§ 13.32.270 — Reporting requirements for industrial users
Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Municipal Code § 13.32.270
Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/9302e795-a143-4947-92b4-94b63156f1d6
§ 13.32.270: Reporting requirements for industrial users.
A. Baseline Monitoring Reports, Categorical Industries. 1. Within 180 days after the effective date of a categorical pretreatment standard, or 180 days after the final administrative decision made upon a category determination submission under 40 CFR 403.6(a)(4), whichever is later, existing categorical IUs currently discharging to, or scheduled to discharge to, the community sewer system shall be required to submit to the public works director a baseline monitoring report that indicates whether the IU meets the standards of 40 CFR 403.12(b). The BMR contains at a minimum, the information required in 40 CFR 403.12(b)(1—7) including the following: a. Identifying Information. The IU's name and address of the facility including the name of the operator and owners; b. Environmental Permits. A list of any environmental control permits held by or for the facility; c. Description of Operations. A brief description of the nature, average rate of production, and SIC of the operation(s) carried out by the IU, such description to include a schematic process diagram which indicates points of discharge to the community sewer system from the regulated processes; d. Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the community sewer system from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula. The public works director may allow for verifiable estimates of the above flows where justified by cost or feasibility considerations; e. The pretreatment standards applicable to each regulated process; f. Measurement of Pollutants. The results of sampling and analyses identifying the nature and concentration (or mass if required) of regulated pollutants in the discharge from each regulated process. Both daily maximum and average concentration shall be reported. The sample shall be representative of daily operations, and shall be analyzed in accordance with standard methods and procedures; g. Certification. A statement, reviewed by an authorized representative and certified to by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O and M) and/or additional pretreatment is required for the IU to meet the pretreatment standards and requirements; h. Compliance Schedules. If additional pretreatment and/or O and M will be required to meet the pretreatment standards, the IU will provide a compliance schedule in conformance with subsection I of this section. 2. At least 90 days prior to commencement of discharge, new sources and sources that become categorical IU's subsequent to the promulgation of an applicable categorical standard shall submit to the public works director a report which contains information listed in 40 CFR 403.12(b)(15) and subsection (A)(1) of this section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged, 40 CFR 403.12(b) (4,5). 3. The BMR shall be certified in accordance with the requirements of 40 CFR 403.12(1) and 40 CFR 403.6(a)(2)(ii) and signed by the authorized representative. B. Reports of Compliance with Categorical Pretreatment Standard Deadlines, Periodic Compliance Reports, Categorical IU's. 1. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the community sewers or POTW, any IU subject to such pretreatment standards and requirements shall submit to the public works director a report containing the information described in subsections (A)(4), (5), (6) and (7) of this section and 40 CFR 403.12(b)(4—6). This report shall indicate the nature and concentrations of all limited pollutants in the IU's regulated discharges and the average and maximum daily flow for these discharges. The report must also indicate whether pretreatment standards are being met consistently, 40 CFR 403.12(d), and shall include the following information: a. A reasonable estimate of the user's long-term production rate if the user is subject to equivalent mass or concentration limits established by the public works director in accordance with the procedures in 40 CFR 402.6(c); or b. The IU's actual production during the appropriate sampling period, if the user is subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production or other measure of operation. 2. All dischargers subject to categorical pretreatment standards shall be required to submit to the public works director twice per year, in June and December, a report indicating the following: a. The IU's name, address, telephone number, city wastewater permit number, and categorical classification; b. A wastewater quality and quantity listing of all wastewater monitoring during the previous six-month period; c. The identification of each of the monitoring as to the method of collection (24-hour time composite, 24-hour flow weighted composite, or a grab sample) and a statement as to whether the monitoring was city required or self monitoring, and if it was scheduled or unscheduled; d. A statement of validity of the report signed by the authorized industrial representative. 3. If a user subject to the reporting requirements of this subsection monitors any pollutant more frequently than required, the results of such monitoring shall be included in the report required under subsection (B)(2) of this section. C. Report of Compliance, Start-Up Wastewater Analysis, New Sources. A report of compliance shall be required of all new source users of the community sewer system prior to issuance of the city's nondomestic wastewater permit or an amended nondomestic wastewater permit. The letter of compliance must be approved by the public works director before it is considered valid and shall include at least the following: 1. Results of start-up wastewater monitoring and analysis on the wastewater discharges leaving the user's facility that comply with the city's monitoring requirements established in this chapter. 2. All start-up monitoring shall be required to analyze, but not be limited to, the following parameters and constituents; biochemical oxygen demand (BOD); chemical oxygen demand (COD); total suspended solids (TSS); total dissolved solids (TDS); total organic carbon (TOC) phenols; total oils and grease; pH; sodium; chloride; sulfate; boron; total and organic nitrogen; copper; total and hexavalent chromium; cadmium; lead; nickel; zinc; amenable and nonamenable cyanide; iron; mercury; total daily flow (gallons per day); peak flow (gallons per day) and its times; and a concurrent water meter reading with the water flow monitoring. 