12.7.5. - Flood Damage Reduction

A. General Standards. In all Areas of Special Flood Hazard or Areas of Future-conditions Flood Hazard the following provisions apply: 1. New construction and substantial improvements of structures (residential or nonresidential), including manufactured homes, is not allowed within the limits of the future-conditions floodplain, unless all requirements of Sec. 12.7.5.C., D. and E. have been met; 2. New construction and substantial improvements must be anchored to prevent flotation, collapse and lateral movement of the structure; 3. New construction and substantial improvements must be constructed with materials and utility equipment resistant to flood damage; 4. New construction and substantial improvements must be constructed by methods and practices that minimize flood damage; 5. Elevated Buildings. All new construction and substantial improvements that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls must be designed so as to be an unfinished or flood resistant enclosure. The enclosure must be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of flood water. a. Designs for complying with this requirement must either be certified by a licensed professional engineer or architect to meet or exceed the following minimum criteria: i. Provide a minimum of 2 openings having a total net area of not less than 1 square inch for every square foot of enclosed area subject to flooding; ii. The bottom of all openings must be no higher than 1 foot above grade; and iii. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions. b. So as not to violate the "lowest floor" criteria of this ordinance, the unfinished and flood resistant enclosure must solely be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and c. The interior portion of the enclosed area must not be finished or partitioned into separate rooms. 6. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities must be designed and/or located 3 feet above the base flood elevation or 1 foot above the future-conditions flood elevation, whichever is higher, so as to prevent water from entering or accumulating within the components during conditions of flooding; 7. Manufactured homes must be anchored to prevent flotation, collapse, and lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard is in addition to and consistent with applicable state requirements for resisting wind forces; 8. All proposed development shall include adequate drainage and stormwater management facilities per the requirement of the City of Roswell to reduce exposure to flood hazards. 9. New and replacement water supply systems must be designed to minimize or eliminate infiltration of flood waters into the system; 10. New and replacement sanitary sewage systems must be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters; 11. On-site waste disposal systems must be located and constructed to avoid impairment to, or contamination from , such systems during flooding; 12. Other public utilities such as gas and electric systems shall be located and constructed to avoid impairment to them, or public safety hazards from them during flooding; 13. Any alteration, repair, reconstruction or improvement to a structure that is not compliant with the provisions of this ordinance, must be undertaken only if the nonconformity is not furthered, extended or replaced; 14. If the proposed development is located in multiple flood zones, or multiple base flood elevations cross the proposed site, the higher or more restrictive base flood elevation or future condition elevation and development standards takes precedence; 15. When only a portion of a proposed structure is located within a flood zone or the future conditions floodplain, the entire structure shall meet the requirements of this ordinance; and 16. Subdivision proposals and other proposed new development, including manufactured home parks or subdivisions, shall be reasonably safe from flooding: a. All such proposals shall be consistent with the need to minimize flood damage within the flood-prone area; b. All public utilities and facilities, such as sewer, gas, electrical, and water systems shall be located and constructed to minimize or eliminate flood damage; and c. Adequate drainage shall be provided to reduce exposure to flood hazards. B. Structures and Buildings within the Future-Conditions Floodplain. The following provisions, in addition to Sec. 12.7.5.A., apply: 1. Residential Buildings. a. New Construction. New construction of principal residential structures is not allowed within the limits of the future-conditions floodplain unless all requirements of Sec. 12.7.4.C., D. and E. have been met. If all of the requirements of Sec. 12.7.4.C., D. and E. have been met, all new construction must have the lowest floor, including basement, elevated no lower than 3 feet above the base flood elevation or 1 foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls must be provided in accordance with standards of Sec. 12.7.5.A.5. b. Substantial improvements. Substantial improvement of any principal residential structure must have the lowest floor, including basement, elevated no lower than 3 feet above the base flood elevation or 1 foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls must be provided in accordance with standards of Sec. 12.7.5.A.5. 2. Nonresidential Buildings. a. New Construction. New construction of principal nonresidential structures is not allowed within the limits of the future-conditions floodplain unless all requirements of Sec. 12.7.4.C., D. and E. have been met. If all of the requirements of Sec. 12.7.4.C., D. and E. have been met, all new construction shall have the lowest floor, including basement, elevated no lower than 1 foot above the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Sec. 12.7.5.A.5.a. New construction that has met all of the requirements of Sec. 12.7.4.C., D. and E. may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to 1 foot above the base flood elevation, or at least as high as the future- conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect must certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and must provide certification to the Floodplain Ordinance Administrator using the FEMA Floodproofing Certificate along with the design and operation/maintenance plan. b. Substantial Improvements. Substantial improvement of any principal nonresidential structure located in A1-30, AE, or AH zones, may be authorized by the Floodplain Ordinance Administrator to be elevated or floodproofed. Substantial improvements shall have the lowest floor, including