For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.20.080 — Notice of intent (NOI) letter requirements

Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 16.20.080

Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/a19718fb-78e9-483e-8477-e8fa0344ad94

§ 16.20.080: Notice of intent (NOI) letter requirements.

(A) For any new construction activity that will result in land disturbance equal to or greater than one acre, the project site owner must submit to the department a complete NOI letter in accordance with this chapter and 327 IAC 15-5. (B) The NOI letter must be comprised of and otherwise comply with the following criteria: (1) Name, mailing address, and location of the project site for which the notification is submitted. (2) The project site owner’s name, address, telephone number, e-mail address (if available), and ownership status as Federal, State, public, private, or other entity. (3) Contact person (if different than project site owner), person’s name, company name, address, e-mail address (if available), and telephone number. (4) A brief description of the construction project, including a statement of the total acreage of the project site. Total acreage claimed in the NOI letter shall be consistent with the acreage covered in the construction plan. (5) Estimated dates for the initiation and completion of construction activities. Within 48 hours of the initiation of construction activity, the project site owner must notify the department and the agency or MS4 operator of the actual project start date. (6) The latitude and longitude of the approximate center of the project site to the nearest 15 seconds, and to the nearest quarter section, township, range, and civil township in which the project site is located. (7) Total impervious surface area, in square feet, of the final project site including structures, roads, parking lots, and other similar improvements. (8) The number of acres to be involved in the construction activities. (9) Proof of publication in a newspaper of general circulation in the affected area that notified the public that a construction activity is to commence, that states: (owner’s name and address) is submitting an NOI letter to notify the Indiana Department of Environmental Management of our intent to comply with the requirements under 327 IAC 15-5 to discharge storm water from construction activities for the following project. Runoff from the project site will discharge to (stream(s) receiving the discharge(s)). (10) As applicable, a list of all MS4 areas designated under 327 IAC 15-13 within which the project site lies. (11) A written certification by the operator that: (a) The storm water quality measures included in the construction plan comply with the requirements under this chapter, and under 327 IAC 15-5-6.5, 15-5-7, and 15-5-7.5, and that the SWP3 complies with all applicable Federal, State, and local storm water requirements; (b) The measures required by 327 IAC 15-5-7 will be implemented in accordance with the SWP3; (c) If the projected land disturbance is one acre or more, every applicable construction plan reviewing entity designated by the department has been sent a copy of the construction plan for review; (d) Storm water quality measures beyond those specified in the SWP3 will be implemented during the life of the permit if necessary to comply with 327 IAC 15-5-7; and (e) Implementation of storm water quality measures will be inspected by trained individuals. (12) The name of the receiving water or, if the discharge is to an MS4, the name of the MS4 operator and the ultimate receiving water. (13) The NOI letter must be signed by a person meeting the signatory requirements in 327 IAC 15-4-3(g). (14) A notification from each applicable construction plan reviewing entity designated by the department indicating that the construction plans are sufficient to comply with 327 IAC 15-5. This requirement may be waived if the project site owner has not received notification from the reviewing agency within the time frame specified in EMC § 16.20.070. (C) After the project site owner has received notification from the MS4 operator that the construction plans meet the requirements of this chapter or the review period has expired, all NOI letter information required in subsection (B) of this section must be submitted to the department at least 48 hours prior to the initiation of land-disturbing activities at the project site. A copy of the completed NOI letter also must be sent to the MS4 operator. If the NOI letter is deficient, the project site owner must address the deficient items and submit an amended NOI letter to the department at the address specified in subsection (D) of this section. (D) The project site owner must send, or cause to be sent, the NOI letter to: Attention: Rule 5 Storm Water Coordinator Indiana Department of Environmental Management Office of Water Quality, Urban Wet Weather Section 100 North Senate Avenue Indianapolis, Indiana 46206-6015

( 1983 Code § 9.98(B).08 ; Ord. G-2008-11 § 1, passed 4-9-2008 )

Ask a question about Evansville law

Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.