3. The results of the analysis must be submitted to the public works director no later than 30 days from the date of initial discharge to the community sewer system and if a wastewater violation is identified from the start-up monitoring, the discharger shall be notified by the public works director and the user must immediately cease and desist from permit violation(s). 4. The letter of compliance must be signed by the owner, president, or chairman of the board of the nondomestic discharger. D. Reporting and Immediate Notification of Spills, Slug Loadings and Accidental Discharges, Potential Problem Discharges. 1. In the event of any spills, accidental discharge, discharges of nonroutine, episodic nature, a noncustomary batch discharge, an unintentional by-pass, an upset or a slug loading that may cause potential problems for the POTW, the discharger shall immediately telephone and notify the city and CBMWD: City of Upland: Public works department..................(909) 931-4230 (Mon-Fri, 7:00 am - 5:00 pm) Fire department..........................(909) 931-4180 (All other hours) Chino Basin Municipal Water District: Industrial Waste Division................(909) 987-1712 (Mon-Fri, 8:00 am - 5:00 pm) Operations, RP-1.........................(909) 947-4131 (All hours) 2. The notification shall include time, location, type, concentration and volume of the discharge and the corrective actions which have been taken. In no event shall the availability of the public works director or the CBMWD relieve the discharger from the time limitations for notification established in this chapter. No statement in this section shall be construed as relieving the discharger from the notification requirements of other federal, state or local regulations. 3. The user shall ensure that all employees in a position to cause or allow uncontrolled discharge to occur are advised of this notification procedure. A legible, understandable and conspicuously placed notice shall be permanently posted on the user's bulletin board or other prominent place advising employees of the notification procedure. 4. As soon as any person in charge of a facility or responsible for emergency response for a facility has knowledge of any confirmed or unconfirmed release of materials, pollutants or waste which may result in pollutants or waste entering the community sewer, such person shall take all necessary steps to ensure the discovery and containment and clean up of such releases and shall immediately notify the city at the phone numbers indicated in subsection (D)(1) of this section. 5. Within five working days following a spill an accidental discharge, an unintentional bypass, an upset or a slug loading, the discharger shall submit to the public works director, a written report describing in detail the type, volume and cause of the discharge, corrective actions taken and measures to be taken to prevent future occurrences. 6. Such notification shall not relieve the discharger of any fines or civil penalties incurred as a result of such event, or any other liability which may be imposed by this chapter or other applicable laws. E. Slug Discharge Control, Accidental Spill Prevention Plans. At least once every two years, the public works director shall evaluate whether each permitted significant IU needs a plan or needs to update existing plans to control slug discharges as defined under 40 CFR 403.5(b). Upon written notification from the public works director, the IU shall submit a slug control or accidental spill prevention plan that shall contain at a minimum the following elements: 1. Description of discharge practices, including nonroutine batch discharges; 2. Description of stored chemicals; 3. Procedures for promptly notifying the public works director and CBMWD of slug discharges, including any discharge that would violate a specific prohibition under 40 CFR 403.5(b) with procedures for followup written notification within five days; 4. If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents) and/or measures and equipment for emergency response; 5. If necessary, follow-up practices to limit the damage suffered by the treatment plant or the environment. F. Reporting and Notification of Hazardous Wastes Discharges. 1. IUs shall notify the public works director, CBMWD, the EPA Regional Waste Management Division Director, and state hazardous waste authorities in writing of any discharge into the POTW of a substance, which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. 2. Such notification must include the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch or other). 3. If the IU discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent such information is known and readily available to the IU: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. 4. Any notification under this subsection need be submitted only once for each hazardous waste discharged. 5. IUs are exempt from the above requirements during a calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of non-acute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), require a one-time notification. Subsequent months during which the IU discharges additional quantities of such hazardous waste do not require additional notification. 6. In the case of new regulations under Section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the IU must notify the public works director, CBMWD, the EPA Regional Waste Management Division director, and state hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations. 7. In the case of any notification made under this subsection, the IU shall certify that it has a program in place to reduce the volume and/or toxicity of hazardous wastes generated to the degree it has determined to be economically practical. 8. The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements of 40 CFR 403.12(b),(d),(e). 