425.4. - INSPECTION PROCESS.
The following information should be to the building inspector during the construction or replacement of the noise: 1. Statement of conformance and commissioning to Section 425 by the design professional indicating the installation is certified to meet the dB(A) of Table 425.1 and the performance is installation conforms to the design documents. [Section 501.3.1.2 is amended to read as follows:] [B]501.3.1.2 Exterior Sound Transmission. "Noise-sensitive" uses, such as residential developments, hotels, hospitals, and schools must be protected from new S-2 occupancy group development that causes discernable increases in noise levels because of new equipment associated with the new construction. Noise from exhaust fans, emergency generators associated with a new building must be mitigated through physical measures or operational limits using nationally recognized standards for equipment sound transmission. Exterior sound transmission serving buildings or structures shall be installed in accordance with Section 425 of the International Building Code as amended by the City of Atlanta. [Section 506 is amended to read as follows:]
(Ord. No. 2018-58(18-O-1659), § 1, 11-28-18) (Ord. No. 2018-58(18-O-1659), § 2, 11-28-18)
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.