6.15.03 - Specific Criteria

(Dams with vertical heights less than or equal to 6 feet.) Earthen Dams: Any earth fill dam equal to or less than 6 feet in height is an exempt structure according to Georgia Safe Dams Act. The following minimum design criteria shall apply: Design shall be by a professional engineer registered and licensed to practice engineering in the State of Georgia; Plans shall be submitted to the City for review and comment; Construction shall be performed by a qualified contractor who has sufficient skills and experience to perform this work; Design storm shall be at least SCS 24-hour 100-year event or equivalent approved by the City; A minimum freeboard of two feet is required from the design flood pool to the top of the dam; All soil shall be CL or ML material, compacted to 95 percent standard proctor; and Side slopes shall be no steeper than 3:1 unless approved by the City. Under no circumstance shall the slope exceed 2:1. B. Reinforced concrete or masonry dam: 1. Design and construction supervision must be performed by a civil engineer licensed to practice in the State of Georgia. Construction verification checklist to be submitted to Public Works Director or his or her designee. 2. Design shall address and account for overturning, sliding uplift and seepage with adequate safety factor (2.0 for over-turning, 1.5 for sliding) and adequate freeboard (0.5 feet above 100-year pool). Steel design shall conform to American Concrete Institute Code. Uplift loads can be reduced by 70 percent, if an under draining system is provided. Construction verification checklist must be provided by design engineer or approved alternate. 3. Design storm shall be at least SCS twenty-four (24) hour one hundred (100) year event or equivalent approved by Public Works Director or his or her designee. (Dams with vertical heights between 6 and 25 feet with less than 100 acre-feet of storage) Earthen Dam: Design, construction supervision, and certification of completion according to plans and specifications to be by civil engineer and a geotechnical engineer both licensed to practice in the State of Georgia. Design shall conform to the requirements of a Category I Spillway Standards Dam as classified by the Georgia Safe Dams Office and as published in "Georgia Safe Dams Act and Rules for Dam Safety," Act No. 796, as amended to date. Design storm shall be at least 25 percent of the Probable Maximum Precipitation (6 hour) storm event. Principal spillway shall be adequate to handle at least the 50-year flood. Emergency spillway(s) as a minimum shall be adequate to handle flows in excess of the 50-year flood, up to the ¼ PMP. Front and back slopes shall not be steeper than 3:1 unless design includes a slope stability analysis, which confirms and documents that a steeper slope will be stable. In no condition, however, will a slope steeper than 2:1 be permitted. All organics and topsoil shall be removed from the entire footprint of the dam and the foundation certified by a geotechnical engineer (PE). Earthen fill shall be CL or ML material approved for use by geotechnical engineer (PE), placed, and compacted to not less than 95 percent standard proctor under said engineer's direction. Compaction records accompanied by a geotechnical engineer's certification that soil compaction meets this specification should be forwarded to the City. The low-level outlet (lake drain) shall be concrete pressure pipe or ductile iron pressure pipe, cradled in concrete. Bedding shall be in concrete poured the full width of the exposed trench and as a minimum, up to the spring line of the pipe. Pipe and joints shall be rated for internal pressures exceeding that of the design storm and shall meet or exceed ASTM 361 or AWWA C-301. Corrugated metal pipe is not allowed. A lake drain may also be comprised of a valve-operated siphon system designed by a registered civil engineer licensed in the State of Georgia. Piping for a siphon system shall be schedule 80 PVC in conformance with current state standards or ductile iron with mechanical joints or PV joints with adequate strength and anchoring to sustain the water forces incumbent with operation. Freeboard of a dam, above the design storm maximum pool, shall be 3.0 feet in lieu of fetch calculations of wave height justifying a lesser freeboard. The City reserves the right to require additional freeboard above the nominal 3-feet requirement, if supported by fetch calculations. Crest width shall be not less than 12.0 feet. Reinforced Concrete or Masonry Dam: Design, construction supervision, and certification of completion according to plans and specifications to be by design civil engineer and a geotechnical engineer both licensed to practice in the State of Georgia. Design shall address and account for overturning, uplift, and seepage with adequate safety factory and adequate freeboard. All slab on grade concrete, including concrete footings, shall be designed and constructed to control seepage and piping of foundation soil along the underside of the slab in incorporating cutoff walls or other appropriate measures. Design storm shall be as specified by the City of Kennesaw and Cobb County Storm Water Division. Generally, at least 25 percent of the Probable Maximum Precipitation 6-hour storm event (¼ PMP) is required. Principal spillway shall be adequate to handle at least the 50-year flood unless the emergency spillway is appropriately armored against scouring. Emergency spillway shall be adequate to handle flows in excess of the 50-year flood, up to the 6-hour PMP. Freeboard of a dam, above the design storm maximum pool, shall be 3.0 feet in lieu of fetch calculations of wave height justifying a lesser freeboard. Additional freeboard above the nominal 3 feet required, if supported by fetch calculations. Design shall conform to the requirements of a Category I Spillway Standards Dam as classified by the Georgia Safe Dams Office and as published in "Georgia Safe Dams Act and Rules for Dam Safety," Act No. 796, as amended to date. All organics and topsoil shall be removed from the entire footprint of the dam and the foundation certified by a geotechnical engineer (PE). Earthen fill (if any) shall be subject to the criteria specified above for earthen embankments. Required 28-day compressive strength for concrete is 3000 psi.

(Ord. No. 2012-03, 5-7-12)

Ask a question about Kennesaw law

Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.