§ 12.9.3 — Design Standards
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 12.9.3
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/2d0d2e51-c1fe-4f3f-8a81-520488730f4b
12.9.3. - Design Standards
A. Refuse areas shall be clear of overhead power lines. B. Refuse areas shall be required to have a 10-foot approach paved with concrete. C. Refuse areas shall not be located next to drive-through access lanes. D. Any site that is required to have a commercial container (dumpster) shall install a pad in accordance with this Section, the City of Roswell Standard Construction Specification or the Fulton County Standard Construction Specifications as applicable.
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