9. The provisions of this subsection do not create a right to discharge any substance not otherwise permitted to be discharged by this chapter, a nondomestic wastewater permit issued hereunder or any applicable state or federal law. G. Notice and Reporting of Changed Discharge. The discharger shall notify the public works director a minimum of 30 days prior to any planned changes in the permit conditions as related to flow rate and chemical composition of the wastewater, on-site plumbing or pretreatment procedures and/or facilities. Upon such notification the public works director may require that a new application be filed and new permit obtained before any waste discharge involving the changed characteristics takes place. H. Notice and Reporting Of Discontinued Discharge. 1. The IU shall notify the public works director at least 10 days prior to discontinuing its nondomestic wastewater discharge for more than 30 days unless the IU can demonstrate to the director that it could not have known of the discontinued discharge. 2. Within 30 days of discontinued discharge, the user shall remove the contents of all on-site sewers, sumps, floor drains, wastewater storage tanks, and/or pretreatment facilities in accordance with all applicable regulations. The contents shall not be discharged to the public sewer without prior written approval from the public works director. 3. If the IU fails to clean up and remove the contents of the on-site facilities listed in subsection (H)(2) of this section to the satisfaction of the director, such activities and the costs thereof shall also become the responsibility of the owner of the building and/or land. 4. Failure of the user or the owner to promptly and satisfactorily clean up and remove the contents of all on-site sewers, sumps, floor drains, wastewater storage tanks and/or pretreatment facilities shall subject the user and the owner of the building and/or land to any enforcement action authorized in this chapter. I. Compliance Schedule Progress Reports. The following conditions shall apply to the compliance schedule required by subsection (A)(1)(h) of this section: 1. The IU shall submit a compliance schedule, which shall contain progress increments in the form of dates for commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet applicable pretreatment standards. The completion date in this schedule shall not be later than the compliance date established for any applicable pretreatment standard. No such increment in the compliance schedule shall exceed nine months in accordance with 40 CFR 403.12 (c). 2. If the construction of a monitoring facility, secondary spill containment, or a pretreatment facility is required to meet the city's pretreatment requirements or to correct a recurring violation of a local discharge limitation, the user shall submit a compliance schedule. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the design, construction and operation of the facility and other corrective measure such as in-plant or onsite wastewater studies to identify and correct a wastewater discharge violation. 3. Each increment in the compliance schedule is subject to review and approval by the public works director. No such increment shall exceed nine months. 4. Not later than 14 days following each date in the schedule and the final date for compliance, the IU shall submit a progress report to the director including, at a minimum, whether or not the user complied with the increment of progress to be met on such date and if not, the date on which the user expects to comply with this increment of progress, the reason for the delay and the steps taken by the user to meet the established schedule. In no event shall more than nine months elapse between such progress reports to the director. 5. Modifications or changes to a compliance time schedule may be granted by the public works director upon written request providing the new compliance dates are not in violation with the current pretreatment standards for the type of discharger in question. 6. Regardless of a valid permit or compliance time schedule, all dischargers in violation with the current local limits shall be required to pay their flow-weighted portion of any California Regional Water Quality Control Board (CRWQCB) fines assessed directly or indirectly to the city for any constituent loadings in violation with the current local limit and shall be subject to all cost and payment for damages incurred to the community sewer system and/or treatment plant. J. Total Toxics Organics (TTO) Monitoring Certification. 1. In lieu of requiring monitoring for all toxic organics, the public works director may allow a user who is required to monitor for these constituents to make the following certification statement: Based on my inquiry of the person or persons directly responsible for managing compliance with the permit limitation and pretreatment standard for total toxic organics (TTO), I certify that, to the best of my knowledge and belief, no discharge of toxic organics into the public sewer has occurred since filing of the last annual statement of certification. I further certify that this facility is implementing the Toxic Organic Management Plan (TOMP) submitted to the public works director. 2. The TOMP shall specify to the satisfaction of the public works director the toxic organic compounds used on-site, the method of their disposal, and the measures taken to ensure that those compounds do not spill, leak or in any other way enter into the community sewer. 3. The certification and updated TOMP shall be submitted by the IU with the first monitoring report of each year. 4. The IU requesting the certification alternative shall monitor only for those toxic organic compounds which would reasonably be expected to be discharged to the community sewer. K. Reports and Records Keeping. All IUs subject to the reporting requirements of this chapter shall retain and keep copies of all information resulting from any monitoring activities, e.g., wastewater reports, surveys, permits, monitoring, wastewater correspondence, violation notices, and chain-of-custody logs. Upon request, this information must be made available for review and/or copying by any government agency. This record shall remain available for a period of at least three years. This period shall be automatically extended for the duration for any litigation concerning the IU or the city, or when the IU has been specifically notified of a longer records retention period by the public works director.
( Prior code § 5860.16 )
Ask a question about Upland law
Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
