§ 425.2.2.2.4 — Replacement of Mechanical Equipment

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code, App. A, ch. I, § 425.2.2.2.4

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/1dde9ad6-945c-48cc-a9d2-b3ac91e14895

425.2.2.2.4. - Replacement of Mechanical Equipment.

Existing equipment within a parking structure mentioned in Section 425 that is replaced shall comply with sound transmission requirements, which prohibits noise from air conditioning, refrigeration, heating, pumps, generators, and filtering equipment from exceeding the ambient noise level to other adjacent properties. In some cases, the project will be reviewed for approval using the Acoustical Analysis Report findings, design information and Section 425.1. New permits for HVAC equipment in or adjacent to other buildings or structures shall be issued only where the sound rating of the proposed equipment does not exceed dBA value in Table 425.1.

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.