basement, elevated no lower than 1 foot above the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Sec. 12.7.5.A.5.a. Substantial improvements may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to 1 foot above the base flood elevation, or at least as high as the future-conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect must certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and must provide certification to the Floodplain Ordinance Administrator using the FEMA Floodproofing Certificate along with the design and operation/maintenance plan. c. Accessory Structures and Facilities. Accessory structures and facilities (i.e., barns, sheds, gazebos, detached garages, recreational facilities and other similar non-habitable structures and facilities) which meet the requirements of Sec. 12.7.4.C., D. and E and are permitted to be located within the limits of the future-conditions floodplain must be constructed of flood-resistant materials and designed to provide adequate flood openings in accordance with Sec. 12.7.5.A.5. and be anchored to prevent flotation, collapse and lateral movement of the structure. 3. Recreational Vehicles. All recreational vehicles placed on sites must either: a. Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or b. Meet all the requirements for residential buildings—Substantial Improvements (Sec. 12.7.5.B.1.b.) including the anchoring and elevation requirements. 4. Manufactured Homes. a. New manufactured homes are not allowed to be placed within the limits of the future-conditions floodplain unless all requirements of Sec. 12.7.4.C., D. and E have been met. If all of the requirements of Sec. 12.7.4.C., D. and E have been met, all new construction and substantial improvement shall have the lowest floor, including basement, elevated no lower than 3 feet above the base flood elevation or 1 foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Sec. 12.7.5.B.1.b. b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision must be elevated so the lowest floor of the manufactured home is elevated no lower than 3 feet above the level of the base flood elevation, or 1 foot above the future-conditions flood elevation, whichever is higher. c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement in accordance with standards of Sec. 12.7.5.A.7. C. Structures and Buildings Adjacent to the Future-Conditions Floodplain. 1. Residential Buildings. For new construction and substantial improvement of any principal residential building or manufactured home, the elevation of the lowest floor, including basement and access to the building, must be at least 3 feet above the base flood elevation or 1 foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Sec. 12.7.5.A.5. 2. Nonresidential Buildings. For new construction and substantial improvement of any principal nonresidential building, the elevation of the lowest floor, including basement and access to the building, must be at least 1 foot above the level of the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Sec. 12.7.5.A.5. Nonresidential buildings may be floodproofed in lieu of elevation. D. Residential Single-Lot Developments on Streams Without Established Base Flood Elevations and/or Floodway (A-Zones). 1. For a residential single-lot development not part of a subdivision that has areas of special flood hazard or areas of future-conditions flood hazard, where streams exist but no base flood data have been provided (A-Zones), the Floodplain Ordinance Administrator will review and reasonably utilize any available scientific or historic flood elevation data, base flood elevation and floodway data, or future-conditions flood elevation data available from a federal, state, local or other source, in order to administer the provisions and standards of this ordinance. 2. If data are not available from any of these sources, the following provisions apply: a. No encroachments, including structures or fill material, can be located within an area equal to twice the width of the stream or 50 feet from the top of the bank of the stream, whichever is greater. b. In special flood hazard areas or future-conditions flood hazard areas without base flood or future-conditions flood elevation data, new construction and substantial improvements must have the lowest floor of the lowest enclosed area (including basement) elevated no less than 3 feet above the highest adjacent grade at the building site. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces must be provided for flood prone enclosures in accordance with Sec. 12.7.5.A.5. E. Areas of Shallow Flooding (AO-Zones). Areas of special flood hazard or areas of future-conditions flood hazard may include designated "AO" shallow flooding areas. These areas have base flood depths of 1 to 3 feet above ground, with no clearly defined channel. In these areas the following provisions apply: 1. All new construction and substantial improvements of residential and nonresidential structures must have the lowest floor, including basement, elevated to no lower than 1 foot above the flood depth number in feet specified on the Flood Insurance Rate Map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, must be elevated at least 3 feet above the highest adjacent grade. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces must be provided in accordance with standards of Sec. 12.7.5.A.5.; 2. New construction and substantial improvement of a nonresidential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus 1 foot above the highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect must certify that the design and methods of construction are in accordance with accepted standards of practice and shall provide such certification to the Floodplain Ordinance Administrator using the FEMA Floodproofing Certificate along with the design and operation/maintenance plan; and 3. Drainage paths must be provided to guide flood water around and away from any proposed structure. F. Standards for Subdivisions of Land. 1. All subdivision proposals must identify the Areas of Special Flood Hazard and Areas of Future-conditions Flood Hazard therein and provide base flood elevation data and future-conditions flood elevation data; 2. All residential lots in a subdivision proposal must have sufficient buildable area outside of the future-conditions floodplain so that encroachments into the future-conditions floodplain for residential structures will not be required; 3. All subdivision plans must provide the elevations of proposed structures in accordance with Sec. 12.7.3.B.

(Ord. No. 2021-06-11, § 1, 6-14-2021)