For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.20.020 — Definitions

Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 16.20.020

Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/e3e021b8-f05d-4613-82e3-0112aaa501c2

§ 16.20.020: Definitions.

(A) For the purposes of clarification, the following definitions are provided and become a part of and applicable to the purposes, policies, regulations, requirements, provisions, specifications, and applications of this chapter. (B) In some instances, a definition incorporated herein establishes policy within the definition, and such establishment of policy shall have the same effect as if the policy were established in another section of this chapter. (C) The definitions established in this section shall be the effective definitions for certain terminology used within this chapter, and within documents, activities, and exchanges of dialogue appended to or associated with this chapter. (D) When a definition given in this section or chapter conflicts or varies with a definition given in a document other than this section or chapter, the definition given in this section or chapter will prevail as the operative definition relative to the requirements of and regulation under this chapter. (E) Terminology not specifically defined in this section or chapter will have the meaning commonly understood in the technology or industry relevant to the use of the terminology, or will have the most relevant meaning given in Webster’s Collegiate Dictionary. (F) The following definitions are incorporated by this chapter and shall apply throughout unless the context clearly indicates another meaning: “Agricultural conservation practices” means practices that are constructed on agricultural land for the purposes of controlling soil erosion and sedimentation. These practices include grass waterways, sediment basins, terraces, and grade stabilization structures. “Agricultural land-disturbing activity” means tillage, planting, cultivation, or harvesting operations for the production of agricultural or nursery vegetative crops. The term also includes pasture renovation and establishment, the construction of agricultural conservation practices, and the installation and maintenance of agricultural drainage tile. For the purposes of this chapter, the term does not include land-disturbing activities for the construction of agricultural-related facilities such as barns, buildings to house livestock, roads associated with infrastructure, agricultural waste lagoons and facilities, lakes and ponds, wetlands, and other infrastructure. “Authorized enforcement agency” or “agency” means the City Engineer’s office or Board of Public Works or employee thereof. “BMP” or “best management practice” means any structural or nonstructural control measure utilized to improve the quality and, as appropriate, reduce the quantity of storm water runoff. The term includes schedules of activities, prohibitions of practice, treatment requirements, operation and maintenance procedures, use of containment facilities, land use planning, policy techniques, and other management practices. “Board” means the City of Evansville Board of Public Works. “Certified technician” means a qualified professional or trained individual who has received training through coursework and continuing education specifically prescribed, provided, or approved by the Indiana Department of Environmental Management (IDEM). Training should enable the individual to be proficient and qualified to select or supervise the selection of, install or supervise the installation of, manage, inspect, evaluate, and report on erosion control measures (ECMs) and best management practices (BMPs) related to storm water quantity, quality, and pollution rate. “Commissioner” means the Commissioner of IDEM. “Construction activity” means land-disturbing activities associated with the construction of infrastructure or structures. This term does not include routine ditch or road maintenance or minor landscaping projects. “Construction plan” means a representation of a project site and all activities associated with the project. The plan includes the location of the project site, buildings and other infrastructure, grading activities, schedules for implementation, and other pertinent information related to the project site. A storm water pollution prevention plan (SWP3) is a part of the construction plan. “Construction project” or “project” means an organized effort to start, conduct, manage, and complete a single construction activity, or a series of construction activities. “Construction project site” means the physical location or locations where a construction project is being accomplished, or the physical or legal boundaries within which a construction activity or a series of construction activities are planned to be or are being accomplished. “Construction site access” means a stabilized stone surface at all points of ingress or egress to a project site for the purpose of capturing and detaining sediment carried by tires of vehicles or other equipment entering or exiting the project site. “Contractor” or “subcontractor” means an individual or company hired by the project site or individual lot owner, their agent, or the individual lot operator to perform services on the project site. “Conveyance” means any structural process for transferring storm water between at least two points. The term includes piping, ditches, swales, curbs, gutters, catch basins, channels, storm drains, and roadways. “Department” means the Indiana Department of Environmental Management (IDEM), the National Pollutant Discharge Elimination System (NPDES) permitting authority for the State of Indiana. “Developer” means any person financially responsible for construction activity or an owner of property who sells or leases, or offers for sale or lease, any lots in a subdivision. “Drain” means an open channel or a pipe, or combination thereof, implemented to gather, convey, store, treat, and release storm water runoff. “Erosion” means the detachment and movement of soil, sediment, or rock fragments by water, wind, ice or gravity. “Erosion and sediment control measure” means a practice, or a combination of practices, to control erosion and resulting sedimentation. “Erosion and sediment control system” means the use of appropriate erosion and sediment control measures to minimize sedimentation by first reducing or eliminating erosion at the source and then, as necessary, trapping sediment to prevent it from being discharged from or within a project site. “Final stabilization” means the establishment of permanent vegetative cover or the application of a permanent, nonerosive material to areas where all land-disturbing activities have been completed and no additional land-disturbing activities are planned under the current permit. “Grading” means the cutting and filling of the land surface to a desired slope or elevation. “Impervious surface” means surfaces, such as pavement and rooftops, that prevent the infiltration of storm water into the soil. “Individual building lot” means a single parcel of land within a multi-parcel development. “Individual lot operator” means a contractor