4.3. - Permit procedures.
Prior to any development activities in the Flood Damage Prevention District, application for a Floodplain Development Permit shall be made on forms furnished by the City of New Haven. Such application shall be accompanied by two sets of plans drawn to scale showing, at a minimum, the property lines and location of the parcel, existing and proposed contours; existing or proposed structures, fill, storage of materials, drainage facilities and the location of the foregoing. The following information shall also be submitted to the Building Inspector. 4.3.1 Application Stage. 4.3.1.1 Elevation in relation to mean sea level of the proposed lowest floor (including basement) of all structures (Sections 5.1.1 and 5.3.2); 4.3.1.3 Description of the extent to which any watercourse will be altered or relocated as a result of proposed development; • 4.3.1.4 A statement as to whether or not the proposed alterations to an existing structure meet the criteria of the substantial improvement definition (Section 2.1.39); 4.3.1.5 A statement as to whether there will be dry access to the structure during the 100-year storm event; 4.3.1.7 Certification as to the provisions of Section 5.3.2 governing fully-enclosed areas below base flood elevation, if the minimum design criteria in Section 5.3.2.1 - 5.3.2.3 is not used; 4.3.1.8 Certification as to floodway heights, as required by Section 5.2.1 and 5.3.3; 4.3.1.9 Certification as to breakaway walls. If the design criteria stated in subsection 5.3.5.7 is not utilized then the design and construction methods must be certified as explained in subsection 5.3.5.7.1 and 5.3.5.7.2; 4.3.1.10 Certification as to the structural anchoring provisions of subsection 5.3.5.3 and 5.3.5.6 4.3.2 Construction Stage. Upon completion of the applicable portion of construction the applicant shall provide the Building Inspector with an elevation certificate prepared by a Connecticut licensed land surveyor, engineer or architect verifying the as-built lowest floor elevation, defined as the top of the lowest floor (including basement) in A zones (Sections 5.3.1.1 and 5.3.1.2.1); defined as the lowest point of the lowest structural horizontal member (excluding pilings or columns) in Coastal V zones and Coastal A zones. (Section 5.3.4.2) 4.3.3 Compliance. Deficiencies in the lowest floor elevations shall be corrected by the permit holder immediately and prior to further progressive work being performed to proceed. Failure to submit an acceptable survey or failure to make corrections required hereby shall be cause for issuance of a stop-work order.
(Ord. No. 1980, 9-6-23; Ord. No. 2024-0022, 10-21-24)
Ask a question about New Haven law
Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.