§ 16.20.090: Construction plan requirements for a major project site.
(A) For project sites that do not meet the criteria for a small, residential development in EMC § 16.20.100, a project site owner must develop and submit a set of construction plans. Storm water quality measures included in the plan must achieve the minimum project site requirements specified in EMC §§ 16.20.110 and 16.20.130. The construction plans must include the following components, content, requirements, and provisions as hereinafter provided. (B) The construction plan must include the following eight major components: (1) Project narrative and supporting documents; see subsection (D) of this section. (2) Vicinity map; see subsection (E) of this section. (3) Existing project site layout; see subsection (F) of this section. (4) Final project site layout; see subsection (G) of this section. (5) Grading plan or land-disturbing activity plan; see subsection (H) of this section. (6) Storm water drainage plan; see subsection (I) of this section. (7) Construction phase SWP3; see subsection (J) of this section. (8) Post-construction SWP3; see subsection (K) of this section. (C) Each of the eight major components of the construction plan must consist of the following subcomponents and their subdivisions of content. (D) Project narrative and supporting documents, including the following information: (1) An index indicating the location, in the construction plan, of all information required by this section. (2) Description of the nature and purpose of the project. (3) Legal description of the project site. The description must be to the nearest quarter section, township, and range, and include the civil township. (4) Soil properties, characteristics, limitations, and hazards associated with the project site, and the measures that will be integrated into the project to overcome or minimize adverse soil conditions. (5) General construction sequence of how the project site will be built, including phases of construction. (6) Hydrologic unit code (14-digit) available from the United States Geologic Survey (USGS) to indicate within which watershed or watersheds the project site lies. (7) A reduced plat or project site map showing lot numbers, lot boundaries, road layout and names. The reduced plat must be legible and submitted on a sheet or sheets no larger than 11 inches by 17 inches for all phases or sections of the project. (8) Identification of any other State or Federal water quality permits that are required for construction activities associated with the owner’s project site. (E) Vicinity map depicting the project site’s location in relationship to recognizable local landmarks, cities, towns, major roads, and railways. The applicable portion of a USGS topographical quadrangle map, or County or municipal road map with the project site limits in ink will suffice. (F) An existing project site layout that must include the following information: (1) Location and name of all wetlands, lakes, streams, waterways, and drains on, or adjacent to, the project site. (2) Location of all existing structures on the project site. (3) One-hundred-year floodplains, floodway fringes, and floodways. Note if none exist. (4) Soil map of the predominant soil types, as determined by the United States Department of Agriculture NRCS Soil Survey, or equivalent publication, or as determined by a soil scientist. The soil map must include a soil legend. (5) Identification and delineation of the pre-development vegetative cover such as grass, weeds, brush, and trees on the project site. (6) Land use of all adjacent properties. (7) Existing topography at a contour interval appropriate to indicate drainage patterns. The MS4 operator will determine the appropriateness of the contour intervals. (G) Final project site layout, including the following information: (1) Location of all proposed site improvements including roads, utilities, lot delineations and identifications, proposed structures and common areas. (2) One-hundred-year floodplains, floodway fringes and floodways. Note if none exist. (3) Proposed final topography, at a contour interval appropriate to indicate drainage patterns. The MS4 operator will determine the appropriateness of the contour intervals. (H) A grading plan, including the following information: (1) Delineation of all proposed land-disturbing activities, including off-site activities that will provide services to the project site. (2) Location of all soil stockpiles and borrow areas. (3) Information regarding any off-site borrow, stockpile, or disposal areas that are associated with the project site and under the control of the project site owner. (4) Existing and proposed topographic information per subsections (F)(7) and (G)(3) of this section. (I) A drainage plan, including the following information: (1) An estimate of the peak discharge, based on the 10-year storm event, of the project site for both pre-construction and post-construction conditions. (2) Location, size, and dimensions of all components of the storm water drainage systems such as inlets, culverts, storm sewers, and conveyance channels. (3) Locations where storm water potentially will be directly discharged