§ 13.32.310 — Interagency wastewater connection requirements and agreement
Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Municipal Code § 13.32.310
Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/1981e9f9-0802-4209-be0a-4bc91e8b359d
§ 13.32.310: Interagency wastewater connection requirements and agreement.
A. If another city or municipality or an IU situated outside of the city contributes wastewater to the community system, the public works director shall require and enter into an interagency agreement with the contributing city. B. The IU or any public agency desiring a sewer connection to the city must submit to the city a written request for an interagency connection point. This request shall include: 1. A plot map of the area to be served including the distance to the proposed connection point; 2. The current zoning and acreage of each of the zoned regions of the area; 3. The percentage of existing development in each zoned region; 4. The current average and peak flow and wastewater quality from the total proposed area; and the project maximum peak and average flows from the total area at build out; 5. An inventory of all users within the contributing municipality that are discharging to the community sewer; and 6. Such other information as the public works director may deem necessary. C. The city shall have the right to deny the request for any reason. D. The contract agreement must be written by the source agency but reviewed and approved by the city and must include, but not be limited to, the following: 1. A statement of agreement to construct, at no expense to the city, all sewer facilities necessary to convey the sewage from the source agency area to the city's community sewer system. 2. All construction plans must be approved by the public works director and all construction done in the city including a monitoring manhole at the connection point must be inspected and built to the city standards. As built plans must also be submitted to the city upon completion of the work, all at no cost to the city. 3. The discharger shall agree, at its own expense, to submit to the city no later than 45 days from the date the connection point becomes active, a 24-hour flow weighted composite analysis on the effluent entering the city at the connection point for all the parameters and constituents listed in the Chino Basin Municipal Water District Regional Contract and shall agree to submit to the city a similar analysis every six months starting from the submittal date of the first analysis. The limits on the nature, quality and volume of wastewater from the contributing agency shall be established by the city. 4. The water laboratory used by the source agency for the monitoring and analysis work must be certified by the state and a copy of all the intercity connection point monitoring must be sent to the city either by the contributing agency or directly from the laboratory. 5. If the connection point is to be eliminated, the source agency shall be required to abandon the intercity connection to current city standards on the source agency's side of the city's boundary line at no expense to the city. 6. The requesting agency shall collect all sewer fees as established by the city and transfer this money biannually to the city. 7. The requesting agency shall be responsible for notifying the city of any growth in this sewered area, and agree to let the city enforce their pretreatment program in the source agency's sewered area. The public works director shall be allowed access to the facilities of lUs located within the contributing jurisdictional boundaries for the purpose of inspection, sampling or any pretreatment related duties. 8. The city agrees to accept and deliver to the wastewater treatment plant all sewage discharged through this connection point providing all predetermined flow and water quality criteria are being met. 9. The city shall have the right to stop the sewer flow or eliminate the intercity connection point if any of the above criteria are violated, but must notify the source agency in writing of the city's intent and establish a date and time the connection point may be abolished. 10. The source agency shall be responsible for submitting an executed copy of the interagency agreement to Chino Basin Municipal Water District.
( Prior code § 5860.20 )
Ask a question about Upland law
Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.