§ 6.11.07 — Storm Water Detention Facilities

Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 6, § 6.11.07

Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/c5b8f190-2b47-4a1d-b281-a837e779c764

6.11.07 - Storm Water Detention Facilities

A. Each project shall provide stormwater controls such that predevelopment peak flow rates are maintained, unless otherwise approved by Division Manager of Stormwater Management or his/her designee B. Storms with a statistical rate of return of two (2), five (5), ten (10), twenty-five (25), fifty (50), and one hundred (100) years shall be evaluated and controls created to attenuate peak flows. C. Responsibility for calibration and application of the empirical equations rests with the design engineer. D. Times of concentrations of less than ten (10) minutes for existing/undeveloped conditions are not acceptable for design nor are runoff percentages CN's higher than fifty-five (55) for on-site area, without supporting documentation acceptable to the City of Kennesaw Stormwater Management Division. E. Hydrologic calculations must employ an engineering methodology currently recognized and accepted within the industry. This methodology must include a hydrograph routing analysis, which generates an inflow hydrograph to the detention pond to create an outflow hydrograph. Multiple inflow hydrographs shall be combined on a real time basis. Multiple outflow hydrographs shall be combined on a real time basis. Multiple detention ponds in series must be routed from one to the next and so on throughout. F. A hydrograph routing analysis shall be submitted for all proposed areas drainage structures, which intercept more than three hundred twenty (320) acres (one-half (½) square mile). G. Where existing developed sites are changed, only those portions of the site, which are unchanged, are "grandfathered" as existing conditions for allowable runoff calculations. That is, impervious areas will be grandfathered as "existing conditions" in only those areas that are not changed, modified, or improved and constitute less than forty percent (40%) of the total impervious area. The calculated allowable flow from all areas razed and reformed must be considered in the undeveloped condition.

(Ord. No. 2012-03, 5-7-12)

Ask a question about Kennesaw law

Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.