§ 12.4.4 — Jurisdictional Wetland Determination
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 12.4.4
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/9a204502-2151-4a5a-83ab-157773064b89
12.4.4. - Jurisdictional Wetland Determination
If an area proposed for development is located within 50 feet of a wetland as shown on the National Wetlands Database, as determined by the Engineering Director, no Land Disturbance Permit or Building Permit for the area designated wetland or any area within 50 feet of the designated wetland may be issued until a jurisdictional wetland determination has been completed and either of the following occur: A. The U.S. Army Corps of Engineers determines that there are jurisdictional wetlands present on the proposed development site, a Section 404 permit is required, and either a Section 404 Permit or a letter of permission is issued by the Corps for the proposed development; or B. The U.S. Army Corps of Engineers determines that jurisdictional wetlands are not present on the proposed development site, and no Section 404 permit or letter of permission is required.
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