into ground water, such as abandoned wells or sinkholes. Note if none exist. (4) Location of every specific point where storm water discharge will leave the project site. (5) Name of all receiving waters. If a discharge is to a separate MS4, identify the name of the MS4 operator and the name of the ultimate receiving water. (6) Location, size, and dimensions of features such as permanent retention or detention facilities, including existing or manmade wetlands, used for the purpose of storm water management. (J) An SWP3 Associated with Construction Activities. The SWP3 must be assembled to meet, at a minimum, the requirements, provisions, and criteria of EMC § 16.20.110, 16.20.130 and 16.20.140, and must include the following: (1) Location, dimensions, detailed specifications, and construction details of all temporary and permanent storm water quality measures, ECMs, and BMPs. (2) Temporary stabilization plans and sequence of implementation. (3) Permanent stabilization plans and sequence of implementation. (4) Final stabilization plans. (5) All stabilization plans shall include the following: (a) Specification and application rates for soil amendments and seed mixtures. (b) The type and application rate for anchored mulch. (c) Other applicable data as may be required by the MS4 operator. (6) Construction sequence describing the relationship between implementation of storm water quality measures, ECMs, and BMPs, and the stages of construction activities. (7) The project site owner’s self-monitoring program including plan implementation and procedures. (8) A description of potential pollutant sources associated with construction activities that may reasonably be expected to add a significant amount of pollutants to storm water discharges. (9) Material handling and storage associated with construction activities that shall meet the spill prevention and spill response requirements in 327 IAC 2-6-1. (K) The Post-Construction SWP3. The post-construction SWP3 must include the following information: (1) A description of potential pollutant sources from the project site’s proposed land use, which sources may reasonably be expected to add a significant amount of pollutants to storm water discharges from the post-construction project site. (2) Location, dimensions, detailed specifications, and construction details of all post-construction storm water quality measures and BMPs adequate to address subsection (K)(1) of this section. (3) A description of control measures and BMPs that will be installed to control pollutants in storm water discharges that will occur after construction activities have been completed. Such measures and practices include infiltration of storm water runoff; flow reduction by use of open vegetated swales and natural depressions; installation of filter strips, buffer strips, parking lot tree islands, and riparian zones; minimization of land disturbance and surface imperviousness; maximization of open space; and storm water retention and detention ponds. (4) A sequence describing when each post-construction storm water quality measure and BMP will be installed. (5) Storm water quality measures and BMPs that will remove or minimize pollution from storm water runoff within or from the project site. (6) Storm water quality measures and BMPs that will be implemented to prevent or minimize adverse impacts to stream and riparian habitat. (7) A narrative description of the maintenance guidelines for all post-construction storm water quality measures and BMPs to facilitate their proper long-term function. (8) A verifiable procedure, such as recorded plat notices and covenants, by which the narrative description of water quality measure and BMP maintenance guidelines will be made available to future parties who will assume responsibility for the operation and maintenance of the post-construction storm water quality measures and BMPs. (L) Plan and profile sheets, project site layouts, plats, and vicinity maps must be drawn to a standard engineering scale as indicated on each sheet, plat, or map, and be oriented north as indicated by a north arrow on each sheet, plat, or map. All dimensions must be accurately scaled, drawn, and labeled with dimensions given in feet and tenths of a foot. (M) Revision of Approved Construction Plans. The requirements for construction plan content enumerated in this section are qualified by the following statements: (1) The agency or MS4 operator may require, upon finding reasonable cause, the revision of a construction plan if it is determined that a modification or modifications are necessary to accomplish adequate control of the quantity or quality of storm water runoff, in accordance with this chapter or with applicable Federal, State, and local rules, from a project site due to site conditions or project specification changes identified, effected, or extant during or after plan review and approval. (2) If the agency or MS4 operator requests a revised construction plan under this subsection, the project site owner must submit the revised plan to the appropriate entity or entities within 21 calendar days of the request for plan revision.
( 1983 Code § 9.98(B).09 ; Ord. G-2008-11 § 1, passed 4-9-2008 )