or subcontractor working on an individual building lot. “Individual lot owner” means a person who has financial control of construction activities for an individual lot. “Land-disturbing activity” means any manmade change of the land surface, including removing vegetative cover that exposes the underlying soil, excavating, filling, transporting, and grading. “Larger common plan of development or sale” means a plan, undertaken by a single developer or a group of developers acting in concert, to offer lots for sale or lease; where such land is contiguous or is known, designed, purchased, or advertised as a common unit or by a common name, such land shall be presumed as being offered for sale or lease as part of a larger common plan. The term also includes phased construction by a single entity for its own use. “Legally binding agreement” means a written, enforceable legal document used to describe responsibilities between joint permittees or other entities. “Maximum extent practicable” or “MEP” means the greatest degree of fair, economic, practical, successful, and appropriate control and treatment that reasonably can be expected to result from the diligent application of control measures, management practices, requirements, and regulations implemented to cause the adequate effects intended by the control measures, management practices, requirements, and regulations. “Measurable storm event” means a precipitation event that results in a total measured accumulation of precipitation equal to or greater than one-half inch of rainfall. “MS4 area” means a land area comprising one or more places that receives coverage under one NPDES storm water permit regulated by 327 IAC 15-13 or 5-4-6(a)(4) and 5-4-6(a)(5). “MS4 operator” means the person responsible for development, implementation, or enforcement of the minimum control measures (MCMs) for a designated MS4 area regulated under 327 IAC 15-13. “Municipal separate storm sewer system” or “MS4” means a conveyance or system of conveyances, including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains, that is: (1) Owned or operated by a: (a) Federal, State, City, Town, County, district, association, or other public body (created by or pursuant to State law) having jurisdiction over storm water, including special districts under State law such as a sewer district, flood control district, or drainage district, or similar entity, or a designated and approved management agency under Section 208 of the Clean Water Act (33 USCA 1288) that discharges into waters; or (b) Privately owned storm Water Utility, hospital, university, or college having jurisdiction over storm water that discharges into waters of the State; (2) Designed or used for collecting or conveying storm water; (3) Not a combined sewer; and (4) Not part of a publicly owned treatment works (POTW) as defined in 40 CFR 122.2. “Mutual drain” means a drainage system that is located on two or more tracts of land that are under different ownership, established by the mutual consent of all owners, and not established under or made subject to any drainage statute. “Notice of plan approval” or “NPA” means a notification from the MS4 operator to the project site owner that the construction plan for a project site has been reviewed and approved by the MS4 operator. The project site owner must insert the NPA with the notice of intent (NOI) letter sent to the department at least 48 hours prior to initiating construction activities at the project site. “Peak discharge” means the maximum rate of flow during a storm, usually in reference to a specific design storm event. “Permanent stabilization” means the establishment, at a uniform density of 70 percent across the disturbed areas, of vegetative cover or permanent nonerosive material that ensures the resistance of the underlying soil to erosion, sliding, or other movement. “Phasing of construction” means sequential development of smaller portions of a large project site, stabilizing each portion before beginning land disturbance on subsequent portions, to minimize exposure of disturbed land to erosion. Project. See “Construction project.” “Project site” means the entire area on which construction activity is to be performed. “Project site owner” means the person required to submit a notice of intent (NOI) letter under 327 IAC 15-5 (Rule 5) and required to comply with the terms of Rule 5, including either a developer or a person who has financial and operational control of construction activities, project plans and specifications, and the ability to make modifications to those plans and specifications. “Rule 5” means 327 IAC 15-5, as adopted in 2003, requiring NPDES permits for construction activities disturbing one acre or greater of land and specific planning and management measures regarding storm water quality and quantity. “Rule 13” means 327 IAC 15-13, implementing the NPDES Phase II Federal mandates requiring MS4 entities to implement specific minimum control measures (MCMs) regarding storm water runoff from land use activities in urbanized areas. “Runoff” means an accumulation of storm water flow that moves across the surface of the earth as sheet flow or concentrated flow in natural surface watercourses, drains, or waterways. “Sediment” means solid material (both organic and mineral) that is in suspension, is being transported, or has been moved from its site of origin by air, water, gravity, or ice and has come to rest on the earth’s surface. “Sedimentation” means the settling and accumulation of unconsolidated sediment carried by storm water runoff. “Soil” means the unconsolidated mineral and organic material on the surface of the earth that serves as the natural medium for the growth of plants. “Soil and Water Conservation District” or “SWCD” means a political subdivision established under IC 14-32. “Storm water pollution prevention plan” or “SWP3” means a plan developed to minimize the impact of storm water pollutants resulting from construction activities. “Storm water quality measure” means a practice or combination of practices to control or minimize pollutants associated with storm water runoff. “Strip development” means a multi-lot project where building lots front on an existing road. Subcontractor. See “Contractor.” “Temporary stabilization” means the covering of soil to ensure its resistance to erosion, sliding, or other movement. The term includes vegetative cover, anchored mulch, or other nonerosive materials applied at a uniform minimum density of 70 percent across the disturbed area. “Tracking” means the deposition of soil that is transported from one location to another by tires, tracks of vehicles, or other equipment. “Trained individual” means an individual who is trained and experienced in the principles of storm water quality, including erosion and sediment control, as may be demonstrated by State registration, professional certification, experience, or completion of coursework that enable the individual to make judgments regarding storm water control or treatment and monitoring.

( 1983 Code § 9.98(B).02 ; Ord. G-2008-11 § 1, passed 4-9-2008 )

Ask a question about Evansville law

Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.