§ 12.6.2 — Best Management Practices
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 12.6.2
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/4305e3ad-b83a-4e10-9d67-b50890032f19
12.6.2. - Best Management Practices
A. General Provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the Section and the NPDES general permit are not met. Therefore, plans for those land-disturbing activities which are not exempted by this Section must contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions must be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices must conform to the minimum requirements of paragraphs and C. below. The application of measures and practices must apply to all features of the site, including street and utility installation, drainage facilities and other temporary and permanent improvements. Measures must be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this Section and the NPDES general permit. B. Minimum Requirements for Erosion, Sedimentation and Pollution Control using Best Management Practices. 1. Best management practices as set forth in Sec. 12.6.2.B. and Sec. 12.6.2.C. shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices will constitute a complete defense to any action by the Engineering Director or to any other allegation of noncompliance with paragraph below or any substantially similar terms contained in a permit for the discharge of storm water issued pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act". As used in this paragraph, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. § 12-7-6(b). 2. A discharge of storm water runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained will constitute a separate violation of any land- disturbing permit issued by a local issuing authority or of any state general permit issued by the Environmental Protection Division pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act", for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than 10 nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters will be measured in accordance with guidelines to be issued by the Engineering Director. This paragraph does not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than 5 acres. 3. Failure to properly design, install or maintain best management practices will constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the Environmental Protection Division pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act", for each day on which such failure occurs. 4. The Director may require, in accordance with regulations adopted by the Board of Natural Resources, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur. 5. The LIA may set more stringent buffer requirements than stated in Sec. 12.6.2.C.15. and Sec. 12.6.2.C.16. in light of O.C.G.A. § 12-7-6(c). Stream buffer requirements are listed Sec. 12.2. C. General Design Principles. The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A. § 12-7-1 et seq. for the purpose of governing land-disturbing activities will require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following: 1. Stripping of vegetation, regrading and other development activities must be conducted in a manner so as to minimize erosion; 2. Cut-fill operations must be kept to a minimum; 3. Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential; 4. Whenever feasible, natural vegetation must be retained, protected and supplemented; 5. The disturbed area and the duration of exposure to erosive elements must be kept to a practicable minimum; 6. Disturbed soil must be stabilized as quickly as practicable; 7. Temporary vegetation or mulching must be employed to protect exposed critical areas during development; 8. Permanent vegetation and structural erosion control practices must be installed as soon as practicable; 9. To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et seq.; 10. Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills; 11. Cuts and fills may not endanger adjoining property; 12. Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners; 13. Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum; 14. Land-disturbing activity plans for erosion, sedimentation and pollution control must include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in Sec. 12.6.2.B.2.; 15. Except as provided in the Sec. 12.6.2.C. 16., there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the Director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the Director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow, unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to Part 6 of Article 5 , Chapter 5 of Title 12 , the Georgia Water Quality Control Act, will remain in force unless a variance is granted by the Director as provided in this paragraph. The following requirements must apply to any such buffer: a. No land-disturbing activities may be conducted within a buffer and a buffer must remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for their own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and b. The buffer does not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: i. Stream crossings for water lines; or ii. Stream crossings for sewer lines. 16. There is established a 50 foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as "trout streams" pursuant to Article 2 of Chapter 5 of Title 12 , the "Georgia Water Quality Control Act", except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25 foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the Board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The Director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer: a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed: provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and b. The buffer shall not apply to the following land- disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) Stream crossings for water lines; or (ii) Stream crossings for sewer lines. D. Steep Slopes. 1. Rezoning plans and development plans must conform to topography and soil type so as to create the lowest practical erosion potential. No rezoning application or development plan application may be considered on any slope in excess of 25% within 500 feet of any state waters or stream identified on the Water Resources Protection Map, latest version, without the submittal of a Steep Slope and Erodible Soils Evaluation. For purposes of this paragraph, "state waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams that based on a field evaluation do not have a discernible flow at the time of the evaluation. Field evaluations must not be made within 48 hours of any rainfall event of 0.10 inches or greater or within 7 days of any rainfall event of 0.5 inches or greater. The rainfall measurement must be based on the City rainfall gauge closest to the site. 2. This Section is in addition to other buffer requirements and does not exempt any project from any other requirements of the City. This Section also applies to filling activities that occur within 500 feet of a "state waters" or included streams, as defined here, when any part of that fill slope exceeds 25%. 