any substance which is or could be discharged to the community sewer; 10. A list of any liquids, sludges, oils, solvents, or other chemicals or wastes, including quantities, storage facilities and methods of disposal; 11. Certification and signature of an authorized representative of the owner of the business or facility that the owner will accept responsibility for complying with the provisions of this section; and 12. Any other information as may be required by the public works director. C. Each user discharge point to the community sewer system that carries any nondomestic sewage shall be required to be permitted and shall be considered a separate nondomestic discharge point source. More than one point source may be included in a single permit. D. If the applicant or user complies with the requirements of this section, and if the public sewer has adequate capacity for the volume of the wastewater to be discharged, the public works director may issue a nondomestic wastewater discharge permit subject to terms and conditions provided herein: 1. A nondomestic wastewater use questionnaire has been completely and correctly filled out and signed by the user representative, the owner or corporate officer; 2. The quality of the wastewater to be discharged to the community sewer system conforms to the requirements of this chapter and the most current pretreatment standards and/or local limits, whichever is the most restrictive; 3. A compliance time schedule has been approved by the public works director (if required) and is on file with the public works department; 4. The community sewer system has adequate capacity for the volume of wastewater to be discharged; 5. Any required pretreatment system must be approved by the public works director and be demonstrated by the user to adequately achieve existing local limits or pretreatment standards, whichever is the more strict, as well as have the capability to handle, or can be easily modified to handle, future requirements; 6. A city approved industrial wastewater monitoring vault, manhole, or other approved monitoring facility has been constructed, or shall be constructed, and has been included in the compliance time schedule. E. The nondomestic wastewater discharge permit shall state the following: 1. The dates of issuance and expiration; 2. The identification, SIC number, and location of the discharger; 3. The nature of the operation, the amount of flow, and constituents that are found in the wastewater; 4. Any controls which the public works director finds necessary to ensure that the community sewer system may serve its intended purpose. These controls will include all applicable federal pretreatment standards and requirements and local limits; 5. The points of discharge to the community sewer system. F. Permit Duration. A nondomestic wastewater discharge permit shall be issued for a specified time period not to exceed five years. Under special circumstances, the public works director at his or her option may extend the permit duration for an additional time period not to exceed one year. The user shall apply for renewal not later than 60 days prior to the expiration date of the permit. After submitting an application for renewal, the permit shall automatically be extended until the public works director makes a determination on the application for renewal. G. Permit Conditions. A nondomestic wastewater discharge permit shall be expressly subject to all provisions of this section of the code, and all other regulations, user charges and fees established by the city. If any provision of the permit, or the application of any provision of the permit to any circumstance is held invalid, the application of such provision to other circumstances, and the remainder of the permit shall not be affected thereby. The nondomestic wastewater permit may include any of the following conditions: 1. Requirements for self-monitoring, including frequency and method of wastewater sampling and analysis; 2. Requirements to submit monitoring reports, technical reports, production data and/or waste manifests; 3. Compliance schedule to install monitoring, or pretreatment devices or facilities; 4. Prohibitions, discharge limits and/or mass emission rates; 5. Limits on rate and time of discharge or requirements for flow regulation and equalization; and 6. Other provisions and conditions to ensure compliance with this section and any other mandated federal, state or local requirements and to protect the community sewer system. H. Change of Permit Conditions. The public works director may modify the terms and conditions of a nondomestic wastewater discharge permit during the life of the permit. 1. The discharger shall submit to the public works director, within a reasonable time, any documents or records maintained by the discharger and requested by the director to determine whether cause exists for rescinding, modifying, revoking or reissuing the permit; or to determine compliance with the permit requirements. 2. The director shall inform the discharger of any proposed changes or new conditions in the permit and shall include a reasonable period of time for compliance. 3. The user shall have the right to file with the director a written request to reduce monitoring and/or reporting requirements or to have other permit conditions modified or changed. Any request by the user to modify the discharge permit shall be processed, if approved by the director, after payment of applicable fees and charges. I. Nontransferability, Permit Revocation and Re-application. 1. Under no circumstance shall a wastewater permit be assigned, transferred or sold to a new user, different premises, or a new, changed, or revised business operation. 2. If a user's nondomestic wastewater permit has been revoked, and if that user chooses to again discharge to the community sewer system, the user's industrial representative must apply for a new nondomestic wastewater permit. Prior to the issuance of the new permit, the industrial wastewater representative must demonstrate or prove to the public works director's satisfaction that either a safety backup system(s) and/or precautionary measures have been incorporated into their business process to eliminate similar conditions in the future which caused the revocation of the original permit. 3. Within one month after a user has received the replacement permit, after having his or her permit cancelled, the user shall submit to the public works director a 24-hour flow weighted composite analysis of the wastewater being discharged to the community sewer system for all constituents and parameters requested by the public works director.

( Prior code § 5860.9 )

Ask a question about Upland law

Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.