For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2 — DEFINITIONS

Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025) · New Haven Flood Damage Prevention Code § 2

Corpus is an independent public-information project, not the official City of New Haven website. Stable reference: corpuslaw.us/code/a9c1f47f-6a6a-423d-a0f3-da56f5bdfa6e

SECTION 2. - DEFINITIONS

2.1 Unless specifically defined below, words or phrases used in this ordinance shall be interpreted so as to give them the meaning they have in common usage and to give this ordinance its most reasonable application. 2.1.1 Addition (to an existing building): Any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load- bearing wall other than a fire wall. Any walled and roofed addition which is connected by a fire wall or is separated by independent perimeter load-bearing walls in new construction. 2.1.2 Appeal: A request for a review of the Building Inspector's interpretation of any provision of this ordinance or a request for a Flood Damage Prevention (FDP) Variance. 2.1.3 Area of special flood hazard: The area within a community subject to one percent or greater chance of flooding in any given year. 2.1.4 Base flood: The flood having a one percent chance of being equaled or exceeded in any given year. 2.1.5 Base Flood Elevation (BFE): The elevation of the crest of the base flood or 100-year flood. The height in relation to mean sea level expected to be reached by the waters of the base flood at pertinent points in the floodplains of coastal and riverine areas. 2.1.6 Basement: That portion of a building having its floor subgrade (below ground level) on all sides. 2.1.7 Breakaway Wall: A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation system. 2.1.8 Building: Any structure built for support, shelter, or enclosure for any occupancy or storage. 2.1.9 Coastal AE Zone: The portion of the Coastal High Hazard Area with wave heights between 1.5 feet and 3.0 feet during the base flood and seaward of the line labeled the "Limit of Moderate Wave Action" (LiM\VA) on a Flood Insurance Rate Map (FIRM). 2.1.10 Coastal High Hazard Area: The area of special flood hazard extending from offshore to the inland limit of a primary frontal dune along an open coast and any other area subject to high velocity wave action from storms or hurricane wave wash, designated on a FIRM as zone VE, V or Coastal AE. 2.1.11 Cost: As related to substantial improvements, the cost of any reconstruction, rehabilitation, addition, alteration, repair or other improvement of a structure shall be established by a detailed written contractor's estimate. The estimate shall include, but not be limited to: the cost of materials (interior finishing elements, structural elements, utility and service equipment); sales tax on materials, building equipment and fixtures, including heating and air conditioning and utility meters; labor; built-in appliances; demolition and site preparation; repairs made to damaged parts of the building worked on at the same time; contractor's overhead; contractor's profit; and grand total. Items to be excluded include: cost of plans and specifications, survey costs, permit fees, outside improvements such as septic systems, water supply wells, landscaping, sidewalks, fences, yard lights, irrigation systems, and detached structures such as garages, sheds, and gazebos. 2.1.12 Critical facilities: Structures and institutions that are deemed by the local community and other jurisdictions as critical to the continuity of the community before, during, and after an event. Structures include, but are not limited to, schools, hospitals and healthcare facilities, police and fire stations, permanent emergency shelters and permanent emergency operations centers, jails and prisons, stormwater and wastewater management devices and facilities, and critical records storage. 2.1.13 Development: Any man-made change to improved or unimproved real estate, including, but not limited to, the construction of buildings or other structures; the construction of additions, alterations or substantial improvements to buildings or structures; the placement of buildings or structures; mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment; the storage, deposition, or extraction of materials; and the installation, repair or removal of public or private sewage disposal systems or water supply facilities. 2.1.14 Elevated building: A non-basement building built to have the lowest floor elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns (posts and piers), shear walls, or breakaway walls. 2.1.15 Existing manufactured home park or subdivision: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured home are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before June 19, 1980, the effective date of the floodplain management regulations adopted by the community. 2.1.16 Expansion to an existing manufactured home park or subdivision: The preparation of additional sites by the construction of facilities for servicing the lots on which the manufacturing homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads). 2.1.17 Federal Emergency Management Agency (FEMA): The federal agency that administers the National Flood Insurance Program (NFIP). 2.1.18 Finished living space: As related to fully enclosed areas, a space that is, but is not limited to, heated and/or cooled, contains finished floors (tile, linoleum, hardwood, etc.), has sheetrock walls that may or may not be painted or wallpapered, and other amenities such as furniture, appliances, bathrooms, fireplaces and other items that are easily damaged by floodwaters and expensive to clean, repair, or replace. A fully enclosed area below the BFE plus two feet of freeboard shall not have finished living space and needs to be designed for exposure to flood forces and shall only be used for parking, building access or limited storage. 2.1.19 Flood or flooding: A general and temporary condition of partial or complete inundation of normally dry land areas from: 1. The overflow of inland or tidal water; 2. The unusual and rapid accumulation or runoff of surface waters from any source 2.1.20 Flood Insurance Rate Map (FIRM): An official map of a community on which the Federal Emergency Management Agency has delineated both the areas of special flood hazard and applicable risk premium zones. 2.1.21 Flood Insurance Study: The official report of the Federal Emergency Management Agency. The report contains flood profiles as well as the Flood Boundary Floodway Map and the water surface elevation of the base flood. 2.1.22 Floodway: The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. 