§ 12.5.3 — Construction Inspections
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 12.5.3
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/cee3e551-725d-43de-bae1-f61138d73dcc
12.5.3. - Construction Inspections
A. Inspections to Ensure Plan Compliance During Construction. Periodic inspections of the stormwater management system during construction shall be conducted by the staff of the City of Roswell or conducted and certified by a professional engineer who has been approved by the City of Roswell. Inspections shall use the approved stormwater management plan for establishing compliance. All inspections shall be documented with written reports that contain the following information: 1. The date and location of the inspection; 2. Whether the stormwater management system is in compliance with the approved stormwater management plan; 3. Variations from the approved stormwater management plan; and 4. Any other variations or violations of the conditions of the approved stormwater management plan. B. Final Inspection; As-Built Drawings; Delivery of Inspection and Maintenance Agreement. Upon completion of the development, the applicant is responsible for: 1. Certifying that the stormwater management system is functioning properly and was constructed in conformance with the approved stormwater management plan and associated hydrologic analysis, 2. Submitting as-built drawings showing the final design specifications for all components of the stormwater management system as certified by a professional engineer, 3. Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan, and 4. Delivering to City of Roswell a signed inspection and maintenance agreement that has been recorded by the owner in the property record for all parcel(s) that make up the site. The required certification under part (1) shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and built according to the design specifications in the approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the City of Roswell with the request for a final inspection. The City of Roswell Environmental/Public Works staff shall perform a final inspection with applicant to confirm applicant has fulfilled these responsibilities. C. Violations and Enforcement. Any violation of the approved stormwater management plan during construction, failure to submit as-built drawings, failure to submit a final BMP landscaping plan, or failure of the final inspection shall constitute and be addressed as violations of, or failures to comply with, the underlying land disturbance permit pursuant to Sec. 13.14. To address a violation of this Article, the City of Roswell shall have all the powers and remedies that are available to it for other violations of building and land disturbance permits, including without limitation the right to issue notices and orders to ensure compliance, stop work orders, and penalties as set forth in the applicable ordinances for such permits.
(Ord. No. 2020-06-07, § 1, 6-8-2020; Ord. No. 2024-02-04, 2-26-2024)
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.