12.7.4. - Standards for Development

A. Definition of Floodplain Boundaries. 1. Studied "A" zones, as identified in the FIS, must be used to establish base flood elevations whenever available. 2. For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations will be provided by the Floodplain Ordinance Administrator. If future-conditions elevation data is not available from the Floodplain Ordinance Administrator, then it must be determined by a licensed professional engineer using a method approved by FEMA and the Floodplain Ordinance Administrator. B. Definition of Floodway Boundaries. The width of a floodway must be determined from the FIS or FEMA approved flood study. For all streams with a drainage area of 100 acres or greater, the regulatory floodway will be provided by the Floodplain Ordinance Administrator. If floodway data is not available from the Floodplain Ordinance Administrator, it must be determined by a licensed professional engineer using a method approved by FEMA and the Floodplain Ordinance Administrator. C. General Standards. 1. No development is allowed within any Area of Special Flood Hazard or Area of Future-conditions Flood Hazard that could result in any of the following: a. Raising the base flood elevation or future-conditions flood elevation equal to or more than 0.01 foot; b. Reducing the base flood or future-conditions flood storage capacity; c. Changing the flow characteristics as to the depth and velocity of the waters of the base flood or future-conditions flood as they pass both the upstream and the downstream boundaries of the development area; or, d. Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation. 2. Any development within any Area of Special Flood Hazard or Area of Future-conditions Flood Hazard allowed under paragraph C.1 above must also meet the following conditions: a. Compensation for storage capacity must occur between the average ground water table elevation and the base flood elevation for the base flood, and between the average ground water table elevation and the future-condition flood elevation for the future-conditions flood, and lie either within the boundaries of ownership of the property being developed and must be within the immediate vicinity of the location of the encroachment. Acceptable means of providing required compensation include lowering of natural ground elevations within the floodplain, or lowering of adjoining land areas to create additional floodplain storage. In no case can any required compensation be provided via bottom storage or by excavating below the elevation of the top of the natural (pre-development) stream channel unless the excavation results from the widening or relocation of the stream channel; b. Cut areas must be stabilized and graded to a slope of no less than 2%; c. Effective transitions must be provided so that flow velocities occurring on both upstream and downstream properties are not increased or decreased; d. Verification of no-rise conditions (0.01 foot or less), flood storage volumes, and flow characteristics must be provided via a step-backwater analysis meeting the requirements of Sec. 12.7.4.D.; e. Public utilities and facilities, such as water, sanitary sewer, gas, and electrical systems, must be located and constructed to minimize or eliminate infiltration or contamination from flood waters; and f. Any significant physical changes to the base flood floodplain must be submitted as a Conditional Letter of Map Revision (CLOMR) or Conditional Letter of Map Amendment (CLOMA), whichever is applicable. The CLOMR submittal is subject to approval by the Floodplain Ordinance Administrator using the FEMA community Concurrence forms before forwarding the submittal package to FEMA for final approval. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval is the responsibility of the applicant. Within 6 months of the completion of development, the applicant must submit as-built surveys and plans for a final Letter of Map Revision (LOMR). D. Engineering Study Requirements for Floodplain Encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and floodways. This study must be prepared by a licensed professional engineer and made a part of the application for a permit. This information must be submitted to and approved by the Floodplain Ordinance Administrator prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. The study must include: 1. Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development; 2. Step-backwater analysis, using a FEMA-approved methodology approved by the Floodplain Ordinance Administrator. Cross-sections (which may be supplemented by the applicant) and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles; 3. Floodplain storage calculations based on cross-sections (at least 1 every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development; 4. The study must include a preliminary plat, grading plan, or site plan, as appropriate, which must clearly define all future-conditions floodplain encroachments. E. Floodway Encroachments. Located within areas of special flood hazard or areas of future-conditions flood hazard are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity flood waters, debris or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions apply: 1. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway, except for activities specifically allowed in paragraph 2 below; 2. Encroachments for bridges, culverts, roadways and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment will not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A licensed professional engineer must provide supporting technical data and certification; and 3. If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway will be issued by the Floodplain Ordinance Administrator until an affirmative Conditional Letter of Map Revision (CLOMR) is issued by FEMA or a no- rise certification is approved by the Floodplain Ordinance Administrator. F. Maintenance Requirements. The property owner is responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on the property so that the flood-carrying or flood storage capacity is maintained. The Floodplain Ordinance Administrator may direct the property owner (at no cost to the City) to restore the flood-carrying or flood storage capacity of the floodplain if the owner has not performed maintenance as required by the approved floodplain management plan on file with the Floodplain Ordinance Administrator.

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.