§ 12.5.2 — Permit Procedures

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 12.5.2

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/a360dbbd-b48f-4807-94bb-a97011ea256d

12.5.2. - Permit Procedures

A. Stormwater Management Standards. Subject to the applicability criteria in Sec. 12.5.1.D. and exemptions in Sec. 12.5.1.E., the following stormwater management standards apply. Additional details for each standard can be found in the GSMM Section 2.2.2.2: 1. Design of Stormwater Management System: The design of the stormwater management system shall be in accordance with the applicable sections of the GSMM as directed by the administrator. Any design which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable. 2. Natural Resources Inventory: Site reconnaissance and surveying techniques shall be used to complete a thorough assessment of existing natural resources, both terrestrial and aquatic, found on the site. Resources to be identified, mapped, and shown on the Stormwater Management Plan, shall include, at a minimum (as applicable): a. Topography (minimum of 2-foot contours) and Steep Slopes (i.e., Areas with Slopes Greater Than 15%), b. Natural Drainage Divides and Patterns, c. Natural Drainage Features (e.g., swales, basins, depressional areas), d. Natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers, drinking water wellhead protection areas and river corridors, e. Predominant soils (including erodible soils and karst areas), and f. Existing predominant vegetation including trees, high quality habitat and other existing vegetation. 3. Better Site Design Practices for Stormwater Management: Stormwater management plans shall preserve the natural drainage and natural treatment systems and reduce the generation of additional stormwater runoff and pollutants to the maximum extent practicable. Additional details can be found in the GSMM Section 2.3. 4. Stormwater Runoff Quality/Reduction: Stormwater Runoff Quality/Reduction shall be provided by using the following: a. The applicant shall provide (A) Runoff Reduction and additional water quality shall not be required. To the extent (A) Runoff Reduction has been determined to be infeasible for all or a portion of the site using the Practicability Policy, then (B) Water Quality shall apply for the remaining runoff from a 1.2 inch rainfall event and must be treated to remove at least 80% of the calculated average annual post-development total suspended solids (TSS) load or equivalent as defined in the GSMM. i. Runoff Reduction - The stormwater management system shall be designed to retain the first 1.0 inch of rainfall on the site using runoff reduction methods, to the maximum extent practicable. ii. Water Quality - The stormwater management system shall be designed to remove at least 80% of the calculated average annual post-development total suspended solids (TSS) load or equivalent as defined in the GSMM for runoff from a 1.2 inch rainfall event. b. If a site is determined to be a hotspot as detailed in Sec. 12.5.1.D., the City of Roswell may require the use of specific or additional components for the stormwater management system to address pollutants of concern generated by that site. 5. Stream Channel Protection: Stream channel protection shall be provided by using all of the following three approaches: a. 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event; b. Erosion prevention measures, such as energy dissipation and velocity control; and c. Preservation of any applicable stream buffer. 6. Overbank Flood Protection: Downstream overbank flood protection shall be provided by controlling the post-development peak discharge rate to the pre-development rate for the 1- year, 2-year, 5-year, 10-year, and 25-year, 24-hour storm event. 7. Extreme Flood Protection: Extreme flood protection shall be provided by controlling the 100-year, 24-hour storm event such that flooding is not exacerbated. 8. Downstream Analysis: Due to peak flow timing and runoff volume effects, some structural components of the stormwater management system fail to reduce discharge peaks to pre-development levels downstream from the site. A downstream peak flow analysis shall be provided to the point in the watershed downstream of the site or the stormwater management system where the area of the site comprises 10% of the total drainage area in accordance with Section 3.1.9 of the GSMM. This is to help ensure that there are minimal downstream impacts from development on the site. The downstream analysis may result in the need to resize structural components of the stormwater management system. 9. The stormwater management plan for each land development project must provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site, regional, or shared stormwater facility. The off-site, regional, or shared facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site, regional, or shared stormwater facility. In addition, on-site measures must be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility. Approval of an offsite or shared stormwater facility shall be subject to the approval of the Environmental/Public Works Department Director or their designee. Proposed Shared Stormwater Facilities must meet the requirements as outlined in the City's Shared Stormwater Facility - Policy and Procedure (November, 23, 2015). Credits may be available for purchase by developers to partially or fully meet site stormwater requirements exclusively from City approved Shared Stormwater Projects. 10. Stormwater Management System Inspection and Maintenance: The components of the stormwater management system including all drainage facilities, best management practices, credited conservation spaces, and conveyance systems, shall have an inspection and maintenance agreement to ensure that they continue to function as designed. All new development and redevelopment sites are to prepare a comprehensive inspection and maintenance agreement for the on-site stormwater management system. This plan shall be written in accordance with the requirements in Sec. 12.5.4.B. B. Pre-Submittal Consultation, Stormwater Concept Plan, and Stormwater Management Plan Requirements. 