3. This section does not apply to projects with a total site area of less than 1 acre. 4. A Steep Slopes and Erodible Soils Evaluation must consist of the following: a. A Steep Slope and Erodible Soils Evaluation must be conducted in accordance with the evaluation procedures and criteria specified here or a comparable method approved by the Engineering Director for sites containing or near to streams, wetlands, or other water bodies where: i. Slopes exceed 10% within 500 feet of a state water or included stream. ii. Soil erodibility K values exceed 0.24 within 500 feet of the streams, wetlands, or water bodies; or iii. The vegetative cover within 100 feet of the streams, wetlands, or water bodies is: bare soil; fallow land; crops; active pasture in poor or fair condition; orchard - tree farm in poor or fair condition; brush - weeds in poor condition; or woods in poor condition. Table 1: Evaluation Criteria for Steep Slopes and Erodible Soils Factor Scores | Low - 0 points | Medium - 5 points | High - 10 points Slope | Less than 10% | 10% and 20% | Over 20% Slope Length | Less than 50 feet | 50 to 200 feet | Greater than 200 Soil Erodibility (K) | Less than 0.24 | 0.24 to 0.32 | Greater than 0.32 Vegetative Cover | Undisturbed meadow; active pasture in good condition; orchard-tree farm or woods in good condition | Active pasture in fair condition: brush-weeds in fair condition; orchard-tree farm in fair condition; woods in fair condition | Bare soil, fallow land, crops; active pasture in poor condition; brush-weeds in poor condition; orchard-tree farm in poor condition; woods in poor condition Good condition: > 75% ground cover | Fair condition: 50% to 75% ground cover | Poor condition: < 50% ground Sediment Delivery (Distance from downslope limit of disturbance to outer edge of wetlands or top of streambank) | Not adjacent to watercourses or wetlands. (> 300' buffer) | Adjacent to watercourses or wetlands (100'—300' buffer) | Adjacent to watercourses or wetlands (< 100' buffer) b. The evaluation report must be submitted for review to the Engineering Director. This report must include, as a minimum, the following: i. A plan, at a scale not smaller than 1 inch equals 100 feet, that shows: ii. Existing topography with contour intervals no greater than 5 feet; iii. Mapped soils as shown in soil surveys; iv. Field delineated, marked and surveyed streams and wetlands; v. Existing vegetation; vi. Existing sub drainage areas of the site; and vii. Slopes in each sub drainage area segmented into sections of slopes less than or equal to 10%; 11% to 19%; and greater than or equal to 20%; viii. All slope analysis data forms; ix. A summary of findings including information pertinent to the evaluation of the site; and x. A mitigation plan that describes the proposed additional protective measures for those areas where development is allowed with restrictions. c. The site will be evaluated by assessing each segment of each subdrainage area using the evaluation criteria in Table 1. Each segment must be given a score for slope, slope length, soil erodibility, vegetative cover, and sediment delivery. A total score will be assigned for each segment. A segment of a sub drainage area with a total score of 35 or greater must be designated as part of the buffer and no development may be approved in that segment. A segment with a total score of 25 or 30 requires the application of additional protective measures as required by the Engineering Director; however, development is not prohibited and that area is not part of the buffer. A segment with a score of 20 or less may be developed with standard protective measures and that area is not required to be part of the buffer. E. Exemptions. No application for a Land Disturbance Permit may be approved for activity inconsistent with this section, unless: 1. The Engineering Director, after consulting with the Public Works Director, authorizes land disturbance for the construction of: a stream crossing by a drive-way, transportation route, or utility line parallel to a stream but not closer than 25 feet from a stream bank unless due to natural conditions in an area, such construction would be less harmful to the environment than if it were located outside the protection area; or 2. The Engineering Director with the approval of the Mayor and City Council finds and determines that the proposed work will not impair the quality, vitality and stability of the protection area and will not destroy more than a minimum amount of the riparian cover within the parcel; or 3. The Engineering Director with the approval of the Mayor and City Council authorizes redevelopment of a tract or parcel where an equivalent amount 4. of clearance and improvement are located; or, where the opinion of the Engineering Director, after consulting with the Public Works Director, is that the proposed work will not impair the quality, vitality and stability of the protection area; or 5. A structure is being repaired or rebuilt after being damaged by fire or other disaster and the Engineering Director determines that reasonable efforts to protect the adjacent stream have been taken; or 6. The Engineering Director with the approval of the Mayor and City Council grants a variance from the requirements of this Section because exceptional circumstances exist such that a strict adherence to the provisions of this article would result in unnecessary hardship and/or would not further the intent of the Article; or 7. The Engineering Director, after consulting with the Public Works Director, authorizes an exception to these rules to allow construction of a detention, retention or sediment control pond, facility or storm drainage structure within a required buffer, setback or protection area where it is deemed to be in the best interest of the water resources system. F. Nothing contained in O.C.G.A. § 12-7-1 et seq. prevents any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements Sec. 12.6.2.B. and C. G. The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another will neither constitute proof of nor create a presumption of a violation of the standards provided for in this Section or the terms of the permit.
(Ord. No. 2018-04-03, § 1, 4-23-2018)
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
