6.18.03 - Easements
• Easements shall be cleaned and opened at the time of development to control surface water run-offs. Run-off slope and side slopes are to be specified by the developer's engineer, according to good engineering practice. • Permanent sanitary sewer easements of 20 feet in width shall be provided for necessary lines. • Buildings shall not be located closer than 10 feet from the edge of any permanent sanitary sewer easement without approval from the Public Works Division. • Easements for sanitary sewers and drainage purposes shall not overlap unless approved by the Public Works Division. • Drainage easements shall be provided where the project is traversed by a watercourse, drainage way, natural stream, or channel. Easements shall conform substantially to the limits of such watercourse plus any additional width as is necessary to accommodate future construction as recommended by the Storm Water Division. • Drainage easements within the project and off the dedicated street right-of-way shall be clearly defined on the final plat of the project. The owner of this property shall be required to keep the easement open and free of undue obstructions at all times. • All easements shall be cleared of debris, excess dirt, and other materials. The ground shall be smoothed down and grassed within 10 days of completing construction work. The use of sediment control measures may be required to protect the area until a vegetative cover is obtained.
Ask a question about Kennesaw law
Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.