2.1.23 Functionally dependent use or facility: A use or facility that cannot perform its intended purpose unless it is located or carried out in close proximity to the water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities. The term does not include seafood processing facilities, long-term storage, manufacturing, sales or service facilities. 2.1.24 Highest adjacent grade: The highest natural elevation of the ground surface, prior to construction, next to the proposed walls of a structure. 2.1.25 Historic structure: Any structure that is: (a) listed individually in the National Register of Historic Places (a listing maintained by the Department of the Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (b) certified or preliminarily determined by the Secretary of the Interior as contributing to the historic significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; (c) individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or (d) individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: (1) by an approved state program as determined by the Secretary of the Interior or (2) directly by the Secretary of the Interior in states without approved programs. 2.1.26 Limit of moderate wave action (LiM\VA): The landward limit of the 1.5-foot breaking wave within a Coastal AE Zone. These areas are seaward of the line labeled "Limit of Moderate Wave Action" (LiMWA) on a Flood Insurance Rate Map (FIRM). 2.1.27 Lowest floor: The lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access or storage, in an area other than a basement area is not considered a building's lowest floor. These areas must be designed in accordance with the definition of "elevated building" and Section 5.3.2. 2.1.28 Manufactured home: A structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, recreational vehicles, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property. 2.1.29 Manufactured home park or subdivision: A parcel, or contiguous parcels, of land divided into two or more manufactured home lots for rent or sale. 2.1.30 Mean sea level: For purposes of the National Flood Insurance Program, the North American Vertical Datum (NAVD) of 1988 or other datum, to which base flood elevations shown on a community's Flood Insurance Rate Map are referenced. 2.1.31 National Geodetic Vertical Datum (NGVD) as corrected in 1988: A vertical control used as a reference for establishing varying elevations within the floodplain. 2.1.32 New construction: Structures for which the "start of construction" commenced on or after June 19, 1980, the effective date of the floodplain management regulations, and includes any subsequent improvements to such structures. 2.1.334 New manufactured home park or subdivision: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after June 19, 1980, the effective date of the floodplain management regulations adopted by the community. 2.1.34 Recreational vehicle: A vehicle, which is a building on a chassis, is 400 square feet or less when measured at the largest horizontal projection, is designed to be self-propelled or permanently towable by a light duty truck, and which is not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel or seasonal use. 2.1.35 Sand dunes: Naturally occurring accumulations of sand in ridges or mounds landward of the beach. 2.1.36 Start of construction, [for other than new construction or substantial improvements under the Coastal Barrier Resources Act (PL 97-348)], includes substantial improvement: The date the building permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. the actual start means the first placement of permanent construction of a structure (including a manufactured home) on a site, such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the state of excavation or placement of a manufactured home on a foundation. permanent construction does not include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds, not occupied as dwelling units or not part of the main structure. for a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. 2.1.37 Structure: a walled and roofed building that is principally above ground, a manufactured home, a gas or liquid storage tank, or other man-made facilities or infrastructures. 2.1.38 Substantial damage: Damage of any origin sustained by a structure whereby the cost of restoring the structure to its pre-damaged condition would equal or exceed fifty percent (50%) of the value of the structure immediately before the damage occurred as appraised by the City of New Haven Assessor's Office. "Substantial damage" also means flood-related damages sustained by a structure on two separate occasions during a 10- year period for which the cost of repairs at the time of each such flood event, on the average, equals or exceeds 25 percent of the value of the structure immediately before the damaged occurred as appraised by the City of New Haven's Assessors Office. 2.1.39 Substantial improvement: Any combination of repairs, reconstruction, alteration, or improvements to a structure taking place over a ten-year period in which the cumulative cost equals or exceeds fifty percent (50%) of the value of the structure before the "start of construction" of the improvement as appraised by the City of New Haven's Assessors Office. This term includes structures that have incurred "substantial damage", regardless of the actual repair work performed. For the purposes of this definition, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions. 2.1.40 Variance: A grant of relief from the requirements of this ordinance which permits construction in a manner otherwise prohibited by this ordinance where specific enforcement would result in unnecessary hardship. Such hardship shall be based on the unusual physical characteristics of the property in question which are not shared by adjacent parcels; hardship shall not be based on the structure, or on economic or personal hardships. 2.1.41 Violation: Failure of a structure or other development to be fully compliant with the City's Flood Damage Prevention Ordinance. A structure or other development without required permits, lowest floor elevation documentation, flood-proofing certificates or required floodway encroachment calculations is presumed to be in violation until such time as that documentation is provided. 2.1.42 Water Surface Elevation: The height, in relation to the North American Vertical Datum (NAVD) of 1988, (or other datum, where specified) of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

(Ord. No. 1980, 9-6-23; Ord. No. 2024-0022, 10-21-24)

Ask a question about New Haven law

Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.