§ 13.32.280 — Compliance monitoring, sampling and inspection
Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Municipal Code § 13.32.280
Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/42bd582a-8873-485d-827b-2884144b5065
§ 13.32.280: Compliance monitoring, sampling and inspection.
A. Right of Entry. The public works director shall have the right to enter, randomly and unannounced, onto the premises of each nondomestic discharger for the purpose of wastewater monitoring at each point source, the review and copying of wastewater monitoring data, records, logs, reports, and plant inspections to determine whether the user is complying with all the requirements of this chapter and the nondomestic wastewater discharge permit. The IU shall allow the director access to all parts of the premises for the performance of the compliance determination. 1. Where an IU has security measures in force which require proper identification and clearance before entry into the premises, the IU shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the director will be permitted to enter without delay for the purposes of performing specific responsibilities. 2. The public works director shall have the right to set up on the IU's property, or require installation of such devices necessary to conduct sampling and/or metering of the user's operations. 3. Any temporary or permanent obstruction to safe, easy access to the facility inspected and/or sampled shall be promptly removed by the IU at the written or verbal request of the public works director and shall not be replaced. The costs of such clearing shall be borne by the IU. 4. Unreasonable delays in allowing the public works director access to the IU's premises shall be a violation of this chapter. 5. Search Warrants. If the public works director has been refused access to a building, structure or property, or any part thereof and is able to demonstrate probable cause to believe that there may be a violation of this chapter, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of the city designed to verify compliance with this chapter or any permit or order issued hereunder, or to protect overall public health, safety and welfare of the community, the public works director may seek issuance of a search warrant from the county superior court. B. All nondomestic discharge point sources to the community sewer system shall be required to be periodically monitored as set by permit. The monitoring program shall include the constituents and parameters that shall be analyzed from each discharge point. C. The point for compliance determination with the provisions of this chapter shall be at each discharge point source to the community sewer system or at such other upstream point on the private lateral or sewer connection of each user as mutually agreed upon by the discharger's representative and the public works director. D. Sampling and Analysis Procedures. 1. Periodic measurements of flow rates, flow volumes and wastewater characteristics for compliance with any limitations or requirements specified in the nondomestic wastewater discharge permit or this chapter shall be done by the IU using appropriate procedures set forth in 40 CFR Part 136. 2. Routine monitoring and sampling shall be conducted at the city approved monitoring point and during normal business operations of the IU. 3. When requested by the public works director or the user, a split sample will be provided to the other party to verify the levels of constituents in the wastewater. 4. Each nondomestic discharger shall be responsible for the following: a. Notification, contracting or hiring of a state-certified laboratory to perform the required monitoring and analyses within the set time limitations; b. Monitoring of each nondomestic wastewater discharge point on a 24-hour flow weighted composite sampling basis over a typical work day period; c. Determining that the laboratory uses the test procedures found in 40 CFR Part 136 for the analyses of the wastewater samples, whenever applicable; d. Supplying the laboratory with a complete constituent and parameter listing prior to any field monitoring; e. Sending all city required wastewater analyses reports to the public works director either directly from the IU or through the laboratory; f. Assuming the responsibility and the cost for the construction and maintenance of all in plant monitoring facilities as well as for the laboratory and monitoring charges. E. Laboratory Reports, Wastewater Analysis. 1. Test results of wastewater samples shall be verified by an authorized representative of the IU, signed and certified in accordance with the requirements of 40 CFR 403.12(1) and Section 13.32.290. 2. If the user elects to have the laboratory submit the results of the wastewater samples directly to the public works director, the laboratory director shall verify, sign and certify such reports. 3. If sampling performed by the IU indicates a violation, the IU shall notify the public works director within 24 hours of becoming aware of the violation. 4. No laboratory report shall be accepted by the public works director without a chain-of-custody log. The chain-of-custody log shall contain the following information: sample source; date, time and method of sampling and sample preservation; type of container used; sampler identification; results of any field measurement or observation; and any other information related to sampling handling from the sampling site to the laboratory. 5. The public works director shall consider any laboratory report submitted to the city as being invalid and unacceptable if any of the following has occurred: a. The IU fails to submit a chain-of-custody log with the report; b. The sample was not collected at the approved monitoring point; or the sample tested did not represent permitted wastestreams; c. The report or analysis is incomplete, and if the discharger does not submit to the city an amended report or a supplemental analysis report from the same laboratory within 30 days from the date of the notice of incompleteness or omission; d. A state-certified laboratory and standard methods and procedures are not used; e. The results of the laboratory report submitted to the city cannot be verified by the laboratory; f. Either the laboratory or city personnel discover the monitoring equipment has been tampered with, readjusted, or the wastewater loadings and/or flow have been adjusted or changed to reflect an atypical situation. F. It is unlawful, and the nondomestic discharger shall be held financially responsible, for any damage, breakage, or tampering of any laboratory or city monitoring equipment while it is in use either in, on, or next to the monitoring facility of the discharger. G. If the public works director feels there is probable cause that a wastewater discharge or monitoring violation has occurred, the public works director has the right to contract with a state-certified laboratory and have the discharger's effluent monitored and analyzed, or the public works director may send a city crew to monitor the discharger's effluent and have the sample sent to a state-certified laboratory with the total cost of either procedure assumed by the discharger in question. H. Annual Publication of Significant Noncompliance. In accordance with the federal pretreatment regulations, 40 CFR 403.8, the public works director shall annually cause to be published the name and address of each IU who currently is or was in significant noncompliance during the previous 12 months in a newspaper of general circulation published and/or circulated in the city.
( Prior code § 5860.17 )
Ask a question about Upland law
Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
