§ 18-184 — IRC - Section R401.4, Soil tests
Code of Ordinances of the City of Arvada, Colorado (Supp. No. 67: codified through Ordinance No. 4932, enacted May 5, 2026) · Arvada Code of Ordinances § 18-184
Corpus is an independent public-information project, not the official City of Arvada website. Stable reference: corpuslaw.us/code/99484ba7-9b72-461f-9e0b-287b6483dfb4
Sec. 18-184. - IRC - Section R401.4, Soil tests.
Section R401.4. Soil tests, is hereby amended in its entirety to read as follows: "R401.4. Soil tests and Foundation Plans. Expansive soils are deemed present throughout most of the city. A soils report and registered design professional stamped foundation plans are required for all new construction. Soils reports shall be prepared by a state registered geotechnical engineer and foundation plans shall be prepared by a state registered professional engineer. The documents must specifically include design computations for pier diameter and length, describe methods to provide restraint from lateral soil pressures, provide a slab performance risk evaluation, compaction, and soil preparation requirements for slab on grade, and other information deemed necessary to the engineer of record. Where the seismic design category in accordance with Section R301.2.2.1 is C or greater and where soil testing is performed, the geotechnical report shall include the determination of the site class and the short-period spectral response acceleration, SDS , in accordance with Section 1613 of the International Building Code. The seismic design category shall be assigned in accordance with Table R301.2.2.1.1. Exceptions: 1. If the existing foundation of an R-3 residential building or an IRC compliant residential building is performing adequately, foundations for additions to such existing buildings are allowed to match the existing foundation type without the need for a soils report as long as one or more of the following exceptions is met: a. An open hole soils investigation by a state licensed geotechnical engineer is provided prior to pouring concrete foundation elements and is evaluated by the design professional of record. b. The Engineer of record uses the worst case scenario soil bearing capacity in the design of the foundation. 2. Decks, patio covers and pergola projections attached to an existing R-3 residential building need not provide a soils report or engineered foundation plans, unless deemed necessary by the code official. 3. Detached accessory structures for R-3 residential Buildings or IRC compliant residential buildings under 600 sf and under 10' eave height that are non-habitable, need not provide a soils report or engineered foundation plans unless deemed necessary by the code official."
(Ord. No. 4921, § 7, 3-24-2026)
Ask a question about Arvada law
Corpus searches the Arvada sections it holds and shows the ones that match, with their citations. Free, no sign-in.
