For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6.15.02 — General Criteria

Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 6, § 6.15.02

Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/7861eae7-39f9-4434-b7fa-ba2ac6512543

6.15.02 - General Criteria

A. City of Kennesaw Dam Regulations shall apply to all new, rebuilt, or modified storm water impoundments, including appurtenant works, with the exception of: 1. Any Category I Dam requiring permitting under the control of the Georgia Safe Dams Program; 2. Any dam owned and operated by any department or agency of the United States Government; 3. Any newly constructed dam financially assisted by the United States Natural Resource Conservation Service or any other department or agency of the United States Government when such department or agency designed or approved plans and supervised construction and maintains a regular program of inspection of the dam; 4. Any dam licensed by the Federal Energy Regulatory Commission or for which a license application is pending with the Federal Energy Regulatory Commission; and 5. Any dam currently constructed and operating is hereby grandfathered in its present state with the owner assuming all rights, responsibilities, and liabilities thereof. Any existing dam that is modified, other than for maintenance activities, becomes subject to these requirements. B. All new dams of 25 vertical feet in height (or greater), impoundments containing a maximum storage volume of at least 100 acre-feet, or dams which have been ruled Category II by the Safe Dams Program shall be designed and constructed according to Category I Spillway Standards, as promulgated by the Safe Dams Program under the direction of a Georgia Licensed Civil Engineer and a Georgia Licensed Geotechnical Engineer, both experienced in the design and construction of dams. All dam heights will be measured from the streambed at the downstream toe to the top of dam. C. Prior to construction of any dam over 15 vertical feet or any dam impounding more than 50 acre-feet, the contractor shall provide the City sufficient documentation of his/her qualifications to construct dams. D. A pre-design meeting shall be held with representatives of the plan review committee, to review any proposed dam or proposed dam changes for any dam over 15 vertical feet or impounding more than 50 acre-feet. E. Depending on the level of downstream risk and size of impoundment, the City may require a dam breach analysis to be submitted for any proposed or existing dam impacting a proposed development, utilizing the National Weather Service's DAMBREAK Program or other methodology approved by the Georgia Safe Dams Program. A DAMBRK analysis will be required for all Category I and II dams. When a dam breach analysis is required by Cobb County, as a minimum a sunny day dam breach analysis shall be performed under full pool conditions. F. Guidelines are available from the State of Georgia Safe Dams Program (EPD) to assist the design/construction professional. Dam design documents shall include, but not be limited to: 1. Technical specifications; 2. Hydrology/hydraulic report; 3. Geotechnical report (with borrow study applicable); 4. Drainage basin map with land use and land improvement parameters; 5. Existing topography of site; a. Dam ;hg;= Plan view = Sections at all critical points = Details, complete 6. Names and professional seals of design civil engineer and geotechnical engineer with 24-hour contact; and 7. Designated contractor, if available. Because of the variables associated with selecting spillway(s), outlet device(s) or appurtenant structure(s) to suit a given site condition, the design consultant is responsible for the selection, subject to the review and approval of the plan review committee. The Committee will include in its consideration the ease of maintenance, longevity of the system, blockage potential, and practicality of operations. No orifice shall be less than 3 inches in diameter unless it is installed to meet a State or local requirement. All risers (standpipes) shall be equipped with a debris deflector (trash rack) and an anti-vortex device. To facilitate outlet operation, curved or inclined trash racks designed to allow debris to rise with the water level are preferred. In all cases, trash racks shall be either hinged or removable to facilitate maintenance operations. Corrugated metal pipe is not permitted for standpipes. Spillways: Every dam shall be provided with a principal spillway, fully capable of passing at least the 50-year flood, with excess spillway capacity provided by the emergency spillway(s) capable of handling excess flows up to the design storm. The principal spillway can be sized for floods of less magnitude than the 50-year flood only if the emergency spillway is appropriately armored against scour with concrete or other suitable lining as protection against more frequent usage. Principal Spillway: All spillways shall be analyzed (hydraulically rated) for both inlet and outlet control conditions using appropriate tail water ratings. If a control-box or weir-box is affixed, then the total system (inlet control box and outlet conduit) shall be hydraulically rated to determine the stage-discharge relationship. Emergency Spillway(s): For every type of water impounding facility, a planned safe flow path must be provided for conveyance of flows of water in an emergency. In many instances, this function can be provided through installation of an emergency spillway. Emergency spillways may be excavated open channels, either vegetated or paved with reinforced concrete, weir sections of concrete walls, or appropriately designed conduit. Any portion of an open channel spillway excavated into a dam embankment or other fill section must be paved with reinforced concrete equipped with appropriate seepage controls, under drainage, and cut-off walls. Any portion of any spillway excavated into undisturbed residual soil shall be vegetated in accordance with the practices described in the "Manual for Erosion and Sediment Control in Georgia" or protected against scour and erosion by other suitable measures if vegetation does not provide adequate stabilization. If the spillway is activated by storms smaller than the 50-year frequency, then vegetation alone will not be considered sufficient protection against scour according to these standards. A 12-foot combined drainage and permanent access easement shall be established around the pond at the 100-year pool level or at the elevation of top of dam, whichever is greater to provide access and permanently prevent usage or modification of this flood storage area. A 12-foot combined easement shall also be provided along the toe of the dam. A 20-foot access easement from the public right-of-way shall be provided. Emergency Draining of the Lake: Upon obtaining evidence which indicates that a potentially hazardous condition may exist, such as: • Excessive leakage transporting soil from the dam interior (i.e., piping); • Slope failure, excessive scouring, or other apparent soil instability; • Longitudinal cracks, bulging, or shifts in alignment; • Excessive sloughing or seepage; or • Failure of the spillways and/or outlet devices to function properly (due to cloggage, damage, or other deficiency). The Public Works Director has the authority to order the immediate and complete draining of the lake in whatever manner deemed necessary at the time and to require the owner to keep the pool down until remedial work, as is deemed most appropriate to create a safe dam condition, is completed and approved by the City. All lakes shall have a permanent lake drain. No public roadways shall be constructed over any permanent water impoundment structure. Private roadways and driveways over any permanent impoundment structure (including full indemnification to the County) shall be reviewed on a case-by-case basis by the Public Works Department (access for public safety vehicles must be addressed in said indemnification). No utilities are permitted to pass through any dam, either longitudinally or transversely, unless approved by the City.

Ask a question about Kennesaw law

Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.