§ 16.20.170: Project termination.
(A) Regular Termination of a Project. The project site owner must plan an orderly and timely termination of construction activities, including the implementation of storm water quality measures that are to remain on the project site. (B) The project site owner must submit a notice of termination (NOT) letter to the department, and transmit a copy of the NOT to the agency or MS4 operator in accordance with this section. (C) Except as provided in subsection (E) of this section, the project site owner shall submit an NOT letter only when the following conditions have been met: (1) All land-disturbing activities, including construction on all building lots, have been completed and the entire site has been stabilized. (2) All temporary erosion and sediment control measures have been removed. (D) The NOT letter must contain a statement, verified by the MS4 operator, that each of the conditions in subsection (C) of this section have been met. (E) Early Release Termination. The project site owner may submit an NOT letter to obtain early release from compliance with this chapter, and from permit regulation under 327 IAC 15-5, if the following conditions are met: (1) The project site owner has notified existing owners of title of the remaining undeveloped lots that the individual lot owners and the individual lot operators will be responsible for the implementation, management, and timely removal of storm water quality measures appropriate and sufficient to meet the requirements, provisions, and regulations of this chapter, and for final stabilization of the individual lot in accordance with this chapter. (2) The project site owner has recorded a copy of each of the notifications to the property owners in the record appropriate for chain of title documents in the office of the Vanderburgh County Recorder. (3) The project site owner has provided the MS4 operator with verification of the recording of the notification documents and verification of their delivery to the affected property owners of record. (4) The remaining undeveloped acreage does not exceed five acres, with contiguous undeveloped areas not to exceed one acre in aggregate. (5) A map of the project site, clearly identifying all remaining undeveloped lots, is attached to the NOT letter sent to IDEM, with a copy sent to the MS4 operator. (6) The map must be accompanied by a list of names and addresses of individual lot owners of title of all undeveloped lots, and, if applicable, the individual lot operators. (7) All public and common improvements, including infrastructure and storm water drainage facilities in accordance with the approved construction plans and applicable plans approved by the board, have been completed and permanently stabilized and have been transferred to the appropriate local entity, homeowners association, or applicable property owner or land management entity. (8) The remaining acreage does not pose a significant threat to the integrity of the infrastructure, adjacent properties, or water quality. (9) All permanent storm water quality measures have been implemented and are operational. (F) IDEM requires a notice to subsequent lot owners and lot operators in accordance with the State rule. Following the acceptance of the NOT letter and written approval from IDEM for early release under 327 IAC 15-5-8(b), a project site owner shall notify all current individual lot owners and all subsequent individual lot owners of the remaining undeveloped acreage and acreage with construction activity that they are responsible for complying with 327 IAC 15-5-7.5. The notice must contain a statement verified by the MS4 operator that each of the conditions enumerated in subsection (E) of this section have been met; and the project site owner must inform the individual owners of remaining undeveloped lots of the following two requirements: (1) To install and maintain appropriate measures to prevent sediment from leaving the individual building lots; and (2) To maintain all erosion and sediment control measures that are to remain on site as part of the construction plan. (G) Final Inspection Prior to Early Release NOT. The agency or MS4 operator must inspect the project site to evaluate the adequacy of the remaining storm water quality measures and compliance with the NOT letter requirements, and make a relevant report to IDEM. If the inspecting entity finds that the project site owner has sufficiently filed an NOT letter, the MS4 operator shall forward (verified NOT) notification to IDEM. Upon receipt of the verified NOT letter by IDEM, and receipt of written approval from IDEM, the project site owner shall no longer be responsible for compliance with 327 IAC 15-5. (H) Post-Permit Responsibility for Maintenance. After a verified NOT letter has been submitted for a project site, and approved by IDEM, maintenance of the remaining storm water quality measures will be the responsibility of the individual lot owner or occupier of the property in accordance with this chapter and other applicable local codes.
( 1983 Code § 9.98(B).17 ; Ord. G-2008-11 § 1, passed 4-9-2008 )
Ask a question about Evansville law
Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.