For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6.20.02 — Utility Permit

Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 6, § 6.20.02

Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/9f293461-204f-4207-96f1-d8f84ab3df83

6.20.02 - Utility Permit

A. Utility Permit Required. It shall be unlawful for any Utility to excavate or to construct, install, maintain, renew, remove or relocate Facilities in, on, along, over or under the right-of-way of the City without a Utility Permit from the Public Works Department in accordance with the terms of this ordinance. B. Permit Procedure. Utility Permits shall be obtained from the Director of Public Works, or his/her designee upon application made on forms prescribed by the Public Works Department. The written application shall include the following: 1. The name and principal office address of the Utility; 2. The nature, extent, and location of any work proposed to be done, along with satisfactory plans as attachments showing in detail the location of the proposed Facility, Facilities, or operations as described in the application. The plans shall show the size or capacity of Facilities to be installed; their relationship to Street features such as right-of-way lines, pavement edge, structures, etc., horizontal and vertical clearance to critical elements of the roadway and any other information necessary to evaluate the impact on the Street and its operation; 3. The name and address of the person or firm who is to perform such work; 4. The name, street address, email address if applicable and telephone and facsimile numbers of one (1) or more Facilities Representative(s); 5. The projected dates for the work to be initiated and completed; 6. An indemnity bond or other acceptable security in an amount to be set by the City for damages incurred to any part of the City road system or other City property or to any city employee or member of the public caused by activity or work of the Utility performed under authority of the permit issued; 7. A copy, if requested, of the Registrant's certificate of authority (or other acceptable evidence of authority to operate) from the Georgia Public Service Commission and/or the FCC and any other similar approvals, permits, or agreements; 8. A copy, if requested and if applicable documentation (i.e. Resolution, Lease Right-of-Way Agreement) that authorizes the Utility to use or occupy the Right-of-way for the purpose described in the application; and 9. A copy, if applicable, of documentation demonstrating that the Utility has written permission from privately-owned utility pole or facility owners that are located in the Right-of-way to locate or co-locate Facilities thereon. C. Permit Fees. Fees shall be determined by the Director, subject to the approval by resolution of the Mayor and City Council. A fee schedule shall be available at the offices of the Director and the City Clerk and open for public inspection. D. Issuance of Permit. The Director may issue a Utility Permit if the Director determines the Utility has satisfied the following requirements: 1. Issuance of the Utility Permit is consistent with this ordinance and any other applicable local, state and federal regulation; 2. The Utility has submitted a complete Application and has secured all certificates and other authorizations required by law, if applicable, in order to construct Facilities in the manner proposed by the Utility; 3. The impacts on public safety, visual quality of the streets, traffic flow, and other users of the Right-of-way have been minimized giving due consideration to the scope, difficulty, duration, construction, and future maintenance of the project for which the Utility Permit is being issued; and 4. The placement of the Facilities under the Utility Permit complies with any applicable documentation authorizing the Utility to occupy the Right-of-Way (i.e. Resolution, Lease, Right-of-Way Agreement). E. Emergency Situations. 1. Each Utility shall, as soon as reasonably practicable, notify the Director of any event regarding its Facilities which is considered to be an Emergency. The Utility may proceed to take whatever actions are necessary in order to respond to the Emergency and abate the situation. A Utility who engages in an emergency response shall take all reasonable precautions to avoid and minimize damage to any existing Facilities. 2. In the event that the City becomes aware of an Emergency related to a Facility located in the Right-of-way, the City may take whatever action it deems necessary in order to respond to the Emergency, including, but not limited to, cutting or moving or removing any of the Facilities. The City shall not incur any liability to the Utility for taking such emergency action(s), and the cost of such action(s) taken by the City shall be paid by each Utility involved by the Emergency. F. Effective Period of Permit. 1. Each Utility Permit shall have a set commencement and expiration date based on information provided in the Utility's Permit application. 2. The Utility Permit shall remain in place until Construction is completed or until its expiration date unless the Utility is in default. The Director may give written notice of default to a Utility if it is determined that a Utility has: a. Violated any provision or requirement of the issuance or acceptance of a Utility Permit application or any law of the City, state, or federal government; b. Attempted to evade any provision or requirement of this ordinance; c. Engaged in any fraud or deceit in connection with the Application or the Utility Permit; d. Made a material misrepresentation or omission of fact in connection with the Application or the Utility Permit; e. Unused Facilities located in the Right-of-way. G. Termination for Cause. If a Utility fails to cure a default after notice is provided to the Utility by the City, then such default shall be a material breach and the City may exercise any remedies or rights it has at law or in equity to terminate the Utility Permit. If the Director decides there is cause or reason to terminate, the following procedure shall be followed: 1. The Director shall serve a Utility with a written notice of the reason or cause for proposed termination and shall allow a Utility a minimum of fifteen (15) business days to cure the breach. 2. If the Utility fails to cure within fifteen (15) business days, the Director may declare the Utility Permit terminated. H. Expiration of Utility Permit. If construction under the Utility Permit is not initiated within six (6) months of the date of issuance, the Utility Permit will automatically expire and shall be null and void without further action by the City. I. Indemnification. Any Utility obtaining a Utility Permit as provided in this ordinance agrees, as a condition of the issuance thereof, to indemnify and hold the City harmless against any claim of liability or loss from personal injury or property damage resulting from or arising out of the negligence or willful misconduct of the Utility, its employees, contractors, or agents, including accidents or occurrences arising out of such Utility's operations under the Utility Permit. In addition, the Utility must sign a statement affirming that it will indemnify and save harmless the City, its officers, agents and employees from all liability for accidents and damage (personal and property) caused by any of the work covered under the Utility Permit, that it will fill up and place in good and safe condition all excavations and openings made in the street, that it will replace and restore the pavement over any opening it may made as near as can be to the state and condition in which it found it and keep and maintain the same in such condition, normal wear and tear excepted, to the satisfaction of the City. J. Insurance. Any Utility obtaining a Utility Permit as provided in this ordinance shall obtain and carry insurance per Section 3.5 (as amended from time to time) of the State of Georgia Department of Transportation Utility Accommodation Manual relating to certification of insurance, policy provisions, coverage and any other insurance requirement under the Manual. K. Performance bond. The City reserves the right, pursuant to Section 3.5.F (as amended from time to time) of the State of Georgia Department of Transportation Utility Accommodation Manual, to require a performance bond, a letter of credit, or letter of escrow, as a condition of the Utility Permit.

(Ord. No. 2018-08, § 1, 4-2-18)

Ask a question about Kennesaw law

Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.