1. Before a land development permit application is submitted, an applicant may request a pre-submittal consultation with the City of Roswell. The pre-submittal consultation should take place based on an early step in the development process such as before site analysis and inventory (GSMM Section 2.4.2.4) or the stormwater concept plan (GSMM Section 2.4.2.5). The purpose of the pre-submittal consultation is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering. To the extent applicable, local and regional watershed plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal consultation. Applicants must request a pre-submittal consultation with the City of Roswell when applying for a Determination of Infeasibility through the Practicability Policy. 2. The stormwater concept plan shall be prepared using the minimum following steps: a. Develop the site layout using better site design techniques, as applicable (GSMM Section 2.3). b. Calculate preliminary estimates of the unified stormwater sizing criteria requirements for stormwater runoff quality/reduction, channel protection, overbank flooding protection and extreme flood protection (GSMM Section 2.2). c. Perform screening and preliminary selection of appropriate best management practices and identification of potential siting locations (GSMM Section 4.1). 3. The stormwater concept plan shall contain: a. Common address and legal description of the site, b. Vicinity map, and c. Existing conditions and proposed site layout mapping and plans (recommended scale of 1" = 50'). which illustrate at a minimum: i. Existing and proposed topography (minimum of 2-foot contours), ii. Perennial and intermittent streams, iii. Mapping of predominant soils from USDA soil surveys, iv. Boundaries of existing predominant vegetation and proposed limits of clearing and grading, v. Location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.), vi. Location of existing and proposed roads, buildings, parking areas and other impervious surfaces, vii. Existing and proposed utilities (e.g., water, sewer, gas, electric) and easements, viii. Preliminary estimates of unified stormwater sizing criteria requirements, ix. Preliminary selection and location, size, and limits of disturbance of proposed BMPs. x. Location of existing and proposed conveyance systems such as grass channels, swales, and storm drains, xi. Flow paths, xii. Location of the boundaries of the base flood floodplain, future-conditions floodplain, and the floodway (as applicable) and relationship of site to upstream and downstream properties and drainage, and xiii. Preliminary location and dimensions of proposed channel modifications, such as bridge or culvert crossings. 4. The stormwater management plan shall contain the items listed in this part and be prepared under the direct supervisory control of either a registered Professional Engineer or a registered Landscape Architect licensed in the state of Georgia. Items (c), (d), (e), and (f) shall be sealed and signed by a registered Professional Engineer licensed in the state of Georgia. The overall site plan must be stamped by a design professional licensed in the State of Georgia for such purpose. (GSMM Section 2.4.2.7) a. Natural Resources Inventory b. Stormwater Concept Plan c. Existing Conditions Hydrologic Analysis d. Post-Development Hydrologic Analysis e. Stormwater Management System f. Downstream Analysis g. Erosion and Sedimentation Control Plan h. BMP Landscaping Plan i. Inspection and Maintenance Agreement j. Evidence of Acquisition of Applicable Local and Non-Local Permits k. Determination of Infeasibility (if applicable) 5. For redevelopment and to the extent existing stormwater management structures are being used to meet stormwater management standards the following must also be included in the stormwater management plan for existing stormwater management structures a. As-built Drawings b. Hydrology Reports c. Current inspection of existing stormwater management structures with deficiencies noted d. BMP Landscaping Plans C. Application Fee. The fee for review of any land development application shall be based on the fee structure established by the City of Roswell, and payment shall be made before the issuance of any land disturbance permit or building permit for the development. D. Application Procedures. Land development applications are handled as part of the process to obtain the land disturbance permit pursuant to Sec. 13.8 or building permit [Sec 13.4], as applicable. Before any person begins development on a site, the owner of the site shall first obtain approval in accordance with the following procedure: 1. File a land development application with the City of Roswell on the City of Roswell's form of application along the following supporting materials: a. the stormwater management plan prepared in accordance with Sec. 12.5.2.B., b. a certification that the development will be performed in accordance with the stormwater management plan once approved, c. a Preliminary Determination of Infeasibility, as applicable, and d. an acknowledgement that applicant has reviewed the City of Roswell's form of inspection and maintenance agreement and that applicant agrees to sign and record such inspection and maintenance agreement before the final inspection. 2. The administrator shall inform the applicant whether the application and supporting materials are approved or disapproved. 3. If the application or supporting materials are disapproved, the administrator shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same for the administrator to again consider and either approve or disapprove. 4. If the application and supporting materials are approved, the City of Roswell may issue the associated land disturbance permit or building permit, provided all other legal requirements for the issuance of such permits have been met. The stormwater management plan included in such applications becomes the approved stormwater management plan. E. Compliance with the Approved Stormwater Management Plan. All development shall be: 1. consistent with the approved stormwater management plan and all applicable land disturbance and building permits, and 2. conducted only within the area specified in the approved stormwater management plan. No changes may be made to an approved stormwater management plan without review and advanced written approval by the administrator.

(Ord. No. 2020-06-07, § 1, 6-8-2020; Ord. No. 2024-02-04, 2-26-2024)