§ 425.2.6 — COMMISSIONING
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code, App. A, ch. I, § 425.2.6
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/4fbc62ef-54d6-4db3-ac86-856f55d62e1c
425.2.6. - COMMISSIONING.
Where application is made for construction permit as described in this section, the registered design professional of record shall perform commissioning during construction and after occupancy as required by Table 425.2.6 The registered design professional of record and engineers of record involved in the design of the project permitted is able to act as the commissioning approving agency provided those personnel meet the qualification requirements of this section in compliance with Section 425. The registered design professional shall provide written documentation to the Chief Building Official or designee demonstrating competence and relevant experience or training. Table 425.2.6 Commissioning Plan Requiring Verification | Preoccupancy | Post-Occupancy | Method | Occurrence | Reference Preoccupancy | Post-Occupancy Sound Transmission Mechanical and emergency generator equipment | X | None | Field testing and verification | See Section 425.2.3 | None | 425.2.3 HVAC background sound | X | None | Field testing and verification | See Section 425.2.4 | None | 425.2.3
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.