§ 12.5.1 — General Provisions
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 12.5.1
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/f42fc70f-570c-46fc-91e3-d2081ba103b7
12.5.1. - General Provisions
A. Purpose and Intent. The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-construction stormwater runoff and nonpoint source pollution associated with new development and redevelopment. Proper management of post- construction stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water and aquatic resources. Additionally, the City of Roswell is required to comply with several State and Federal laws, regulations and permits and the requirements of the Metropolitan North Georgia Water Planning District's regional water plan related to managing the water quantity, velocity, and quality of post- construction stormwater runoff. These stormwater management requirements seek to meet that purpose through the following objectives: 1. Establish decision-making processes surrounding land development activities that protect the integrity of the watershed and preserve the health of water resources; 2. Require that new development and redevelopment maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, streambank erosion, nonpoint source pollution and maintain the integrity of stream channels and aquatic habitats; 3. Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum post-development stormwater management standards; 4. Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of green space and other conservation areas, to the maximum extent practicable; 5. Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety; and 6. Establish administrative procedures for the submission, review, approval and disapproval of stormwater management plans, and for the inspection of approved active projects, and long-term follow up. B. Stormwater Design Manual. Adoption and Implementation of the Georgia Stormwater Management Manual; Conflicts and Inconsistencies. 1. In implementing this Article, the City of Roswell shall use and require compliance with all relevant design standards, calculations, formulas, methods, and other guidance from the Georgia Stormwater Management Manual (GSMM) as well as all related appendices. 2. This Article is not intended to modify or repeal any other Article, ordinance, rule, regulation or other provision of law, including but not limited to any applicable stream buffers under state and local laws, and the Georgia Safe Dams Act and Rules for Dam Safety. In the event of any conflict or inconsistency between any provision in the City of Roswell's municipal separate storm sewer systems (MS4) permit and this Article, the provision from the MS4 permit shall control. In the event of any conflict or inconsistency between any provision of this Article and the GSMM, the provision from this Article shall control. In the event of any other conflict or inconsistency between any provision of this Article and any other ordinance, rule, regulation or other provision of law, the provision that is more restrictive or imposes higher protective standards for human health or the environment shall control. 3. If any provision of this Article is invalidated by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of this Article. C. Designation of Administrator. The Environmental/Public Works Director, or their designee administers Sec. 12.5. D. Applicability Criteria for Stormwater Management Standards. This Article applies to the following activities: 1. New development that creates or adds 5.000 square feet or greater of new impervious surface area or that involves land disturbing activity of 1 acre of land or greater; 2. Redevelopment (excluding routine maintenance and exterior remodeling) that creates, adds, or replaces 5,000 square feet or greater of new impervious surface area or that involves land disturbing activity of 1 acre or more; 3. New development and redevelopment if a. such new development or redevelopment is part of a subdivision or other common plan of development, and b. the sum of all associated impervious surface area or land disturbing activities that are being developed as part of such subdivision or other common plan of development meets or exceeds the threshold in (1) and (2) above; 4. Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined in this Article; 5. Development or redevelopment that involves creation or replacement of between 1,000 square feet and 5,000 square feet of impervious cover must provide runoff reduction for new or replaced impervious area; and 6. Linear transportation projects that exceed the threshold in (1) or (2) above. E. Exemptions from Stormwater Management Standards. This Article does not apply to the following activities: 1. Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs; 2. Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement; 3. Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or environmental restoration; 4. Repairs to any stormwater management system deemed necessary by the administrator; 5. Agricultural practices as described O.C.G.A. 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in Sec. 12.5.1.D.; 6. Silvicultural land management activities as described O.C.G.A. 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in Sec. 12.5.1.D.; 7. Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or exits; 8. Existing driveway removal and replacement in kind; and 9. Linear transportation projects being constructed by City of Roswell to the extent the administrator determines that the stormwater management standards may be infeasible to apply, all or in part, for any portion of the linear transportation project. For this exemption to apply, an infeasibility report that is compliant with the City of Roswell linear feasibility program shall first be submitted to the administrator that contains adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator.
(Ord. No. 2020-06-07, § 1, 6-8-2020; Ord. No. 2024-02-04, 2-26-2024)
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
