§ 6.15.06 — Specific Criteria
Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 6, § 6.15.06
Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/2a274524-9dc4-47b4-b459-647e7f9d6eca
6.15.06 - Specific Criteria
Earthen Dam: Front slope shall not be steeper than 2.5:1 unless design includes a slope stability analysis, which confirms and documents that a steeper slope will be stable. In no condition, however, can any slope be steeper than 2:1. All organics and topsoil shall be removed from the entire footprint of the dam and the foundation inspected and approved by the geotechnical licensed, qualified engineer prior to fill placement. Earthen fill shall be CL or ML material approved for use by a geotechnical engineer (PE) and placed and compacted to not less than 95 percent Standard Proctor under said engineer's direction. Freeboard of a dam, above the 100-year design storm maximum pool, shall be 2.0 feet in lieu of fetch calculations of wave height justifying a lesser freeboard. Cobb County reserves the right to require additional freeboard above the nominal two feet requirement, if supported by fetch calculations. Crest width shall be not less than 12.0 feet, unless approved by the City of Kennesaw and Cobb County Storm Water Division. Reinforced Concrete or Masonry Dams: Design shall address and account for overturning, uplift, and seepage with adequate safety factor (2.0 for overturning, 1.5 for sliding) and adequate freeboard (0.5 feet above 100-year). Steel design shall conform to American Concrete Institute Code. Uplift loads can be reduced by 70 percent, if an under draining system is provided. Construction verification checklist must be provided by design engineer or approved alternate. All slab on grade concrete, including concrete footings, shall be designed and constructed to incorporate appropriate cutoff walls. In no condition can any fill slope (if any) be steeper than 2:1. All organics and topsoil shall be removed from the entire footprint of the dam and the foundation inspected and approved by the City prior to gravity dam concrete or masonry placement. Earthen fill (if required) shall be approved for use by a geotechnical engineer (PE) and placed and compacted to not less than 95 percent Standard Proctor under said engineer's direction. Freeboard of a dam, above the 100-year design storm maximum pool, shall be 2.0 feet along any earth fill sections of the dam, in lieu of fetch calculations of wave height justifying a lesser freeboard. City reserves the right to require additional freeboard above the nominal two feet requirement, if supported by fetch calculations. Freeboard for the concrete section of the dam shall be a minimum of 0.5 feet. Required 28 day compressive strength for concrete is 3000 psi.
Ask a question about Kennesaw law
Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.